NCR AG I 055 With Vendors Reply

download NCR AG I 055 With Vendors Reply

of 12

Transcript of NCR AG I 055 With Vendors Reply

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    1/12

    s. re er to t e attac ma rom en or

    Pls. refer to the attach mail from Vendor

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    2/12

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    3/12

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    4/12

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    5/12

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    6/12

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    7/12

    R: HB11LA_8&10/ FORGED VALVE/ LVF SPA/ 4500181410-0 (MIR-P-311) ECZ-020 ( 67 NOS )

     Author: LVF SpA - Mangili E. [email protected] (Mar 11, 2016 23:44)

    Printed by: QUINONESORLIEARAGON Associate I (S3-I)/Purchasing&Expediting Part/SESA/SAMSUNG ENGINEERING CO., LTD. (Mar 15, 2016 22:39)

    Dear Mr. Orlie,

    sorry for this delay.

    he inspection and test plan in attached has been approved without request of Hardness test. See HB11LA-150345qcp_Qty_Ctrl.Plan Rev.03.pdf file.

      On the purchase order received has never been formalizes the request of hardness test report and any extra costs were not considered. For these reasons the hardness test reports o

      PWHTed, will be not supplied. However, We confirm You that the requirements indicated on technical documentation WPS/PQR and our internal procedure CQ17 (reviewed by you o

      Been taken in consideration and followed during production stage. The Hardness values are in fully compliance with the contractual requirements scope of supply.

    Please find in attached, certificate revised as required. (LVF Job 150345 POS. 013 – SAMSUNG P.O. No. 4500181410-2).

    3. Line Item no. 71, 72 & 73 - BOM note FL03 requires min hardness for RTJ flange groove to be 155 HB.LVF to make sure for MIN hardness for RTJ flange groove to be 155 HB as per P.O requirement(BOM)

    A confirmation letter is required to confirm compliance to the BOM special note.

    See relevant LVF Statement about Line Item no. 71, 72 & 73 - BOM note FL03 requires min hardness for RTJ flange groove to be 155 HB. (LVF 150345 – SAMSUNGP.O. No.: 4500181410-2). These information have been already addressed to your inspection agency TC2 Technical Consultancy srl.

    Best Regards,

    Da: QUINONESORLIEARAGON [mailto:[email protected]]

    Inviato: giovedì 10 marzo 2016 07:57

    A: Francesca Preziosa; Matteo Pagani; Demis Locatelli; Mihaela Petrovan; Gianluca Negri; Gianluca Cortesi; Enzo Mangili; Chiara Locatelli; Anna Cividini; Andres Basilio Mayta; Marco Bertuletti;

    Cc: JoonKee Kim; Mohammed Imran; EHETHESHAM RAHI; J.NIRMAL nirmal; [email protected]; Ricky Castro; KwonHoe Yang; MYEONGJIN PARK; [email protected]

    Oggetto: HB11LA_8&10/ FORGED VALVE/ LVF SPA/ 4500181410-0 (MIR-P-311) ECZ-020 ( 67 NOS )

    Dear Mr. Marco/LVF,

    This is to inform you again that during site receiving inspection for the 67 nos final batch of this PO.

    Some comment has been raised by PID, please refer to the below points to be clear.

    Your swift response in this matter is highly appreciated.

     ____________________________________________________________________________________________________________________________________________________

    1. Line Item no. 13 - Body/ Bonnet - bolt and nut as per valve data sheet and also as per approved drawing is A193 B8 cl2/ A194 Gr8. But the manufacturer's certificate shows bolts/ nuts a

    Certificate needs to be revised and concurred by TPI.

    2. Line Item no. 71, 72 & 73 - BOM note FL03 requires min hardness for RTJ flange groove to be 155 HB.

    A confirmation letter is required to confirm compliance to the BOM special note.

     ____________________________________________________________________________________________________________________________________________________

    Again we are requesting your kind attention and immediate action on this regard. We have to close this issue otherwise PID will reject the materials if we dont compdocuments.

    Thank you and hoping for your utmosst cooperation.

