MS for Lighting & Small Power Installation

download MS for Lighting & Small Power Installation

of 17

Transcript of MS for Lighting & Small Power Installation

  • 8/18/2019 MS for Lighting & Small Power Installation

    1/17

    APCPCWM_482853 9:WP_0000001WP _0000001

        A    P    C    P    C    W    M_

        4    8    2    8    5    3    9   :    W    P_

        0    0    0    0    0    0    1    W    P_

        0    0    0    0    0    0    1

    16-May-12 DANNY J.Y.JEONG K.J.LIM

    Date Drawn Checked Approved

    Owner :

     A For Information

    Rev. Details of Revision

      AES-VCM MONG DUONG POWERCOMPANY LIMITED

    Owner's Engineer :

    Doosan Heavy IndustriesVietnamDung Quat Economic Zone,

    Binh Thuan, Binh Son, Quang Ngai,

    Vietnam

    T +84 55 5618 900

    F +84 553 618 950

    Project : PC : T10206

    UAS : DD09

    Unit : P0

    Contractor :

    MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진

  • 8/18/2019 MS for Lighting & Small Power Installation

    2/17

    AP P _4828539: P_0000001 P_0000001

    AP

    P

    _4828539

       :

    P_0000001

    P_0000001

    SI NO. PAGE NO.

    1.0 3

    2.0 3

    3.0 3

    4.0 3

    5.0 3-5

    6.0 EQUIPMENT AND TOOLS 6

    7.0 ENVIRONMENT, HEALTH AND SAFETY (EHS) 7

      REFERENCE DOCUMENTS

      WORK PROCEDURE

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    I N D E X

    DESCRIPTION

      PURPOSE

      SCOPE

      PRINCIPLE

    AES‐VCM

    8.0 8-10

    9.0 10

      RISK ASSESSMENT

      ATTACHMENT

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon

    AP P _4828539: P_0000001 P_0000001

    0000001

    20 2 05 6 5:37/EPC)Mong Duong II 건설사무소전기부/jinyong jeon

  • 8/18/2019 MS for Lighting & Small Power Installation

    3/17

    AP

    P

    _4828539

       :

    P_0000001

    P_0

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    AES‐VCM

    1.0 PURPOSE

    2.0 SCOPE

    3.0 PRINCIPLE

    All the concerning works’ procedure should follow this method statement.

    4.0 REFERENCE DOCUMENTS

    4.1 Issued For Construction Drawings.

    4.2 Approved Contract Quality Plan

    4.3 Project EHSS Management Plan

    This document lays down the procedure to be followed in the installation of Lighting & Small

    Power and its accessories.

    This work procedure stipulates engineering standard,work process and techniques, and quality

    management guidelines pertaining to the installation of Lighting & Small Power as well as

    the accessories for Mong Duong 2 Coal Fired Power Plant Project.

    5.0 WORK PROCEDURE

    5.1 BEFORE INSTALLATION

    5.1.1 Make sure that materials to be used for construction are always approved,

    identified and properly preserved.

    5.1.3 Only the authorized and qualified personnel are allowed to perform such

    required works at site.

    5.1.4 The latest Approved Construction Drawings shall be used.

    5.1.5Lighting & Small Power Installation shall be confirmed with layout drawings

    and proper coordination must be done for any obstruction

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon

    AP P _4828539: P_0000001 P_0000001

    01

    P_0000001

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon

  • 8/18/2019 MS for Lighting & Small Power Installation

    4/17

    AP

    P

    _4828539

       :

    P_000000

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    AES‐VCM

    5.2.3 Careful handling of lighting fixtures and receptacles upon installation must be properlyimplemented to avoid damages.

    5.2.4Installed lighting fixtures and receptacles shall be aligned and leveled properly. It must

    be free of dirt or any chemical impurities.

    5.2.5 Prior to installation, check lighting fixtures accessories and make sure internalconnection are completed.

    5.2.6 Unless otherwise shown, mounting heights of lighting fixtures shall be generally asfollows:

     A) I)Low bay lighting fixture in general indoors areas of industrial plants shall be

    3500MM from bottom to finish.

