Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John...
-
Upload
markus-traylor -
Category
Documents
-
view
216 -
download
0
Transcript of Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John...
![Page 1: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/1.jpg)
Network/Technology Infrastructure Plan
As prepared for the TUSD Governing Board Summer 2007
John BratcherNetwork Security Systems Analyst
![Page 2: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/2.jpg)
Main Goal of plan
Develop a technology infrastructure plan to address the district technology needs to support student achievement and effective business support services for the next 5-10 years
• Supplement to the Approved Technology Plan approved by the Governing Board June 2006
• Working Document that will guide decision-making
![Page 3: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/3.jpg)
Executive Summary• Key items about plan
• To support long-term decisions made relating to technology infrastructure
• Supports District Educational Technology Plan
• An understanding and knowledge of what infrastructure exists AND what is needed for the future
![Page 4: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/4.jpg)
Executive Summary• Process for developing document:
• The historical context of how technology developed in TUSD
• The documentation of the current infrastructure status
• Identification of stakeholder needs and priorities using a survey of employees, parents and community members
![Page 5: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/5.jpg)
Executive Summary• Process for developing document:
• A comparison of existing infrastructure to industry standards and recommendations
• The development of recommendations to bridge the gap to improve the infrastructure to support the educational technology plan and business services
• An analysis of the “gap” between our current status, stakeholder needs and priorities and industry standards
![Page 6: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/6.jpg)
Executive Summary• The expected outcomes:
• Establish a district standard of “technology / infrastructure capacity” for all classrooms
• Establish a district standard of “technology / infrastructure capacity” for ALL school sites
• Establish a district standard of “technology / infrastructure capacity” to meet business support needs
![Page 7: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/7.jpg)
Executive Summary• Analyze the differences between our existing
infrastructure and our recommended district standards to develop recommendations for necessary upgrades
• Propose sequence of actions to bring classrooms, schools, and offices up to standard
• Estimate costs and identify sources of funding to achieve these goals
![Page 8: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/8.jpg)
Executive Summary• Potential funding sources:
• Bond*• E-Rate • Building Renewal • Other Capital Funds • Other Funds to be Determined
*guidelines have changed
![Page 9: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/9.jpg)
Purpose• TUSD’s Governing Board approved a Five Year
Educational Technology Plan on June 13, 2006
• Goal 3 of the approved plan:
• Ensure that all K- 12 educational institutions have the capacity, infrastructure, staffing and equipment to meet academic and
business needs for effective and efficient operations.
![Page 10: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/10.jpg)
Purpose• The following goals were established to ensure
successful implementation of the plan: • Document existing infrastructure
• Identify current and future stakeholder needs
• Establish district infrastructure standards to meet our future needs
• Develop an action plan and budget/funding parameters to move from our existing infrastructure to the upgraded district network infrastructure needed to support current and future academic and business needs
![Page 11: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/11.jpg)
Purpose• Members:
• Lorrane McPhereson• John Bratcher• Mary Veres• Bob Holt• Cherie Odeski• Chris Van Dyke• Al Manzo• Mark Miller
![Page 12: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/12.jpg)
Purpose• Why these members:
• Lorrane McPhereson –Facilitator / eRate• John Bratcher – Desktops, Servers, Data Networks• Mary Veres – TS Executive Sponsor• Bob Holt – Disaster Recovery / Back-ups• Cherie Odeski - Purchasing• Chris Van Dyke - Education• Al Manzo – Telecomm Networks• Mark Miller – eRate compliance
![Page 13: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/13.jpg)
Historical Context• Evolution of Technology in TUSD
• Business Computing • Student Information Management
• Local Area Networks• Individual departments/schools
• Wide Area Network• 1999 Bond Project• SFB Project
• Telecommunications• Individual circuits to PBX
![Page 14: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/14.jpg)
TUSD’s Existing Network Infrastructure
• Converged network – voice and data travel over the same physical cables
• 5 sites act as WAN hubs
• WAN uses primarily T-1 (1.54 Mbps) and DS-3 (45 Mbps) circuits to connect schools to hub sites
• LANs primarily operate at 100 Mbps
• Internet uplink operates at 75 Mbps
![Page 15: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/15.jpg)
![Page 16: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/16.jpg)
Data and Internet Services
![Page 17: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/17.jpg)
Data and Internet Services – today*****
Gig1/1Gig2/1
Gig1/
2Gi
g2/2
Gig1/1
Gig
1/1
Gig1/2
Gig1/2
Gig5
/2Gi
g6/2
Gig
7/1
Gig5/1Gig6/1
Gig5/1Gig6/1
Internet7200
Core1
Core2
Morrow1
Morrow2
Distro6513
Qwest Internet
TUSDWAN
TUSD DataCenter@ 1010 E. 10th
DMZ
CacheEngines
Guest Wifi
Anchor LWAPP Tunnel
GuestNAC
Anchor WLC
WLC
WLC
WLC
Gig7/1
Gig5/2
Gig6/2
Gig9/1
Gig9/1
Fa4/0
Fa4/1
Gig7/2
Gig7/2
Gig1/0/49
Gig1/0/49
Gig
9/47
Gig9/
47
![Page 18: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/18.jpg)
Wireless LAN vs Wireless WAN
![Page 19: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/19.jpg)
Bandwidth Contexts
Computer IDF MDF Hub SiteInternet
Morrow Hub
100 Mbps bandwidth
on LAN
1 Gbps bandwidth
on LAN
1.5 Mbps bandwidth on WAN
45 Mbps bandwidth on WAN
145 Mbps ISP Uplink
![Page 20: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/20.jpg)
Bandwidth Contexts – today*****
Computer IDF MDF Hub SiteInternet
Morrow Hub
100 Mbps bandwidth
on LAN
1 Gbps bandwidth
on LAN
1.5 Mbps bandwidth on WAN
45 Mbps bandwidth on WAN
100 Mbps ISP Uplink –
today*****
![Page 21: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/21.jpg)
Voice Services
• Historical Perspective• Each phone/fax had its
own circuit
• Current PBX• WAN Configuration
• Not completed resulting in problems with:
• 911 – provides site address not location of the phone
• Voice Message functions are limited
• Caller ID disabled
• These will be corrected with planned E-Rate funded upgrades
![Page 22: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/22.jpg)
Specialized systems that depend on the network
• Environmental Management Control Systems (EMCS)
• Fire Alarm System• Security Alarm/ Video
Surveillance System• Access Control System• Irrigation Systems
• Distance Learning Systems
• Conference Bridge System
• Remote Access (VPN) for staff and teachers (limited)
• TUSD Television Broadcasting System
![Page 23: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/23.jpg)
Needs Assessment/Priorities
Survey - 3000+ TUSD staff
2000 Parents/community members
• 65% of responders rated themselves as “average tech users
• 62% of responders had DSL/Cable internet access at home
• 25% of responders did NOT have internet access at home
![Page 24: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/24.jpg)
Greatest potential for increasing student achievement
• More computers in the classroom• Access to more computer labs• Up to date websites• Interactive white boards in every classroom• More on-line classes• Digital curriculum• On-line texts• Use of digital cameras/video production• Streaming video/Video-on-demand
![Page 25: Network/Technology Infrastructure Plan As prepared for the TUSD Governing Board Summer 2007 John Bratcher Network Security Systems Analyst.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551a4b59550346a4248b5ebd/html5/thumbnails/25.jpg)
Greatest Obstacles
• Computers operate too slowly• Internet connections are slow• Out of data hardware/software• Lack of training for technology• Lack of technology support• Lack of instruction in technology• Limited access of TUSD network from home