Bella Desgagnés is a Canadian passenger vessel completed in march 2013 by Palumbo shipyard in Naples. Palumbo Group was proud of hosting this vessel and donating her the best security, technical and comfort standards. The vessel was built at 60% by a Croatian Shipyard that went bankruptcy, so in a record time, Palumbo Shipyard succeeded in completing every system on board, under the supervision of Lloyd Register and Transport Canada surveyors. The vessel now represents a technical excellence as far as the international standards are concerned for a passenger ship. Bella Desgagnés is an Ice and DP class vessel in compliance with Lloyd Classification standards and Canada flag. The vessel is 97,10mt in length (LOA) with a GRT of 6.588 tons and it is powered with 4 diesel electric generators Wartsila which power two KONCAR electric motors, giving propulsion to two azimuthal propellers.
M/V BELLA DESGAGNES NEWBUILDING COMPLETED IN NAPLES SHIPYARD
Palumbo Superyachts building
Having built a strong reputation on the commercial market, the Group started looking for new areas of expansion and moved into the highly competitive Superyacht field. Company’s diversification from the core business of repairs and refits began in 2008 with a new division handling construction of luxury and almost unlimited sized Superyachts under the brand of Columbus Yachts.
wwww.columbusyachts.it - ww.facebook.com/ColumbusYachts
The ship was partially sunk after a collision; we recuperated it and the vessel was tugged to our Naples yard.
Palumbo Shipyard performed all the repair works, along a two years activity, spending over 350,000 man hours.
The main jobs performed were the following:
- Structural renewal of all the damaged structures of the bottom and bow, areas for a total of about 2,000 steel tons (jobs mainly performed in Messina dry-dock, and including the renewal of the steering gear equipment, the shaft lines main shaft bearings, fin stabilizers, main engine, generators, hoistable car decks and propeller blades)
- Complete overhauling and new installation of all machinery and electrical components in the engine room, which was totally flooded.
M/V MONTESTELLO
From: JO Bergljung [mailto:[email protected]]
Sent: Wednesday, August 03, 2011 3:44 PM To: 'Joseph Calleja'
Subject: M/V Clipper Odyssey
Dear Joseph I have not forgotten you even so you have not heard from me for some time. This is to thank you for a good repair at your Yard earlier this Year. The Vessel has been operating quite well since, and is now in the Island area but will be back in the Med. in the beginning of September. Please give my regards to all the involved in this project and I am looking forward to come back to your Yard and work with them all with this or another Vessel when there will be another possibility. Jan-Otto Bergljung VP Technical Operations International Shipping Partners, Inc 4770 Biscayne Blvd. Penthouse A Miami, Florida 33137, USA Phone: 305-573-6355, ext. 222 Fax: 305-573-5177 Cell: 786-281-6300 E-mail: [email protected]
M/V ‘CLIPPER ODYSSEY’ – INTERNATIONAL SHIPPING
M \ N E U R O S T A R B A R C E L O N A )
T h e c o n v e r s i o n j o b h a s t o t a l l y b e e n p e r f o r m e d i n N a p l e s p r e m i s e s , a l o n g 5 m o n t h s ; t h e e x i s t i n g R o -
R o v e s s e l p a s s e n g e r c a p a c i t y h a s b e e n i m p r o v e d w i t h t h e i n s t a l l a t i o n o f n e w 1 5 0 c a b i n s , w i t h
p r i v a t e b a t h r o o m s , a l l i n s t a l l e d i n t o n e w s t e e l s u p e r s t r u c t u r e s m a d e b y u s , w i t h a l l t h e a n c i l l a r y
r e l a t e d s y s t e m s . .
T h e O w n e r s a r e t h e G r i m a l d i G r o u p o f N a p l e s .
T h e j o b a m o u n t w a s o v e r 7 , 5 m i l l i o n E u r o s
(REFIT) It was a refitting work that involved 3.000 square meters of public areas such as restaurants, including self service area, kids area and about 400 cabins.
SLOP FACILITY
All slops disposal, deballasting, tank washing, purging,
and cargo tank upgrading may be performed.
The tank cleaning station is capable of providing tank
cleaning machines, hoses, ventilation fans, compressed
air, steam, hot water, chemicals, and portable
submersible pumps that are either air powered at
larger through hydraulically actuated units that are
powered engine/hydraulic pump sets outside the
hazard zone. Vessels are however at liberty to use their
own on board facilities if required.
Other notes:
Rate of reception 400 m3 / Hour.
Shore hose connection is normally 8" or 10".
Appropriate adapters are available when necessary.
Installation is fixed. However in cases of small parcels
of oily bilge water/slops, road tankers can be used.
There are a total of 9 shore tanks with a total capacity
of 19,000 m3.
Reference List Silicon Paint Treatment
M/V CRUISE OLIMPIA M/V CRUISE EUROPA M/V CRUISE ROMA M/V CRUISE BARCELONA M/V FLORENCIA M/V CATANIA M/V SORRENTO M/V IKARUS PALACE M/V CARTOUR GAMMA M/V EUROCARGO GENOVA M/V EUROPA PALACE M/V GRANDE ELLADE M/V EUROCARGO ISTANBUL M/V EUROFERRY MALTA M/V EUROCARGO VENEZIA M/V EUROCARGO MALTA
Palumbo Shipyards
[SILICON PAINT TREATMENT] Reference list for Silicon Paint treatment get on Messina and Malta Palumbo Shipyards