Alan Hinton March, 2006
Slide 1
NEW!NEW! ‘YEFB’‘YEFB’ HIGH PRESSURE HIGH PRESSURE BLOWER UNITSBLOWER UNITS
![Page 2: NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS](https://reader035.fdocuments.in/reader035/viewer/2022081816/56812d16550346895d92008f/html5/thumbnails/2.jpg)
Alan Hinton March, 2006
Slide 2
YEFB SPECIFICATIONYEFB SPECIFICATION• COOLING DUTY RANGE 4-24KWCOOLING DUTY RANGE 4-24KW
• 2&4 PIPE SYSTEMS2&4 PIPE SYSTEMS
• CHOICE OF 3 OR 4 ROW COOLING COILCHOICE OF 3 OR 4 ROW COOLING COIL
• HIGH STATIC PRESSURES – UP TO 250PaHIGH STATIC PRESSURES – UP TO 250Pa
• MADE OF 1.0mm GALVANISED SHEET STEELMADE OF 1.0mm GALVANISED SHEET STEEL
• 10mm THICK CLOSED CELL FOAM INSULATION10mm THICK CLOSED CELL FOAM INSULATION
• JCI VALVES (MODULATING OR ON/OFF)JCI VALVES (MODULATING OR ON/OFF)
![Page 3: NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS](https://reader035.fdocuments.in/reader035/viewer/2022081816/56812d16550346895d92008f/html5/thumbnails/3.jpg)
Alan Hinton March, 2006
Slide 3
YEFB OPTIONSYEFB OPTIONS• PAINTED FINISHPAINTED FINISH
• DISCHARGE PLENUMSDISCHARGE PLENUMS
• CONDENSATE PUMPSCONDENSATE PUMPS
• HANDED COILSHANDED COILS
• SUPPLEMENTARY HOT WATER OR ELECTRIC HEATER OPTIONSUPPLEMENTARY HOT WATER OR ELECTRIC HEATER OPTION
• RANGE OF ROOM MOUNTED CONTROLLERSRANGE OF ROOM MOUNTED CONTROLLERS
• F5 FILTER OPTIONF5 FILTER OPTION
![Page 4: NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS](https://reader035.fdocuments.in/reader035/viewer/2022081816/56812d16550346895d92008f/html5/thumbnails/4.jpg)
Alan Hinton March, 2006
Slide 4
PRICE vs COOLING CAPACITY
0
100
200
300
400
500
600
700
0 5 10 15 20
COOLING DUTY (kw)
PR
ICE
(€'
S)
YEFB
YFB
YEFB PRICING COMPARISONYEFB PRICING COMPARISON
YEFB gives better price vs. cooling capacity compared to previous YFB range
nominal conditions are referred to : e.s.p. =50/100 Pa dependent on unit size , air temperature = 27/19 °C , water temperature = 7/12 °C , 2 pipe system at medium speed.
![Page 5: NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS](https://reader035.fdocuments.in/reader035/viewer/2022081816/56812d16550346895d92008f/html5/thumbnails/5.jpg)
Alan Hinton March, 2006
Slide 5
YEFB PRICING COMPARISONYEFB PRICING COMPARISON
YEFB also gives better price per Kw compared to previous YFB range
nominal conditions are referred to : e.s.p. =50/100 Pa dependent on unit size , air temperature = 27/19 °C , water temperature = 7/12 °C , 2 pipe system at medium speed.
OUTPUT vs COST
0
10
20
30
40
50
60
0 2 4 6 8 10 12 14 16 18
OUTPUT (kw)
PR
ICE
/KW
CO
OL
ING
YEFB
YFB
![Page 6: NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS](https://reader035.fdocuments.in/reader035/viewer/2022081816/56812d16550346895d92008f/html5/thumbnails/6.jpg)
Alan Hinton March, 2006
Slide 6
YEFB PERFORMANCE DATAYEFB PERFORMANCE DATA