      II)Medium bay lighting fixture shall be 3500MM to less than 7000MM from

    bottom to finished floor.

      III)High bay lighting fixture shall be 7000MM and above from bottom tofinish floor.

    B) Light over door openings shall be 300MM bottom of fixture above top of 

    opening.

    C) In boiler galleries, the mounting heght of fixture will be 2500MM from

    platform except as shown.

    D) Receptacles:

      I)In control room/office shall be 300MM from finish floor to center.

      II)Elsewhere shall be 1000MM from finish floor to center.

    E) Local Swicthes shall be 1500MM from finish floor to center.

    F) Lighting Panels shall be 1800MM from finish floor to top.

    5.2.7 Unless otherwise noted ,all the lighting fixture shall be fed from respective

    lighting panels. Normal AC lighting panels will be fed from MLDB. Emergency

    AC lighting panels will be fed from emergency MLDB.DC emergency lighting

    distribution boards will be fed from Main DC distribution boards.

    5.2.8 All outdoor lighting poles/towers shall be provided with MCB's at their base

    while receiving incoming cable.

    5.2.9 Separate conduit shall be used for wiring lighting circuit of different lighting

    distribution such as Normal AC lighting/emergency DC lighting.

    5.2.10 AC & DC shall not be run in the same conduit and jb.Circuit fed from different

    transformer and different batteries (DC source) shall not be run through same

    / ) g g 설사무 기부/j y g j

    AP P _4828539: P_0000001 P_0000001

    _0000001

    P_0000001

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon

  • 8/18/2019 MS for Lighting & Small Power Installation

    5/17

    AP

    P

    _4828539

       :

    P_

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    AES‐VCM

    5.2.12 For classified hazardous area having flammable gases and vapors only, all items

    and accessories of illumination system shall be explosion proof.

    The lighting and small power system will meet the requirements established in

    NFPA 499 for the appropriate hazard classification.5.2.13 All outdoor lighting located in wet locations and small power circuits will use

    ground-faults circuit interrupter (GFCI) protection for safety.

    5.2.14 Elevation of lighting fixtures shall be in accordance with AFC.

    5.2.15Installation of Aviation lighting shall be accessble from landing plarform. It shall

    be installed as per AFC.

    5.2.16 Correct rated voltage of power supply shall be check prior for energizing.

    5.2.17 Continuity & Insulation resistance test for each circuit shall performed prior forenergizing. It must be recorded.

    5.2.18 Illumination test shall be performed during energizing and must be recorded.

    LIGHTING SUB-DISTRIBUTION BOARD/PANEL

    5.2.19 Location of Sub-distribution board installation shall be as per AFC drawing.

    However exact location may be vary as per site condition. As built plan if 

    necessary

    5.2.20 It shall be mounted with appropriate support and aligned properly.

    5.2.21 It shall be free of damages and missing accessories.

    5.2.22 Circuit Breaker ratings and number of poles are as per AFC drawing.

    5.2.23 Mounting height shall be in accordance with AFC drawing.

    5.2.24 Sub-distribution board shall be properly grounded as per AFC drawing.

    5.2.25 Installed Sub-distribution board shall have padlocking facility.

    5.2.26 Installed Sub-distribution board shall be as per required degree of protection

    per area (IP41 for indoor & IP55 for outdoor.

    5.2.27 Upon completion of installation, field engineer in coordination with QA/QC

    shall notify AES inspector to perform the required inspection in order to assure

    that all requirements are met. All inspection and testing shall be in accordance

    with inspedtion plan. AP P _4828539: P_0000001 P_0000001

    39   :

    P_0000001

    P_000

    0001

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon

  • 8/18/2019 MS for Lighting & Small Power Installation

    6/17

    AP

    P

    _482853

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    AES‐VCM

    6.0 EQUIPMENTS & TOOLS

    6.1 Electric Hand Drill

      6.3 Hand Crimping Tools

    6.2 Electrical Hand Tools

    6.2 Hand Cable Cutter

    6.2 Adjustable Wrench

    6.2 Pipe Vise

    6.2 Ground Resistance Tester

    6.2 Insulation Tester6.2 Digital Multimeter

    6.2 Other electrical tools..

    AP P _4828539: P_0000001 P_0000001

    _4828539

       :

