MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

33
MV STRATEGIC PLANNING MV STRATEGIC PLANNING PLAN FOR PHASE III PLAN FOR PHASE III Final Draft Final Draft Date: 10-26-04 Date: 10-26-04

Transcript of MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Page 1: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

MV STRATEGIC PLANNINGMV STRATEGIC PLANNINGPLAN FOR PHASE IIIPLAN FOR PHASE III

Final DraftFinal Draft

Date: 10-26-04Date: 10-26-04

Page 2: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

CONSTRUCTION PRINCIPLE: CONSTRUCTION PRINCIPLE: SIMPLE TO MAINTAIN/CLEANSIMPLE TO MAINTAIN/CLEAN

Simple light controlsSimple light controls Painted walls --- Simple color schemePainted walls --- Simple color scheme• Navajo White (easy to match)Navajo White (easy to match)• Teale Green TrimTeale Green Trim• Semi-gloss for easy clean-upSemi-gloss for easy clean-up

Linoleum flooring (where possible to get Linoleum flooring (where possible to get good acoustic quality).good acoustic quality).

Sound barriers between rooms.Sound barriers between rooms.

Page 3: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

CONSTRUCTION PRINCIPLE: CONSTRUCTION PRINCIPLE: SIMPLE TO MAINTAIN/CLEANSIMPLE TO MAINTAIN/CLEAN

Easy cleaning (self-cleaning?) Easy cleaning (self-cleaning?) restrooms with floor drains.restrooms with floor drains.

Page 4: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

CONSTRUCTION PRINCIPLE: CONSTRUCTION PRINCIPLE: Energy EfficientEnergy Efficient

Passive Solar CoolingPassive Solar Cooling• Casement or other operable windowsCasement or other operable windows• Wing walls on windward side of buildingWing walls on windward side of building• Thermal chimneyThermal chimney

Day-lighting where possible. Clerestory Day-lighting where possible. Clerestory windows on north-facing rooms.windows on north-facing rooms.

See US Department of Energy WebsiteSee US Department of Energy Website Solar Panels?Solar Panels?

Page 5: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

CONSTRUCTION PRINCIPLE: CONSTRUCTION PRINCIPLE: Energy EfficientEnergy Efficient

Individual Room Heating/Cooling/Fan?Individual Room Heating/Cooling/Fan?• ““Hotel Model” allows upper story rooms toHotel Model” allows upper story rooms to

air condition more without freezing out the first floor.air condition more without freezing out the first floor.

* Fan to circulate outside air on temperate days.* Fan to circulate outside air on temperate days.

* Are individual units less expensive to * Are individual units less expensive to replace/repair?replace/repair?

Solar “tubes” for lighting of top floor rooms. Solar “tubes” for lighting of top floor rooms. See See www.sunpipe.com/index.htmlwww.sunpipe.com/index.html

Page 6: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Construction Principle: Build in Construction Principle: Build in SecuritySecurity

Security devices should be part of the Security devices should be part of the planning.planning.

Plastic Card keys can enhance security.Plastic Card keys can enhance security. Possibly ID cards with Security Strip for Possibly ID cards with Security Strip for

Faculty, Staff, and Students.Faculty, Staff, and Students. Communication with Campus Communication with Campus

Safety/Security from each room.Safety/Security from each room.

Page 7: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Construction Principle: Construction Principle: Technology ReadyTechnology Ready

Building should be wired at $10 per Building should be wired at $10 per square foot with the most “up-to-date” square foot with the most “up-to-date” wiring available at the time of wiring available at the time of construction. “Wired to the current construction. “Wired to the current standards”.standards”.

Page 8: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

All Classrooms should have:All Classrooms should have:

Adequate Sized White Boards!Adequate Sized White Boards! Projector Screens on the corner of the room so Projector Screens on the corner of the room so

they don’t block the white boards.they don’t block the white boards. Light sectioned to allow the lights over the Light sectioned to allow the lights over the

screen to be turned off separate from the room screen to be turned off separate from the room lights. lights.

