NEW ACUTE HOSPITAL, STOKMARKNES Development and solutions

59
NEW ACUTE HOSPITAL, STOKMARKNES Development and solutions 1 Commissioner: Nordlandssykehuset HF Architect: BOARCH arkitekter as Consultant structural engineering: Rambøll as Consultant technical engineering: Norconsult as Project administration: Hospitalitet as/ Hartmann Prosjektrådgivning as PRESENTATION AT THE IFHE WORLD CONGRESS 2012 Architect MNAL Svein Erik Tøien BOARCH arkitekter as

description

NEW ACUTE HOSPITAL, STOKMARKNES Development and solutions. PRESENTATION AT THE IFHE WORLD CONGRESS 2012 Architect MNAL Svein Erik Tøien BOARCH arkitekter as. Commissioner : Nordlandssykehuset HF Architect: BOARCH arkitekter as Consultant structural engineering : Rambøll as - PowerPoint PPT Presentation

Transcript of NEW ACUTE HOSPITAL, STOKMARKNES Development and solutions

Page 1: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

NEW ACUTE HOSPITAL, STOKMARKNESDevelopment and solutions

1

Commissioner: Nordlandssykehuset HF

Architect: BOARCH arkitekter asConsultant structural engineering: Rambøll asConsultant technical engineering: Norconsult as

Project administration: Hospitalitet as/ Hartmann Prosjektrådgivning as

PRESENTATION AT THE IFHE WORLD CONGRESS 2012Architect MNAL Svein Erik Tøien BOARCH arkitekter as

Page 2: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

2

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NORDLANDS-SYKEHUSET HF

NLSH Vesterålen

Page 3: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

3

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

AREA OF SERVICENLSH Vesterålen

Area Vesterålen – appr. 30.000 inhabitants

Page 4: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

4

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Population in capture area: Appr. 30.000 inhabitants

Function area: Appr 8000 m2

Gross area: Appr 14.900 m2

Budget frames: Appr 900 mill. NOK

Start construction: September 2010

Project planned finalised: August 2014

Normal beds incl maternity ward: 69

Observation beds: 5

Surveillance beds : 5

Post-surgery beds : 5

Outpatient treatment rooms: 26

Daycare places; dialysis, medical and surgical: 17 (7+5+5)

Operating theaters: 3+1

Birth rooms: 2

MAIN NUMBERSNLSH Vesterålen

Page 5: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Year 2000 – Existing environmentBOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

HSH Stokmarknes skisseprosjekt 17.06.03

Page 6: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

2001 – GENERAL PLANBOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

HSH Stokmarknes generalplan

© BO ARC H A R KITEKT ER A/S D E N N E TE GN ING E R B E S KY TT E T V ED LO V OM O PP H A V S R E TT T IL Å N D SV ER K A V 12 .5 .19 61 OG M Å IK K E K O P IE RE SE LLE R B EN Y TT E S U TE N A R K ITE KT EN S (O P P HA V S M AN N E N S ) SA M TY K K E .

98.017 STO KM A RKN ES SYKEHUS UTV IKLING SPLA NO PPDRA G SG IV ER: N FK EIEND O M SSEKSJ O NEN

A LTERN A TIV 1F, PLA N 1.ETG .

M = 1:1000 18.01.01 SET 01TEG N. N R.

FO AJÉ

LABO R A TO RIU M334

AD M .

P SYK .

R Ø NT G EN58 1

PO LIK LIN IKKER976

KAN TIN E167

DR IFTS GÅR D

KIO SK

A KU TT R Ø N TG EN

IT-AV D .118

LEG E KO NT O R ER10 0

M ED . KO N TO R TJ .356

R ES.

HO VED-IN NG .

© BO AR C H AR KITEKTER A /S D E N N E TE GN IN G E R B E S KY TT ET V E D LOV O M O PP H A V SR E TT TIL Å N D SV ER K AV 12 .5 .1961 O G M Å IK K E KO PIER E SE LLE R B EN YTT ES U T EN A R K ITE K TEN S (O PP H AV S M A N N EN S) SA MT YK K E.