    P_0000001

    P_00

    00001

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon

  • 8/18/2019 MS for Lighting & Small Power Installation

    7/17

    AP

    P

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    AES‐VCM

    7.0 ENVIRONMENT, HEALTH AND SAFETY (EHS)

    7.1 Responsibilities and Instructions

    7.1.1 PM/EHSS Officer shall ensure that all work is undertaken in accordance with the

    specified work scope.

    7.1.2 Safety training should be conducted to all personnel assigned at site prior to

    commence any work.

    7.1.3 All personnel should know the locations of fire extinguishers, communications,

    manual alarms & ESD points.

    7.1.4 All personnel should be aware of assembly points, escape routes, emergency

    contact numbers.

    7.1.5 Personal Protective Equipment (PPE) shall be worn at all times.

    7.1.6 Good housekeeping shall be observed in work areas.

    7.1.7 Construction wastes shall be segregated and disposed to an approved dump

    yard area.

    7.1.8 Keep non-essential workers clear of machinery whilst it is in operation.

    7.1.9Proper inspection of all equipments prior to use to avoid leakage and

    equipment failure.

    7.1.10 Permit to work shall be obtained appropriately for the type of work and

    location.

    7.1.11 All vehicles must comply and observed speed limit of 10km/h on site.

    7.1.12 Excavation and delivery of materials are prohibited during heavy rains.

    7.1.13 Adequate lighting equipments when working night time.

    7.1.14Ensure all workers and equipments working overtime are properly accounted

    and obtained permit/approval from Doosan EHS Manager prior to carry-on

    works. Regular working time is from 6:30 am ~ 5:00 pm.

    7.1.15 Periodic refresher trainings, tool box talk and audit shall be conducted.

    7.2 Safety ( PPE )

    7 2 1  _ 4 8 2 8 5 3 9 : _ 0 0 0 0 0 0 1 _ 0 0 0 0 0 0 18    5

        3    9   :

    _    0    0    0    0    0    0    1

    _    0    0    0    0    0    0    1

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    8/17

    _    4    8    2    8

    8.0 RISK ASSESSMENT (#1)

    L S Risk L S Risk

    3 6 C 2 4 D

    2 4 D 1 2 E

    3 8 B 2 4 C

    A.1 Not properly equipped with

    PPEInjury

    C.6 Experienced lifting supervisor

    at all times

    Injury

    C2 1 6

    C.7 Only monthly checking color

    attached lifting tools allowed to

    use

    A.2 Make the worker to take

    enough rest

    TASK/ JOB STEPS

    C.1 Prepare a lifting plan for over

    10 tons and submit PTW

    B.1 Check the access road before

    passing the areaInjury

    B.2 Designate a signalman when

    moving the equipment

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    BASE RISK 

    (WITHOUT CONTROL)

    MITIGATING CONTROLS

    RESIDUAL RISK 

    (WITH CONTROL)

    A. Workers

    8 B

    A.1 Instructing to wear proper PPE

    A.2 Worker abnormal physical

    condition (drunken&fatigue)