Instructional Console/ Recessed Instructional Instructional Console/ Recessed Instructional Equipment Security Area for equipment.Equipment Security Area for equipment.

Emergency button: campus safety securityEmergency button: campus safety security Cabling installed for phone/internet.Cabling installed for phone/internet.

Page 9: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

All Classrooms should have:All Classrooms should have:

Quiet Closing Doors to prevent Quiet Closing Doors to prevent slamming noises.slamming noises.

Page 10: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Lecture- 7300 sq. ftLecture- 7300 sq. ft

Large Lecture Hall (1800 sq. ft)Large Lecture Hall (1800 sq. ft) 5 Lecture Room(s) (675 sq. ft) 45 5 Lecture Room(s) (675 sq. ft) 45

student ( LARGE WHITE BOARD!!!)student ( LARGE WHITE BOARD!!!) PA program lecture room 60 capacity, PA program lecture room 60 capacity,

with 2 neighboring 30 students rooms with 2 neighboring 30 students rooms that can be partitioned in half: 1800ftthat can be partitioned in half: 1800ft2 2

1 Lecture Room for 21 students for 1 Lecture Room for 21 students for Honors Courses. Honors Courses.

Page 11: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Lecture Rooms are needed for Lecture Rooms are needed for growth of our academic offerings!growth of our academic offerings!

Rooms specially designed to meet the Rooms specially designed to meet the needs of the PA program will be more needs of the PA program will be more suitable and allow the rooms currently in suitable and allow the rooms currently in use to return to their original function.use to return to their original function.

Large Lecture hall can accommodate Large Lecture hall can accommodate multiple lab sections for science multiple lab sections for science courses as well as general education courses as well as general education courses.courses.

Page 12: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Room complex: suitable for the PA Room complex: suitable for the PA program (needs sink and locking program (needs sink and locking cabinets)cabinets)

partitionpartition

Page 13: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Large Lecture Hall (1800 SQ.FT)Large Lecture Hall (1800 SQ.FT) 120 student capacity plus 2 seats that 120 student capacity plus 2 seats that

accommodate students with disabilities.accommodate students with disabilities. Raised Lectern along the long dimension Raised Lectern along the long dimension

of the room. Center aisles.of the room. Center aisles. *Students at long “bench style” table as in *Students at long “bench style” table as in

Physics 2000 at UCR? Larger desk?Physics 2000 at UCR? Larger desk? Technology as in the “Smart Room”.Technology as in the “Smart Room”. Storage cabinets for demonstration Storage cabinets for demonstration

materials, posters, permanent white materials, posters, permanent white boards that slide up, etc.boards that slide up, etc.

Page 14: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Large Lecture Hall - ProposalLarge Lecture Hall - Proposal

Instructor areaInstructor area

ProjectionProjectionscreenscreen

10 students10 students

DSPSDSPS

Hall or exterior of buildingHall or exterior of building

Page 15: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Large Lecture HallLarge Lecture Hall

Fixed benches or foldable tables, with Fixed benches or foldable tables, with movable chairs (swiveling?) to accommodate movable chairs (swiveling?) to accommodate different size students. Simple chairs are less different size students. Simple chairs are less expensive.expensive.

Built in wall/flat screens. Cost? Built in wall/flat screens. Cost? Maintenance?Maintenance?

Technology consultant. What does the future Technology consultant. What does the future look like?look like?

Least Expensive Option: Flat room, with Least Expensive Option: Flat room, with elevated stage for professor. Swivel chairs elevated stage for professor. Swivel chairs would allow for small group collaboration would allow for small group collaboration among students if some rows face the back.among students if some rows face the back.

Page 16: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Large Lecture goalsLarge Lecture goals

Good Visibility for student-professor eye Good Visibility for student-professor eye contact and audio-visual.contact and audio-visual.