    Regards,

    Mr. Orlie A. QuinonesProcurement Department

    Samsung Saudi Arabia Co. Ltd.

    Phone | +(966) (13) - 356 5900 x 2606 Email| [email protected]

    Fax | +(966)-(13) - 356 5984 Website| ssa.samsungengineering.com

    Mobile | +(966)-56 357 5913

     AYT B Ca mp- 1 Ki ng Ab dul la Roa d Of f: Exp re ss Hi ghw ay No. 1

    Page 1 of 4Samsung mySingle

    3/15/2016http://www.samsung.net/service/ml/RecvController 

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    8/12

    Mohammed Imran,

    QC Supervisor - Piping,

    Clean Transportation Fuels Project atRiyadh Refinery,Samsung EPC Company Limited.Mobile: +966 55 164 2132

    Descrizione:Immagine

    imossadalittente.

    -------Original Message-------- Sent: LVF SpA - Mangili E.  Date: Fri, 11 Mar 2016 14:57:30 +0100 Subject: R: Samsung orders, your ref. 150345 & 151329 - problemi conispezioni gennaio 2016, ispettore: Sig. Degetto

    Good morning Tiziana,

    please find in attached certificate revised as required. (LVF Job 150345 POS. 013 â SAMSUNG P.O. No. 4500181410-2).

     Also see relevant LVF Statement about Line Item no. 71, 72 & 73 - BOM note FL03 requires min hardness for RTJ flange groove to be 155 HB. (LVF 15034500181410-2)

    Best Regards,

    Page 2 of 4Samsung mySingle

    3/15/2016http://www.samsung.net/service/ml/RecvController 

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    9/12

    [150345] RCTF PJT / HB11LA_FORGED VALVE / LVF / PO 4500181410 / NCR-AG-I-055 FOR APCS-26PAINTING

     Author: LVF SpA - Bertuletti M. [email protected] (Mar 07, 2016 22:46)

    Printed by:QUINONESORLIEARAGON Associate I (S3-I)/Purchasing&Expediting Part/SESA/SAMSUNG ENGINEERING CO., LTD. (Mar 15, 2016

    22:34)

    Dear Mr. Orlie,

    Please note that LVF is on line with what proposed during BID stage and what proposed in the approved painting cycle

    Here below, for your kind reference, the correspondence between LVF painting cycle and ARAMCO APCS (Agreed during BID

    Stage):

    LVF P-13/3/B APCS-26

    Please look at the approved procedure here enclosed (page 8 of 14)

    LVF P-13/3/B is composed by two layers of 125microns each. Total DFT is 250.

    Please also note that detailed datasheet allow to use from 100 to 150 for each layer (as written also in the mail below by Mr.

    Jung).

    Basing on this LVF is fully in compliance with what proposed and approved in detailed Painting procedure and consequently

    there is no need of corrective actions from our side.

    Da: QUINONESORLIEARAGON [mailto:[email protected]]

    Inviato: lunedì 7 marzo 2016 11:19

    A: Marco Bertuletti

    Cc: hyunyu jung; Owais Ahmad Bhat; sunguk nam; Sanghyun Baik; Jungmin Lee; MANIALAGAN SANGILI; Roque Soriano Rubiano;

     jaewon jeong; JoonKee Kim; EHETHESHAM RAHI; YONG RHEE; Seung Hoon Oh; PILKEUN Lee; [email protected]; JERICPOLITUD

    CAPILI; dongmin lee; [email protected]; [email protected]; Enzo Mangili; Demis Locatelli; Francesca Preziosa; Paolo Leoni

    Oggetto: RCTF PJT / HB11LA_FORGED VALVE / LVF / PO 4500181410 / NCR-AG-I-055 FOR APCS-26 PAINTING

    Dear Mr. Marco,

    Again we have received NCR from our site for the valves painted with APCS-26.

    During material inspection site QC has found DFT thickness non-conformance. Pls. refer to the attached NCR forfurther details. In this regard we are requesting RC & Corrective action for the same.

    Thank you and hoping for your immediate action.

    Regards,

    Mr. Orlie A. Quinones

    Procurement Department

    Samsung Saudi Arabia Co. Ltd.