    C. Heavy lifting worksC. Crushing may cause fatal injury

    or permanent disability

    TYPE OF DAMAGELIST OF HAZARDS

    B. Transportation of equipment &

    delivery of materialsB. Crash/ traffic accident

    C.2 Only a qualified and Certified

    operators. Signalman should be in-

    place

    C.3 Do not stand beneath the

    lifting areas

    C.4 Ensure loads are fixed with

    sling belt correctly

    C.5 All lifting equipments must be

    in good conditions

    C.8 All lifting tools must haveidentification tag (including serial

    number certification number SWL

    AES‐VCM

    3 6 B 2 4 CInjury

    D.1.b Check the lifting

    devices(slings, shackles, etc…) for

    proper and safe use

    D.1.e All lifting tools must have

    identification tag (including serial

    number,certification number, SWL

    C.9 Provide safe emtramce amd

    exit access road for the labors

    passing

    D. Unloading equipment and

    materials

    D.1.a Make sure the sling is

    tied/binded/tightened correctly

    D.1.d Only monthly checking color

    attached lifting tools allowed to

    use

    D.1 Struck down by things and

    materials

    D.1.c Analyzing the load (wight,shape, lifting points, etc…) and the

    liftinf device

    , ,

    inspection date and due date)

     _ 4 8 2 8 5 3 9 : _ 0 0 0 0 0 0 1 _ 0 0 0 0 0 0 1

    _    4    8    2    8    5    3    9   :

    _    0    0    0    0    0    0    1

    _    0    0    0    0    0    0    1

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    9/17

    _

    8.0 RISK ASSESSMENT (#2)

    L S Risk L S Risk

    3 6 C 1 2 D

    3 6 C 2 4 D

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    TASK/ JOB STEPS LIST OF HAZARDS TYPE OF DAMAGE

    BASE RISK (WITHOUT CONTROL)

    MITIGATING CONTROLS

    RESIDUAL RISK 

    (WITH CONTROL)

    2 8 B 1 4

    E.1.d Checklist on all vehicles must

    be provided everyday.

    injury

    E.1 Collision between machines.

    Overturning may cause death or

    permanent disability

    F.1.a Must provide sufficient

    lightnings on the entire working

    area

    E.2 Unnecessary movements of 

    equipments towards a person that

    causes injury and damage to

    materials

    E.1.c Adequate warning signboards

    C

    E. Equipment and material

    preparation for Temp. facilities

    E.1.a Always keep the site clear of 

    any obstructions.E.1.b Tool-box talks on a daily

    basis

    E.2.a Provide a signalman who is

    wearing reflective vest

    E.2.c Equipment used to clear the

    site should be controlled and soted

    by a banksman

    E.2.d Provide safe entrance and

    exit for the workers going to the

    area

    E.2.b Heavy machinery should have

    backward movement warning light

    and beacon

    injury

    E.2.e All vehicles entering on the

    site must turn-on their headlights

    day and night time

    F. Working opearation during

    night time

    E.3 Equipment oil leakage during

    operationpollution

    E.3.a Daily check of the

    equipments prior to work

    F.1.b All equipments must ensure

    all lights are operational and notobscured by dirt or mud

    F.1 Working operation of the

    equipments may cause injury to

    personnel due to poor visibility of 

    the area

    AES‐VCM

    2 6 CF.1.f Must use and connect 3 core

    codes electric wire and separate

    distribution pannel (must pass

    arrangement of ELCB) and avoid

    any water affect

    B

    Injury

    . .c uperv sor mus aways e

    present for the entire working

    operation

    F.1.d All workers must be wearing

    reflective vest

    F.1.g Provide safe entrance and

    exit access road for the labors

    passing

    F.1.h All kinds of electric cable

    must be hanged over ground

    F.1.i Must use industrial socket and

    plug

    1 j l i bi h ld

    F.1.e Ambulance car and

    designated nurse must be on

    stand-by for the entire working

    operation

    4 8

     _ 4 8 2 8 5 3 9 : _ 0 0 0 0 0 0 1 _ 0 0 0 0 0 0 1

    _    4    8    2    8    5    3    9   :

    _    0    0    0    0    0    0    1

    _    0    0

        0    0    0    0    1

    20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    10/17

    8.0 RISK ASSESSMENT (#3)

    L S Risk L S Risk

    2 8 B 1 6 C

    METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION

    TASK/ JOB STEPS LIST OF HAZARDS TYPE OF DAMAGE

    BASE RISK (WITHOUT CONTROL)