Good acoustics.Good acoustics. Science: sink, electricity, bench for Science: sink, electricity, bench for

demonstrations.demonstrations. Storage.Storage.

Page 17: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Office 4000 sq ft. = approx. 40Office 4000 sq ft. = approx. 40

Administrative? President, Business Administrative? President, Business Manager, IMCManager, IMC

Staff? Larger room for IDS offices.Staff? Larger room for IDS offices. Faculty? Typical office is 90 ftFaculty? Typical office is 90 ft2. 2. Can be Can be

up to 100 ftup to 100 ft Should have windows (if possible).Should have windows (if possible).

Page 18: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

What office needs should be What office needs should be accommodated in Phase III: accommodated in Phase III:

Faculty officesFaculty offices• Clustered if possible, but optimize number Clustered if possible, but optimize number

of offices (90-100 sq. ft.).of offices (90-100 sq. ft.). Administrative officesAdministrative offices• PresidentPresident• Administrative assistantAdministrative assistant• Meeting room (see Other)Meeting room (see Other)• Secured storage for HR materials and Secured storage for HR materials and

other confidential materials. (see Other)other confidential materials. (see Other)• Business/Operations ManagerBusiness/Operations Manager

Page 19: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Office needs should include:Office needs should include:

IMC Tech Office 187 sq.ft.IMC Tech Office 187 sq.ft. 2 Tech Support Office(s) 143 sq. ft. 2 Tech Support Office(s) 143 sq. ft. IDS Offices (shared open space with IDS Offices (shared open space with

movable cubicles/dividers)movable cubicles/dividers)

Page 20: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Sample Office Cluster Sample Office Cluster

Area for Area for copy copy machine, machine, desks for desks for students.students.

Page 21: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Library Function Space (3640 ftLibrary Function Space (3640 ft22))

HHPS Secured Archives – square footage? HHPS Secured Archives – square footage? 250 ft250 ft22 no window needed. Table for no window needed. Table for document review.document review.

Jaegar Study Area/Archive (800 ftJaegar Study Area/Archive (800 ft22)) with Student Study Rooms for group studywith Student Study Rooms for group study Cultural Resource Room (700 ftCultural Resource Room (700 ft22)) Science/Health Resource Room (680 ftScience/Health Resource Room (680 ft22)) Server (400 ftServer (400 ft22)) see IMC PHASE III proposal see IMC PHASE III proposal Faculty Resource Center (390 sq. ft) Faculty Resource Center (390 sq. ft) see IMC see IMC

PHASE III proposal Convergence CenterPHASE III proposal Convergence Center

Page 22: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Server for IMC 390 sq. ft.Server for IMC 390 sq. ft.

Should be adjacent to KRCC Broadcast Should be adjacent to KRCC Broadcast Center.Center.

Page 23: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Cultural Resource Room and Cultural Resource Room and Science/Health Resource RoomScience/Health Resource Room

Should have “false floor” to be ready for Should have “false floor” to be ready for many computers for student use.many computers for student use.

Need locking display cabinets along all Need locking display cabinets along all walls.walls.

White boards and LCD projector for White boards and LCD projector for information literacy training.information literacy training.

Page 24: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Jaegar area about 800 ftJaegar area about 800 ft22 must be must be 22ndnd or 3 or 3rdrd floor. floor.

Jaegar Reading Area/Archive/Overlook-Jaegar Reading Area/Archive/Overlook-

Square footage? About 800 ftSquare footage? About 800 ft22..

Student Study Rooms for group studies Student Study Rooms for group studies with white boards and outlets for with white boards and outlets for computers.computers.

Open viewing into the study rooms from Open viewing into the study rooms from the hallway to allow for supervision.the hallway to allow for supervision.

Page 25: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Jaegar Study AreaJaegar Study AreaWindowWindowFor viewingFor viewingArea withArea withDisplay casesDisplay casesAlong the wallAlong the wallStudy roomStudy room

Adjunct Office?Adjunct Office? Adjunct Office ?Adjunct Office ?

