N241387680 Martin Roberts-CV sep 2016 (2)

3
Martin Roberts 1 Wellerloop, Leschenault, WA 6233, Australia Telephone: 0477 334 961; Email: [email protected] Professional Profile A highly-skilled and focused professional, with over 30 years experience in management, team leadership and risk mitigation in the power transmission industry. Possesses a proven track record in delivering complex projects on time, within budget and to exacting specifications. Adopts a logical and analytical approach to problem solving, with an instinct for identifying areas of potential improvement. Applies excellent communication skills to build positive relationships at all levels. Enjoys working within a productive team environment, across both on-site and off-site operations, with the ability to utilize initiative and leadership skills to ensure optimal HSE performance. Career Summary 2016 current, construction supervisor, Poles and underground, demolition of 132kv power transmission line in three springs WA. 2008 - 05/2015 SECTION SUPERVISOR, United Group Ltd, Australia Played a key role as Section Supervisor, overseeing a portfolio of power transmission development projects, including the build of steel structures and power lines Compiled work method statements, safety paperwork, material safety data sheets (MSDS) , work permits and associated site documentation in collaboration with specialist engineering teams Ensured robust project and resource planning, including the coordination of site set-up and requisition of plant / equipment, such as cranes, trucks, elevating working platforms (EWP's) and hand tools Supervised and motivated large-scale site teams, comprising of up to 50 staff members; provided guidance as required and ensured full compliance with all legal, regulatory and Health and Safety requirements Developed strong client relationships via weekly client meetings and regular progress updates Directly supported the management team, across areas such as budget planning and incident investigation Key Project / Achievements Accountable as Section Supervisor Level 3 on the two-year Tully / Ingham Project, involving the demolition of the existing line and assembly / erection of 220 new steel towers (2012-2014) Acted as Section Supervisor for the Roy Hill Transmission Line Project in WA- 240 guyed masts and lattice towers (2014) to [2015] Undertook the role of Section Supervisor on the NZ powerline Project; erecting 429 steel towers 400kv, with two erected with JIN pole (2010-2012) Supervised erection crews and completed 80 steel pole erections for the Mackay, Queensland contract (2009) Promoted an environment of continual improvement and optimal levels of Health and Safety across all projects, with success in winning two safety awards for the company 2007 - 2009 CONSTRUCTION SUPERINTENDENT , Accountable as Construction Superintendent on the tower erection for the Innisfail to Edmonton Transmission Line as well as the tower erection of the 275kv power Line Collie, WA 2005 - 2007 ERECTION SUPERVISOR, rapid rail international, UK Supervised and coordinated the installation of rapid rail system to steel lattice towers for various UK clients Spearheaded the quality control procedures across Balfour Beatty, Eves, National Grid and Amec, including the active monitoring of compliance. 1999 - 2005 RIGGER LEADING HAND, Rig-out Erection Responsible as Leading Hand on the assembly and erection of telecommunication masts and towers ranging up to 350 meters in height as well as the installation of feeders 1998 - 1999 STRINGING SUPERVISOR, ABB, North Africa, supervising the run out of conductor for 275kv power line.

Transcript of N241387680 Martin Roberts-CV sep 2016 (2)

Page 1: N241387680 Martin Roberts-CV sep 2016 (2)

Martin Roberts

1 Wellerloop, Leschenault, WA 6233, Australia

Telephone: 0477 334 961; Email: [email protected]

Professional Profile

A highly-skilled and focused professional, with over 30 years experience in management, team leadership and risk mitigation in the power transmission industry. Possesses a proven track record in delivering complex projects on time, within budget and to exacting specifications. Adopts a logical and analytical approach to problem solving, with an instinct for identifying areas of potential improvement. Applies excellent communication skills to build positive

relationships at all levels. Enjoys working within a productive team environment, across both on-site and off-site operations, with the ability to utilize initiative and leadership skills to ensure optimal HSE performance.

Career Summary

2016 – current, construction supervisor, Poles and underground, demolition of 132kv power transmission line in

three springs WA.

2008 - 05/2015 SECTION SUPERVISOR, United Group Ltd, Australia

• Played a key role as Section Supervisor, overseeing a portfolio of power transmission development projects,

including the build of steel structures and power lines

• Compiled work method statements, safety paperwork, material safety data sheets (MSDS), work permits and

associated site documentation in collaboration with specialist engineering teams

• Ensured robust project and resource planning, including the coordination of site set-up and requisition of plant /

equipment, such as cranes, trucks, elevating working platforms (EWP's) and hand tools

• Supervised and motivated large-scale site teams, comprising of up to 50 staff members; provided guidance as

required and ensured full compliance with all legal, regulatory and Health and Safety requirements

• Developed strong client relationships via weekly client meetings and regular progress updates

• Directly supported the management team, across areas such as budget planning and incident investigation Key

Project / Achievements

Accountable as Section Supervisor Level 3 on the two-year Tully / Ingham Project, involving the demolition of

the existing line and assembly / erection of 220 new steel towers (2012-2014)

Acted as Section Supervisor for the Roy Hill Transmission Line Project in WA- 240 guyed masts and lattice

towers (2014) to [2015]

Undertook the role of Section Supervisor on the NZ powerline Project; erecting 429 steel towers 400kv, with

two erected with JIN pole (2010-2012)

Supervised erection crews and completed 80 steel pole erections for the Mackay, Queensland contract (2009)

Promoted an environment of continual improvement and optimal levels of Health and Safety across all projects,

with success in winning two safety awards for the company

2007 - 2009 CONSTRUCTION SUPERINTENDENT ,

Accountable as Construction Superintendent on the tower erection for the Innisfail to Edmonton Transmission

Line as well as the tower erection of the 275kv power Line Collie, WA

2005 - 2007 ERECTION SUPERVISOR, rapid rail international, UK

• Supervised and coordinated the installation of rapid rail system to steel lattice towers for various UK clients

• Spearheaded the quality control procedures across Balfour Beatty, Eves, National Grid and Amec, including the

active monitoring of compliance.

1999 - 2005 RIGGER LEADING HAND, Rig-out Erection

Responsible as Leading Hand on the assembly and erection of telecommunication masts and towers ranging up to

350 meters in height as well as the installation of feeders

1998 - 1999 STRINGING SUPERVISOR, ABB, North Africa, supervising the run out of conductor for 275kv

power line.

Page 2: N241387680 Martin Roberts-CV sep 2016 (2)

1988 ASSEMBLY & ERECTION RIGGER, Bamberg GmbH, Germany.assembly and erection of towers with the

use of a derrick [ jin pole]

1985 - 1988 STRINGING RIGGER, Balfour Beatty, UK, all aspects of stringing power lines 132,000kv to 400,000

kv

Further Details

I.T. Skills: Microsoft Excel, Internet and Email

Other: National Criminal History Check - Issued 12/08/2015; Driver; full clean licence.

tickets attained ADVANCED RIGGER. DEMOLITION

SUPERVISOR. cert IV OHS. cert IV CIVIL

CONSTRUCTION SUPERVISOR.

CORE 01 PROVIDE ADVISE ON WHS. CORE 03

MANAGE WORK PLACE INCIDENTS.

CERT III INDUSTRIAL TRAINER.

CERT III INDUSTRY TRAINING AND ASSESMENT.

OPERATE AND MAINTAIN 4X4 VEIHICLE RIIVEH305D

Western power NAC INDUCTED

Page 3: N241387680 Martin Roberts-CV sep 2016 (2)

References are available on request