    G.2 Generator(diesel) equipment

    oil leakage during operation

    Injury

    Pollution

    G. Welding and cutting works G.1 Electric shock, fire, burn to

    body and injury to eye may causedeath or permanent disability

    G.1.a Proper earthing and

    connection of welding machinesand generators

    G.1.b Fashback arrestor and gauge

    should be installed prior to use

    cutting cylinders

    G.1.d Must use and connect 3 core

    codes electric wire and separate

    distribution pannel (must pass

    arrangement of ELCB) and avoid

    3 6

    G.2.a Daily check of the

    equipments prior to start of work

    C 2 4

    MITIGATING CONTROLS

    RESIDUAL RISK 

    (WITH CONTROL)

    D

    G.2.b Regular monitoring of the

    equipment in order to control and

    prevent oil leakage and other

    engine trouble

    G.1.c Proper PPE to be worn at all

    times

    G.2.c Provide secondarycontainment protection under the

    G.1.e All kinds of electric cablemust be hanged over ground

    G.1.f Must use industrial socket

    and plug

    G.1.g Electric cabinet should not

    affect any water

    AES‐VCM

    3 6 C 2 4 D

    9.0

    9.1

    G.3 Oil/chemical storage

    Job Safety Environment

    Analysis (JSEA)

    Attachment

    Pollution

    G.2.d If oil leakage, must remove

    the oil and contaminated soil

    immediately

    G.3 Diesel/chemical shall be stored

    in secondary containment and

    MSDS requirements shall be

    communicated with all concerned

     

    contamination of the soil by oil

    spillage

    APCPCWM_4828539:WP_0000001WP_0000001

    8    2    8    5    3    9   :    W    P_    0    0    0    0    0    0    1    W    P_    0    0    0    0    0    0

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    11/17

        A    P    C    P    C    W    M_    4    8

    Task : LIGHTING & SMALL POWER INSTALLATION

    Prepared by : Reviewed by : Approved by :

    Original Date : Revised by : Rev. Date: Revision : A  

    Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask  

     Yes Yes Yes Yes Tack Out No No

    Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others

     Yes No Yes Yes

    Other Safety Equipment Required :

    Remarks :

     A. Workers  A.1 Instructing to wear proper PPE

    JOB SAFETY ENVIRONMENT ANALYSISAES-VCM

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,

    minimize or eliminating hazards.

    List of All Job Steps List of All Known Hazards How to Eliminate Hazards

     A.1 Not properly equipped with PPE properly equipped with PPE

     A.2 Make the worker to take enough rest

    B. Crash/ traffic accident B.1 Check the access road before passing the area

    C. Heavy Lifting Works

    C.3 Do not stand beneath the lifting areas

    C.4 Ensure loads are fixed with sling belt correctly

    C.5 All lifting equipments must be in good conditions

    C.6 Experienced lifting supervisor at all times

    C.7 Only monthly checking color attached lifting tools allowed to use

     A.2 Worker abnormal physical condition (drunken&fatigue)

    B. Transportation of equipment & delivery of materials

    B.2 Designate a signalman who wear the red suit and safety helmet and control

    the work.

    C. Crushing may cause fatal injury or permanent disability C.1 Preparation of a rigging lift list and plans for lifts of ten (10) tons or greater.

    C.2 Only a qualified and Certified operators. Signalman should be in-place

    Page 11

    Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001

    M_    4    8    2    8    5    3    9   :    W    P_    0    0    0    0    0    0    1    W    P_    0    0

        0    0    0    0

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    12/17

        A    P    C    P    C    W    M

    Task : LIGHTING & SMALL POWER INSTALLATION

    Prepared by : Reviewed by : Approved by :

    Original Date : Revised by : Rev. Date: Revision : A  

    Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask  

     Yes Yes Yes Yes Tack Out No No

    Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others

     Yes No Yes Yes

    Other Safety Equipment Required :

    Remarks :

    JOB SAFETY ENVIRONMENT ANALYSISAES-VCM

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,

    minimize or eliminating hazards.