    Phone | +(966) (13) - 356 5900 x 2606 Email| [email protected]

    Fax | +(966)-(13) - 356 5984 Website| ssa.samsungengineering.com

    Mobile | +(966)-56 357 5913

     AY TB Ca mp -1 Ki ng Ab du ll a Ro ad Of f: Ex pr es s Hi gh wa y No .1

    Page 1 of 4Samsung mySingle

    3/15/2016http://www.samsung.net/service/ml/RecvController 

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    10/12

    ------- Original Message -------

    Sender  : hyunyu jung Engineer/AE/RCTF/Logistics & Inspection Team/SAMSUNG ENGINEERING CO., LTD.

    Date : Mar 05, 2016 22:00 (GMT+09:00)

    Title : [Mr Nam, Owais, Orlie] Fwd: NCR-AG-I-055 (Internal)

    To : Owais Ahmad Bhat sunguk namQUINONESORLIEARAGON Sanghyun Baik

    Cc : Jungmin Lee MANIALAGAN SANGILI Roque SorianoRubiano jaewon jeong JoonKee Kim EHETHESHAMRAHI YONG RHEE Seung Hoon Oh PILKEUNLee [email protected] JERICPOLITUD CAPILI dongminlee [email protected] [email protected]

    Dear Mr. Nam / SEPC Engineering Team

    Regarding Low DFT of Forged Valve, We found the low DFT Value of Forged Valves manufactured by LVF.

    Please request Mr SH Back & Carboline KOR to advise the NCR(Low DFT Value) in order to close this.

    Painting Procedure

    Rev.04 / Code APainting Report Painting Datasheet

     ARAMCO Spec

    (APCS-26) Actual DFT (Site)

     1st Carboguard 890

    2nd Carboguard 890

    1st DFT 125

    2st DFT 125

    Total 250 (Min)

    DFT 268.2771st DFT 100~150

    2st DFT 100~150DFT 300~400 ???

    # Note :

    1. Carboguard 890 is approved by ARAMCO / SAES-H-101V

    Page 2 of 4Samsung mySingle

    3/15/2016http://www.samsung.net/service/ml/RecvController 

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    11/12

    2. Painting Maker / Painting Datasheet

    Dear Mr. Owais Ahmad Bhat

    Please send the photos of Low DFT.

    Dear Mr Orlie

    Please Reqeust Vendor to provide the Root Cause & Corrective Action to SEPC.

    Best Regards

    .

    Jung, Hyunyu/ Engineer, Logistics & Inspection Department

    Samsung Engineering Co., Ltd.

    Page 3 of 4Samsung mySingle

    3/15/2016http://www.samsung.net/service/ml/RecvController 

  • 8/18/2019 NCR AG I 055 With Vendors Reply

    12/12

    E-mail : [email protected]

    Tel : +966 13 356 5900 (Ext. 2627)

    Mobile : +966 59 231 6940

    ------- Original Message -------

    Sender  : Owais Ahmad Bhat F1-Officer/RCTF/Project/Site/SESA/SAMSUNG ENGINEERING CO., LTD.

    Date : 2016-03-05 20:35 (GMT+09:00)

    Title : NCR-AG-I-055 (Internal)

    To : QUINONESORLIEARAGON Jungmin Lee MANIALAGANSANGILI hyunyu jung Roque Soriano Rubiano jaewon jeong JoonKee Kim EHETHESHAM RAHI

    Cc : YONG RHEE Seung Hoon Oh PILKEUN [email protected] JERICPOLITUD CAPILI dongmin lee [email protected] [email protected]

    Dear Sir's,

    Good Afternoon.

    Please see the attached Internal Non-Conformance Report (NCR-AG-I-055) for your Action.

    Kindly Submit the Root Cause and Corrective Action within 7 Days.

    Thanks & Regards,

    Owais Ahmad Bhat

    QC Document Controller

    Riyadh Clean Transport Fuel Project (RCTF)

    Email: [email protected] [email protected] 

     LVF-PAINTING SYSTEM_04_reply_PJT signed CODE

     A.PDF (948KB)

     Carboguard 890..pdf (94KB)