Muni Subway Expansion project Railvolution October 10, 2016 1

Transcript of Muni Subway Expansion project - Rail~Volution

Page 1: Muni Subway Expansion project - Rail~Volution

Muni Subway Expansion project

Railvolution

October 10, 2016

1

Page 2: Muni Subway Expansion project - Rail~Volution

Agenda

• SF rail history and context

• Existing conditions

• Proposed project and benefits

• Status and next steps

2

Page 3: Muni Subway Expansion project - Rail~Volution

• SF rail history and context

• Existing conditions

• Proposed project and benefits

• Status and next steps

3

Agenda

Page 4: Muni Subway Expansion project - Rail~Volution

4

Rail has been a part of SF history for 100+ years. Major early investments: Twin Peaks Tunnel, Sunset Tunnel, Stockton Tunnel

Mayor Rolph at the controls of Streetcar 117 for the opening of the Twin Peaks Tunnel | February 3, 1918

Page 5: Muni Subway Expansion project - Rail~Volution

Why not all?

5

Like most cities, we removed most of our streetcars…

1940 1960

Images courtesy Chris Arvin, “Where the streetcars used to go” sfstreetcars.co

Tunnels!

Page 6: Muni Subway Expansion project - Rail~Volution

6

Fast forward to 1970s, introduction of BART

Page 7: Muni Subway Expansion project - Rail~Volution

7

Muni Metro hybrid system is born - creating complex

operational conditions

• Running in both subway and on street in mixed traffic

• Multiple lines merging into one subway tunnel, entering/exiting through three portals

• Five-car modern high-floor station platforms in new subway stations

Page 8: Muni Subway Expansion project - Rail~Volution

8

Fast forward to 2016: now we are bursting at the seams!

Page 9: Muni Subway Expansion project - Rail~Volution

9

We’ve made a lot of improvements and have more on the way

• “Red carpet” transit only

lanes for Rapid Network (rail +

bus) and expanded transit

signal priority

• Maintenance campaigns

have driven up on-time

performance

• Replacement and expansion

of light-rail vehicle fleet –

“The Game Changer.” First

new vehicles arrive the end of

the year.

• Central Subway – first tunnel

in SF since BART, opens 2019

Page 10: Muni Subway Expansion project - Rail~Volution

10

But more is needed and there’s a renewed effort to think BIG

and visionary

Page 11: Muni Subway Expansion project - Rail~Volution

• SF rail history and context

• Existing conditions

• Proposed project and benefits

• Status and next steps

11

Agenda

Page 12: Muni Subway Expansion project - Rail~Volution

12

Agenda

Page 13: Muni Subway Expansion project - Rail~Volution

13

Source: San Francisco’s West of Twin Peaks; Arcadia, 2006, p. 61

19th Avenue

Then and Now

Page 14: Muni Subway Expansion project - Rail~Volution

14

19th Avenue Today

Page 15: Muni Subway Expansion project - Rail~Volution

What problems are we

trying to solve?

15

Page 16: Muni Subway Expansion project - Rail~Volution

16

Rail Crowding

Source: Metropolitan Transportation Commission Core Capacity Transit Study Briefing Book

Page 17: Muni Subway Expansion project - Rail~Volution

17

Transit-car conflicts: re-current delay

Page 18: Muni Subway Expansion project - Rail~Volution

18

Transit-car conflicts: non-recurrent delay

Page 19: Muni Subway Expansion project - Rail~Volution

19

Median station access a safety challenge

Page 20: Muni Subway Expansion project - Rail~Volution

20

Conditions for people walking in need of improvement

19th Avenue is part of

12% of miles of

street

Where 70% of all

severe and fatal

collisions in San

Francisco occur

Page 21: Muni Subway Expansion project - Rail~Volution

21

Growth is coming

Planned New Housing Units

Image Credit: San Francisco Planning Department data as cited in SFCTA, San Francisco Transportation Plan 2040

Page 22: Muni Subway Expansion project - Rail~Volution

Agenda

• SF rail history and context

• Existing conditions

• Proposed project and benefits

• Status and next steps

22

Page 23: Muni Subway Expansion project - Rail~Volution

23

We started by studying partial grade separations

Page 24: Muni Subway Expansion project - Rail~Volution

24

And then came up with the Full Subway proposal

To Daly City

Page 25: Muni Subway Expansion project - Rail~Volution

25

What are the benefits?

Page 26: Muni Subway Expansion project - Rail~Volution

26

Stations platforms long

enough for 5-car trains

Stations platforms long

enough for 3-car trains

Where platforms

existing, 2-car long.

Challenges to surface

operation of 3+ long

trains

Increased rail capacity due to 4-car trains

New stations built for 4-car long trains would allow 2x as much capacity for each slot in the tunnel

Page 27: Muni Subway Expansion project - Rail~Volution

27

Increased rail capacity due to improved reliability

Page 28: Muni Subway Expansion project - Rail~Volution

28

Safety and public realm improvements

Existing

Proposed

Page 29: Muni Subway Expansion project - Rail~Volution

$2.5-$3 Billion

Must compete for

limited funding

against other

worthy projects.

29

Benefits and costs

A less crowded train

Faster, more reliable trips on Muni Metro

Safe station access

Safe comfortable street

Improve environment/ quality of life

Page 30: Muni Subway Expansion project - Rail~Volution

30

Ongoing community engagement since 2012

Page 31: Muni Subway Expansion project - Rail~Volution

31

Positive media coverage!

Page 32: Muni Subway Expansion project - Rail~Volution

• SF rail history and context

• Existing conditions

• Proposed project and benefits

• Status and next steps

32

Agenda

Page 33: Muni Subway Expansion project - Rail~Volution

33

• Technical work completed includes:

– Conceptual alignment

– Conceptual profile

– Conceptual station designs

– Caltrans project initiation document

– Preliminary environmental assessment

– Capital cost estimates

Where we are in process: very early.

PlanningPreliminary

Engineering(includes environmental

review – NEPA/CEQA)

Detail Design Construction

Inception

2012 - 2018 2018 - TBD TBD TBD2011expected duration ~ 2-3 years expected duration ~ 4-5 years expected duration ~ 3-10 years

Project Approval

Project Prioritization

via Connect SF

Page 34: Muni Subway Expansion project - Rail~Volution

I am also presenting tomorrow Tuesday 10/11 7:30-10pm

“Battle of the Modes” Tuesday 7:30-10pm during Pecha Kucha Slam, Great American

Music Hall 859 O’Farrell Street

Liz Brisson

[email protected]

415.701.4791

34

Thank you. Questions?