    List of All Job Steps List of All Known Hazards How to Eliminate Hazards

    C.8 All lifting tools must have identification tag (including serial number,

    certification number, SWL inspection date and due date)

    D.1 Struck down by things and materials

    D.1.b Check the lifting devices(slings, shackles, etc…) for proper and safe use

    D.1.c Analyzing the load (wight, shape, lifting points, etc…) and the lifting device

    D.1.d Only monthly checking color attached lifting tools allowed to use

    D.1.e All lifting tools must have identification tag (including serial number,

    certification number, SWL inspection date and due date)

    D.1.f Provide safe emtramce amd exit access road for the labors passing

    C.9 Provide safe emtramce amd exit access road for the labors passing

    D. Unloading Equipment and Materials D.1.a Make sure the sling is tied/binded/tightened correctly

    Page 12

    Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001

    W    M_    4    8    2    8    5    3    9   :    W    P_    0    0    0    0    0    0    1    W    P_    0    0    0    0    0    0

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    13/17

        A    P    C    P    C    W

    Task : LIGHTING & SMALL POWER INSTALLATION

    Prepared by : Reviewed by : Approved by :

    Original Date : Revised by : Rev. Date: Revision : A  

    Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask  

     Yes Yes Yes Yes Tack Out No No

    Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others

     Yes No Yes Yes

    Other Safety Equipment Required :

    Remarks :

    JOB SAFETY ENVIRONMENT ANALYSISAES-VCM

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,

    minimize or eliminating hazards.

    List of All Job Steps List of All Known Hazards How to Eliminate Hazards

    D.2 Squeezed by the sling D.2.a Use hand gloves when tightning the slings

    D.2.b Tightnig the slings before carrying-out lifting

    D.3 Squeezed by the materials

    D.4 Crane fall accidentally

    E.1.a Always keep the site clear of any obstructions.

      E.1.b Tool-box talks on a daily basisE.1.c Adequate warning signboards

    E.2 Unnecessary movements of equipments towards a person that causes injury

    and damage to materials

    E.2.a Designate a signalman who wear the red suit and safety helmet and control

    the work

    E.2.b Heavy machinery should have backward light and beacon movement

    warning

    D.3.a Use wooden bar sa support of the materials on the ground

    D.4.a Analyzing the loads (weight, shape, lifting points, etc…) and lifting device

    to suit the crane capacity

    E. Equipment and material preparation for Temp. facilities E.1 Collision between machines. Overturning may cause death or permanent

    disability

    E.1.d Checklist on all vehicles must be provided everyday.

    Page 13

    Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001

    C    P    C    W    M_    4    8    2    8    5    3    9   :    W    P_    0    0    0    0    0    0    1    W    P_    0

        0    0    0    0    0

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    14/17

        A    P    C

    Task : LIGHTING & SMALL POWER INSTALLATION

    Prepared by : Reviewed by : Approved by :

    Original Date : Revised by : Rev. Date: Revision : A  

    Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask  

     Yes Yes Yes Yes Tack Out No No

    Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others

     Yes No Yes Yes

    Other Safety Equipment Required :

    Remarks :

    JOB SAFETY ENVIRONMENT ANALYSISAES-VCM

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,

    minimize or eliminating hazards.

    List of All Job Steps List of All Known Hazards How to Eliminate Hazards

    E.2.c Equipment used to clear the site should be controlled and soted by a

    banksman

     E.3 Equipment oil leakage during operation E.3.a Daily check of the equipments prior to work

     

    F.1.c Supervisor must always be present for the entire working

    F.1.d All workers must be wearing proper PPE

    F.1.e Ambulance car and designated nurse must be on stand-by for the entire

    working operation

    E.2.e All vehicles entering on the site must turn-on their headlights day and night

    time

    F. Working Operation During Night Time. F.1 Working operation of the equipments may cause injury to personnel due to

    poor visibility of the area.

