National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
1
NASA TECHNICAL STANDARDSWORKING GROUP
STATUS OF STANDARDS
PROGRAM AND ACTIVITIES
Larry L. Schultz
Spaceport Engineering & TechnologyOctober 16, 2003
![Page 2: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/2.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
2
NASA Technical Standards Working Group
Status of ActionsStatus of Actions
Reviewed 27 proposed standards projects from the MSFC program office for the Center
NASA STD-6004 “Stress Corrosion Cracking” review Provided approval letter in June 2003
NASA STD-7002A “Payload Test Requirements” review Provided Draft 1 approval letter in March 2003, Draft 2 in June 2003
Effectiveness Assessment Action No. 79 Response provided in August and September 2003
NASA-STD-5012 “Strength & Life Assessment of Engines” Provided approval letter in September 2003
NASA-HDBK-5010, "Fracture Control Implementation Handbook For Payloads, Experiments, and Similar Hardware"
Provided approval letter in September 2003
![Page 3: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/3.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
3
NASA Technical Standards Working Group
NASA Standards in DevelopmentNASA Standards in Development
Coating Standard – Project Leader – Lou MacDowell Qualified Suppliers list needs updating
GSE Design Standard – Project Leader – Larry Schultz OSP requested an updated standard Draft revision given to OSP for review prior to official update
GSE Welding Standard – Project Leader - Scott Murray Standard will be up for revalidation in 2004 Draft revision sent to the program office
Vibro-acoustic handbook – Project Leader Ravi Margasahayam Comments incorporated by contractor personnel Updated draft sent to MSFC in June 6, 2003 Updated draft under review by the Agency
AP2 Handbook – Project Leader Chris Brown, AP2 Program Office Project Leader to incorporate portions of the handbook into a new AP2 NPG Completion will be delayed until after the NPG is complete
![Page 4: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/4.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
4
NASA Technical Standards Working Group
VCS Standards in DevelopmentVCS Standards in Development
ISO standards published ISO 14625, GSE ISO 14951, Parts 1 thru 13 - Fluid characteristics ISO 15389, Flight to ground umbilical ISO 14302, Space systems -- EMC ISO 17399, Space systems -- Man Systems Integration
ISO standards in Draft International stage ISO 14952, Parts 1 thru 6 – Surface Cleanliness of fluid systems ISO 15859, Space systems -- Fluid Characteristics, sampling and test
methods, 13 Parts ISO 16458, Unmanned Spacecraft Transportation
ISO standards in working or committee draft stage ISO 14624-5, -6, -7, Space systems – Material Flammability ISO 22538-1 thru –4, Space systems - Oxygen safety Amendment to ISO 15389 Flight to ground umbilicals
![Page 5: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/5.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
5
NASA Technical Standards Working Group
VCS Standards in DevelopmentVCS Standards in Development
ISO CD 14620-3, Safety Requirements - Flight Safety Systems ISO WD 23041, Unmanned SC Operational Procedures ISO CD 16455-1 & -2, Stress Corrosion Cracking ISO 15860, Gas Contamination, Field Measuring Methods ISO 22108, Non Flight Items - Identification & Control AWS D17.1, Aerospace welding ANSI/NCSL Z540.1, General Requirements for Competence of
Calibration Laboratories NFPA 2001 - Standard on Clean Agent Fire Extinguishing Systems AP-42, Compilation of Air Pollutant Emission Factors, Fifth Edition,
Volume I: Stationary Point and Area Sources United Nations Environment Program Halon Technical Options
Committee (UNEP HTOC) Under directions from the Parties to the Montreal Protocol (MP), the HTOC developed and released the Halons Technical Options Committee - 2002 Assessment Report.
![Page 6: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/6.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
6
NASA Technical Standards Working Group
VCS Standards in DevelopmentVCS Standards in Development
ANSI/ASAE EP411.4, Guidelines for Measuring and Reporting Environmental Parameters for Plant Experiments in Growth Chambers
ASTM D 2512-95, Compatibility of Materials With Liquid Oxygen (Impact Sensitivity Threshold and Pass)
AIAA XXXX, Architecture of Small, Self-Propelled, Autonomous Robots ISO New Work Items
Update of ISO 14625 – GSE Orbital Debris Aerospace Welding
![Page 7: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/7.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
7
NASA Technical Standards Working Group
SDO and VCS Development ParticipationSDO and VCS Development Participation Personnel participation
13 KSC personnel participating in SDOs Standard Development Organizations – 12
ISO ASTM SAE ASME AIAA NCSL NACE AWS NFPA ASM ASAE ASH
![Page 8: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/8.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
8
NASA Technical Standards Working Group
Program Awareness/Issues/InitiativesProgram Awareness/Issues/Initiatives
Hosted a NASA Technical Standards Program Awareness session at KSC – Attendance 50 personnel
![Page 9: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/9.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
9
NASA Technical Standards Working Group
Center Review ProcessesCenter Review Processes
Standard Proposal Review Each proposed standard is reviewed by the Center Technical
Standards POC for Center expertise. If expertise is at the Center, the proposal is assigned to a Center
subject matter expert for review and comment using the Technical Standards webpage forwarding capability.
Draft Standard Review Each draft standard is reviewed by the Center standards POC for
Center expertise. If expertise is at the Center, the draft standard is assigned to a
Center organization or expert for review and comment using the KAITS system.
A Center concurrence or approval letter with or without comments is prepared and signed by the KSC SMO.
![Page 10: NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES](https://reader035.fdocuments.in/reader035/viewer/2022072014/56812f9c550346895d951a51/html5/thumbnails/10.jpg)
National Aeronautics andSpace Administration
John F. Kennedy Space Center
SPACEPORTENGINEERING ANDTECHNOLOGY
10
NASA Technical Standards Working Group
Program ResourcesProgram Resources
Technical Standards Program participation – 297-10-89-00-00-XX FY 03 – 1889.5 LH, 0.90 FTE FY 03 – 24 KSC C.S. personnel participating in the program FY 03 -- CS labor cost - $ 81,012.64.00 FY 04 – POP input 1 FTE for UPN 297-10
Program funding FY 03 Travel Budget $55K FY 03 NOA $60K FY 03 Obligations $ 96.3K FY 03 4th Quarter Cum Cost $ 68,252 FY 04 Travel Budget $55K FY 04 NOA $60K