98.017 STO KM A RKN ES SYKEHUS UTV IKLING SPLA NO PPD RA G SG IV ER: NFK EIEN DO M SSEKSJ O N EN

A LTERN A TIV 1F, PLA N 2.ETG .

M = 1:1000 18.01.01 SET 02TEG N. NR.

PSYK.

PSYK.

O P ERA SJO NA NE STESIS TER IL SEN T RA L557

A KU TT-S EKSJO N426

AKU TTM O TTAK182

AM BU LAN S EINN G .75

AM BU LAN SE-TJEN ES TE25 1

ÅP E NT N ED

VAK T

VA K T

S EN G EP O ST KIR .664

M ED .TEKN .4 1

LE G E-KO N T.15 0

LEG E-KO N T.200

Optimistic start – the existing structure is assumed to be fit for future use, demanding total renovation and reconfiguration…

Page 7: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Grouping of functions

BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

HSH Stokmarknes skisseprosjekt 17.06.03

Main entrance

CantineKiosk

Lab.

Outpatient

Script service

RadiologyResep-sjon

Ambulanse-inngang

Mottagelse Observasjon

Surgery

Acute section:Intensive careRecovery

Beds

Vakt

Radiology

Receipt

Main kitcen

Central supplies

Treatment functions

Technical plant

Technical dept

Laundry

Waste handeling

Bed- handeling

Cleaning services

Textile services

Beds

Public/outpatient functions Acute functions

Technical and administrative functions

…A simple pattern for logical grouping of functions was developed

Page 8: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

SKETCH PROJECT 2003

BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

HSH Stokmarknes skisseprosjekt 17.06.03

… and a first complete scedule for renovation and extentions to the hospital, is commissioned, compensating low buliding heights with creative use of glass and levels

Page 9: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as

2004 – SCETCH FOR A COMPACT, NEW HOSPITAL

HHF Stokmarknes idéprosjekt nybygg 25.02.04

UPPER LEVEL – «ACUTE»LOWER LEVEL – «PUBLIC»

… then, a year later, the regional health administration got a new director of medical profession, putting forth a strong urge to build new, instead of mending the old stuff…

Page 10: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

2004 – SKETCH PROJECT 2-3

HHF Stokmarknes skisseprosjekter 29.11.2004

10 V

Two alternative sketch projects followed, analyzing the differences in cost, and concluding that building new is the most economic solution.

MEDISINSK SENGEPOST

FØD

EA

VD

ELI

NG

AKKUTT SEKSJON

LEGEVAKTAMBULANSE SEKSJON

PARKERING

AMBULANSEBASE

BASE

BASE

BASE

BASE

BASE

OPPH.

ÅPEN

T N

EDÅP

EN

T N

ED

ÅPENT NED

ÅPENT NED

OPERASJONS AVDELING

POSTOPERATIV

DAGKIRURGI

FYSIOTERAPI

KAPELL

FELLESAREAL

SENGEPOST

RESEPSJON

VAKT

PSYK.

PSYK.

OPERASJONANESTESISTERILSENTRAL

AKUTT-SEKSJON

AKUTTMOTTAK

AMBULANSEINNG.

AMBULANSE-TJENESTE

ÅPENT NED

VAKT

VAKT

SENGEPOST MED.

ÅPENT NED

FØDEAVDELING

EKSP.

VENT

FØDEAVDELING

VAKT

SENGEPOST KIR.

VAKT

LEGEVAKT

ÅPENT

BASER

BASE

BASER

BASE

Page 11: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

NEW CONSIDERATIONS – SINTEF ENGAGED

BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

11

HHF Stokmarknes skisseprosjekt 2008

The project was then challenged on flexibility and generality. A period of thorough analysis and studies, led by SINTEF Health, followed...

Page 12: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

USER PARTICIPATION – TRYING OUT LAYOUTS

BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

12

HHF Stokmarknes skisseprosjekt 2008

… the users were invited to participate actively...