    F.1.a Must provide sufficient lightnings on the entire working area

    F.1.b All equipments must ensure all lights are operational and not

    E.2.d Provide safe entrance and exit for the workers going to the area

    Page 14

    Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001

    A    P    C    P    C    W    M_    4    8    2    8    5    3    9   :    W    P_    0    0    0    0    0    0    1    W    P_    0    0    0    0    0    0

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    15/17

        A

    Task : LIGHTING & SMALL POWER INSTALLATION

    Prepared by : Reviewed by : Approved by :

    Original Date : Revised by : Rev. Date: Revision : A  

    Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask  

     Yes Yes Yes Yes Tack Out No No

    Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others

     Yes No Yes Yes

    Other Safety Equipment Required :

    Remarks :

    JOB SAFETY ENVIRONMENT ANALYSISAES-VCM

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,

    minimize or eliminating hazards.

    List of All Job Steps List of All Known Hazards How to Eliminate Hazards

    F.1.f Must use and connect 3 core codes electric wire and separate any water 

    affect

    F.2 Generator (Diesel) equipment oil leakage

    F.3 Oil chemical storage

    F.2.c Provide secondary containment protection under the equipment to prevent

    contamination of soil by oil spillage

    F.3. Diesel/chemical shall be stored in secondary containment & MSDS

    F.1.h All kinds of electric cable must be hanged over ground

    F.1.i Must use industrial socket and plug

    F.1.j Electric cabinet should not affect any water 

    F.2.a Daily check of the equipment prior to start of work

    F.2.b Regular check & monitoring of the equipment prior to use

    F.1.g Provide safe entrance and exit access road for the labors passing

    Page 15

    Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001

        A    P    C    P    C    W    M_    4    8    2    8    5    3    9   :    W    P_    0    0    0    0    0    0    1    W    P_

        0    0    0    0    0    0

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    16/17

    Task : LIGHTING & SMALL POWER INSTALLATION

    Prepared by : Reviewed by : Approved by :

    Original Date : Revised by : Rev. Date: Revision : A  

    Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask  

     Yes Yes Yes Yes Tack Out No No

    Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others

     Yes No Yes Yes

    Other Safety Equipment Required :

    Remarks :

    JOB SAFETY ENVIRONMENT ANALYSISAES-VCM

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,

    minimize or eliminating hazards.

    List of All Job Steps List of All Known Hazards How to Eliminate Hazards

    G. Welding and cutting works G.1.b Fashback arrestor and gauge should be installed prior to use cutting

    cylinders

    G.1 Electeric shock, fire burn to body and injury to eye may cause death or 

    permanent disability.

    G.1.e All kinds of electric cable must be hanged over ground

    G.1.f Must use industrial socket and plug

    G.1.g Electric cabinet should not affect any water 

    G.2 Generator(diesel) equipment oil leakage during operation G.2.a Daily check of the equipments prior to start of work

    G.2.b Regular monitoring of the equipment in order to control and prevent oil

    leakage and other engine trouble

    G.2.c Provide secondary containment protection under the equipment to prevent

    contamination of the soil by oil spillage

    G.1.c Proper PPE to be worn at all times

    G.1.d Must use and connect 3 core codes electric wire and separate distribution

    pannel (must pass arrangement of ELCB) and avoid any water affect

    Page 16

    Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001

        A    P    C    P    C    W    M_    4    8    2    8    5    3    9   :    W    P_    0    0    0    0    0    0    1    W    P_    0    0    0    0    0    0

    2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용

  • 8/18/2019 MS for Lighting & Small Power Installation

    17/17

    Task : LIGHTING & SMALL POWER INSTALLATION

    Prepared by : Reviewed by : Approved by :

    Original Date : Revised by : Rev. Date: Revision : A  

    Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask  

     Yes Yes Yes Yes Tack Out No No

    Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others

     Yes No Yes Yes

    Other Safety Equipment Required :

    Remarks :

    JOB SAFETY ENVIRONMENT ANALYSISAES-VCM

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,

    minimize or eliminating hazards.

    List of All Job Steps List of All Known Hazards How to Eliminate Hazards

    G.2.d If oil leakage, must remove the oil and contaminated soil

    G.3 Oil/chemical storage G.3 Diesel/chemical shall be stored in secondary containment and MSDSrequirements shall be communicated with all concerned

    Page 17

    Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved.