Foreseen Central DAQ changes
• Migration to tdaq-05 --> migration to SLC6 for the SBCs and detector computers. Spring 2014 ?
• Experience shows: usually painless, but needs to be synchronized (drivers,…)
• Data sampling for DQ will not be done anymore at the event builder nodes (which will not exist anymore), but through the trigger, using a new “monitoring stream”.
To be presented/discussed tomorrow
3
CSC plans
• Old off-detector readout system needed at least until December 2014 to re-commission the wheels once they are both back in working position
• New off-detector readout system under development:– Run at 100kHz L1 rate w/o deadtime – Implement ROD stop-less removal/recovery – Implement TTC restart – Abandon the txt files for loading the calibration results
into the RODs in favor of using COOL – Improve OKS description to feed the status of resources
4
MDT plans
• Working on an MROD with a second output and with that, one can split the towers with the high rates.
• 48 extra read out links and only a few (8 ?) extra MRODs need to be installed.
5
RPC plans
• Fairly extensive review/rewrite of the RPC Lvl1/DAQ software
• Upcoming update of the CAN interfaces which requiring porting the software to the new API
• Move the configurations to a database• Improve configuration time of the trigger towers and
make recovery of misalignments during runs more robust.
• Better integrate the RODs and their relative SLs to solve some reconfiguration and timing issues.
6
TGC plans
• Try to reproduce “FE noise burst” problem with test-bench in Blb 188. If something found, will try something with the standalone or global, July~August.
• DAQ needed for development of the new Sector Logic firmware. Plan to do some tests using the standalone partition, around May~June.
• Later, could try to speed up the access to configuration d/base and the actual configuration.
• Work needed in the condition d/base area. Goal: go as standard as possible.
7
Central issues
• "MUON" standalone partition, to run TGC + MDT, RPC + MDT with a muon trigger; setting this up with the LTPI involves work. Do we want it ?
• Keeping track of active/inactive/abandoned/removed detector elements in a common way
• MRS and TDAQ messaging service. Muons DDC makes some non-standard use (callbacks hooked to the exchanged messages). Do we want to improve on this?