Page 13: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

SCETCH PROJECT 4 – 2008: INITIAL STUDIES13

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen utvikling skisseprosjekt 2008

10 2 7 8

4 3

6 5

1

All beds and acute functions on one level

Beds in 2 levels All beds in one level, divided from acute functions

Beds in 3 levels

… and the architects challenged the “usual” patterns of hospital layouts…

Page 14: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

STUDY OF OTHER HOSPITALS

Ringerike sykehus36 beds

Bærum sykehus24 beds

NLSH Vesterålen sketch project 200458 beds

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Visby lasarett30 beds

NLSH Bodø forprosjekt54 beds

NLSH Vesterålen utvikling skisseprosjekt 2008

St. Olavs hospital 48 beds

2008 – study of other hospitals’ bed areas

Page 15: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

SCETCH PROJECT 4 – 2008: INITIAL STUDIES

15

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen utvikling skisseprosjekt 2008

2A 7A 9A

11A 12A 13A

…trying out totally different shapes…

Page 16: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

SCETCH PROJECT 4 – 2008: INITIAL STUDIES16

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen utvikling skisseprosjekt 2008

2B 7A 9B

14A 8A

2008 – closing down to 5 alternatives

Page 17: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Alternativ 9B 3D from south17

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen utvikling skisseprosjekt 2008

2008 – one model showing signs of final layout

Page 18: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Bed clusters – early ideas18

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen utvikling skisseprosjekt 2008

Brainstorming around bed clusters – concluding that daylight into the middle of the cluster is essential

Page 19: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Sengeområde – bad til alle rom19

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen utvikling skisseprosjekt 2008

•Bending fasade to minimize length

Page 20: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Wing of bed clusters20

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Striving towards a compact sceme – but is it compact enough? • Gross/net factor in one wing appr. 1,7• Length 3 bed clusters appr. 78 m

NLSH Vesterålen skisseprosjekt 2008

Page 21: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Bed cluster – scheme21

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen skisseprosjekt 2008

WORKSTATION

SINGLEBED

DINING KITCH

TREAT-MENT

EXAMIN

Page 22: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

22

Flexibility in bed area – clusters linked BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

General bed clusters can be adapted to different needs for bed types

Page 23: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

23

The site in 2009 - before construction start

NLSH Vesterålen forprosjekt 2009

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Page 24: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as24

NLSH Vesterålen skisseprosjekt 2008

Most of the existing hospital buildings are plannet demolished after completion of the sceme

Exisiting site -

HADSELHALLEN

SYKEHJEM

PSYKIATRI

SITE BORDER

DR. THODES GATE

PSYK.

PSYK.

PARK.

?

?

SYKEHJEM

IVAR BERGSMOS GATE

PARK-VEIEN

BARNE-HAGE

HADSEL-HALLEN

BUILDINGSPLANNED DEMOLISHED

Page 25: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Intekno as Ingeniørtjeneste as

25

HHF Stokmarknes skisseprosjekter 29.11.2004

Cad-generated sun studies – revealing a shadowy southern part of the site from october to march

Sun studies of existing site 12. october/3. march kl 10 og 12

Kl. 10 Kl. 12

Page 26: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Sun studies of the building model26

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen skisseprosjekt 2008

Page 27: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Alternative 9C Climate analysis

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen skisseprosjekt 2008

Climate study analyzing wind and snowdrift – revaling needs for shielding vegetation

27

Page 28: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Sketch outdoor facilities28

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Wind-damping vegetation and atriums for exercise is part of the sceme

NLSH Vesterålen forprosjekt 2009

Page 29: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

29Pattern of expansionBOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Possible expansion in three directions

NLSH Vesterålen forprosjekt 2009

Page 30: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Site plan30

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Page 31: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Ground floor31

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detaljprosjekt

Plan ground floor: Main entrance, outpatient functions and technical service

Page 32: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

First floor 32

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detaljprosjekt

Upper/first floor: Acute entrance and inpatient functions

Acute reception, observation, surveillance

24 beds

24 beds 19 beds incl. pasient hotel

Operation

Birth

Page 33: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Second floor33

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detaljprosjekt

Administration and ventilation plants

Page 34: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Axonometry bed area34