Page 26: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

AVTV- 800 sq.ftAVTV- 800 sq.ft

KRCC Broadcast Center 280 sq.ftKRCC Broadcast Center 280 sq.ft Instructional Media Center (AV Resource Instructional Media Center (AV Resource

Room) (820 ftRoom) (820 ft22)) see IMC PHASE III proposal, see IMC PHASE III proposal, 420 ft420 ft22 falls in the other category as it is falls in the other category as it is storage.storage.

Editing Room 120 sq. ft.Editing Room 120 sq. ft.

Page 27: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Instructional Media Center aka AV Instructional Media Center aka AV Delivery OfficeDelivery Office

Should be on first floor of building Should be on first floor of building between the Multipurpose room and between the Multipurpose room and Large lecture hall. Large lecture hall.

Should have access to the road at the Should have access to the road at the back of the building with a driveway for back of the building with a driveway for deliveries.deliveries.

Should have easy access to building Should have easy access to building elevators (through a back door?)elevators (through a back door?)

Page 28: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Other -17,000 sq.ft Other -17,000 sq.ft

Multipurpose room with food service Multipurpose room with food service area.area.

Storage- Basement?Storage- Basement? External ramp for wheelchairs bridging External ramp for wheelchairs bridging

this building and the existing Humanities this building and the existing Humanities building.building.

2 AV videoconferencing rooms for IMC 2 AV videoconferencing rooms for IMC (420 ft(420 ft22)) see IMC PHASE III proposal see IMC PHASE III proposal..

Page 29: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Multipurpose room- 5,000 to 7,000 Multipurpose room- 5,000 to 7,000 SQ.FT?SQ.FT? Multipurpose room attached to food service Multipurpose room attached to food service

area.area. Folding tables for eating, storage closets in Folding tables for eating, storage closets in

room for folded tables.room for folded tables. Small Stage for functionsSmall Stage for functions Folding Bleachers, out of walls.Folding Bleachers, out of walls. Divided food service area with access to Divided food service area with access to

covered covered patio (overlooking Jaeger?), so a patio (overlooking Jaeger?), so a function can take place in the main dining room function can take place in the main dining room leaving a smaller food service area for leaving a smaller food service area for students.students.

Page 30: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Needs to be met by Multipurpose Needs to be met by Multipurpose RoomRoom

Food Service and indoor eating area.Food Service and indoor eating area. Area for award ceremonies, student Area for award ceremonies, student

orientations and other functions.orientations and other functions. Area for students activities and study in Area for students activities and study in

groups between classes (indoors during groups between classes (indoors during bad weather).bad weather).

Page 31: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Other:Astronomical ObservatoryOther:Astronomical Observatory

5 meter diameter, 8 meter height on 5 meter diameter, 8 meter height on roof of building.roof of building.

Video-recording with feed into adjacent Video-recording with feed into adjacent classroom with LCD projector.classroom with LCD projector.

Page 32: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Other Considerations?Other Considerations?

Locking storage cabinets for instructor Locking storage cabinets for instructor use (as in science labs) rather than so use (as in science labs) rather than so many carts. Computer underneath desk many carts. Computer underneath desk in front, LCD.in front, LCD.

BIG whiteboards!!!BIG whiteboards!!! Decentralized restrooms? Some Single Decentralized restrooms? Some Single

Unisex Restrooms near office clusters. Unisex Restrooms near office clusters.

Page 33: MV STRATEGIC PLANNING PLAN FOR PHASE III Final Draft Date: 10-26-04.

Web Site- Facilities Planning Web Site- Facilities Planning ManualManual

http://www.cccco.edu/divisions/cffp/http://www.cccco.edu/divisions/cffp/facilities/refs/fac_pln_mnl.htmfacilities/refs/fac_pln_mnl.htm