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Each bed cluster has its defined «square», a defined architectural place for identification and belonging for the patients…

Page 35: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Perspective 3 bed clusters in a row35

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detaljprosjekt

Visibilty between the workstations was crucial in the layout

Page 36: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Axonometry bed cluster36

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Page 37: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Perspective bed cluster - I37

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Environment in one bed cluster…

Page 38: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Perspektiv bed cluster - II38

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

… seen across

Page 39: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Perspective bedroom39

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Environment in bedroom, with large bay window

Page 40: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Perspective patient-zone 40

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Each bed cluster features a zone for patient resting near the workstation, and with access to wintergarden/multi-use space

Page 41: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Vintergarden/play area41

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

…used for childrens play…

Page 42: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Wintergarden/tactile-/plant room42

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

…or plant/tactile room…

Page 43: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Main expedition 43

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

The main expedition is easily found by the main entrance

Page 44: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Corridor by surgical area44

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Circulation areas with daylight and wiews for orientation

Page 45: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Surveillance area45

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Extensive use of glass for contact between functions

Page 46: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

PLAN 2, FLØY B: SENGEROMNLSH VESTERÅLEN

HVITPIGMENTERT EIK DETALJER I FAST INVENTAR

GRØNT FARGETEMA: FONDVEGG & TEKSTILER

VINYLGULV:TARKETT IQ NATURAL 173

FONDVEGG SENGEROM, TUN B1:BUTINOX 5757 ”FRI”

FONDVEGG SENGEROM, TUN B2:NCS S 2030-G80Y

FONDVEGG SENGEROM, TUN B3:NCS S 2010-G30Y

NORTHERN LIGHTING ”DOKKA” PENDEL I KROM TIL SENGEROM

VEGG KORRIDOR,OVERFLATE FAST & LØST INVENTAR:NCS S0500-N

INTERIØRKONSEPT

OFFECCT ”GRIP” HVITT SIDEBORD, H440mm, M. TILHØRENDE BLOMSTERVASE (BORDPLATE I CORIAN)

LAMMHULTS ”CINEMA SPORT”, H450mm, I GABRIEL ”COMFORT 0049”

HELLAND ”GENT” HVILESTOL, H460mm, I GABRIEL ”COMFORT 0049”

46

BO

AR

CH

ark

itekt

er a

s

GARDIN:ALMEDAHLS ”UNI 75689-3”

Use of colours to give identity to different wings

Page 47: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Facade materials and details

NLSH Vesterålen forprosjekt 2009

Glass, aluminium, brick, stone and wood combined to emphasize the different elements of the buliding

Page 48: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Constructions

NLSH Vesterålen forprosjekt 2009

Gross bulding height 4,5 m, and flat beam-and-slab constructions allow flexibility for future changes in technical facilities

Page 49: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Plan culvert49

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detaljprosjekt

Main technical supplies are conducted via subway, passing along the core of the building wings. Economical limitations put a hold to establishing a complete basement…

Page 50: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Technical supply duct

NLSH Vesterålen forprosjekt 2009

Page 51: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Ventilation, heating

Ventilation plant rooms are located on roof, central on each wing, minimizing distances and duct dimensions. Calculated energy consumption 284 kWh/m2 and year

NLSH Vesterålen forprosjekt 2009

Page 52: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

Access, controll and security

NLSH Vesterålen forprosjekt 2009

Tegnforklaring: Åpen soneDelvis åpen soneLukket soneLukket felles soneLåste rom

Security combined with openness – ensured through extensive zoning

Page 53: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Perspective from north east53

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detaljprosjekt

Page 54: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Perspective from south west54

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detaljprosjekt

Page 55: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Atrium south55

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen forprosjekt 2009

Page 56: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Atrium north – training garden56

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detail project

Page 57: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

57

Building site dec. 2011BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detail project

Page 58: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Building site march 201258

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detail project

Page 59: NEW ACUTE HOSPITAL, STOKMARKNES Development and  solutions

Building site march 201259

BOARCH arkitekter as ProsjektPartner Bodø as Norconsult as

NLSH Vesterålen detail project

…the first users have already moved in…