MS for Lighting & Small Power Installation
-
Upload
ganga-daran -
Category
Documents
-
view
223 -
download
2
Transcript of MS for Lighting & Small Power Installation
-
8/18/2019 MS for Lighting & Small Power Installation
1/17
APCPCWM_482853 9:WP_0000001WP _0000001
A P C P C W M_
4 8 2 8 5 3 9 : W P_
0 0 0 0 0 0 1 W P_
0 0 0 0 0 0 1
16-May-12 DANNY J.Y.JEONG K.J.LIM
Date Drawn Checked Approved
Owner :
A For Information
Rev. Details of Revision
AES-VCM MONG DUONG POWERCOMPANY LIMITED
Owner's Engineer :
Doosan Heavy IndustriesVietnamDung Quat Economic Zone,
Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950
Project : PC : T10206
UAS : DD09
Unit : P0
Contractor :
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진
-
8/18/2019 MS for Lighting & Small Power Installation
2/17
AP P _4828539: P_0000001 P_0000001
AP
P
_4828539
:
P_0000001
P_0000001
SI NO. PAGE NO.
1.0 3
2.0 3
3.0 3
4.0 3
5.0 3-5
6.0 EQUIPMENT AND TOOLS 6
7.0 ENVIRONMENT, HEALTH AND SAFETY (EHS) 7
REFERENCE DOCUMENTS
WORK PROCEDURE
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
I N D E X
DESCRIPTION
PURPOSE
SCOPE
PRINCIPLE
AES‐VCM
8.0 8-10
9.0 10
RISK ASSESSMENT
ATTACHMENT
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon
AP P _4828539: P_0000001 P_0000001
0000001
20 2 05 6 5:37/EPC)Mong Duong II 건설사무소전기부/jinyong jeon
-
8/18/2019 MS for Lighting & Small Power Installation
3/17
AP
P
_4828539
:
P_0000001
P_0
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
AES‐VCM
1.0 PURPOSE
2.0 SCOPE
3.0 PRINCIPLE
All the concerning works’ procedure should follow this method statement.
4.0 REFERENCE DOCUMENTS
4.1 Issued For Construction Drawings.
4.2 Approved Contract Quality Plan
4.3 Project EHSS Management Plan
This document lays down the procedure to be followed in the installation of Lighting & Small
Power and its accessories.
This work procedure stipulates engineering standard,work process and techniques, and quality
management guidelines pertaining to the installation of Lighting & Small Power as well as
the accessories for Mong Duong 2 Coal Fired Power Plant Project.
5.0 WORK PROCEDURE
5.1 BEFORE INSTALLATION
5.1.1 Make sure that materials to be used for construction are always approved,
identified and properly preserved.
5.1.3 Only the authorized and qualified personnel are allowed to perform such
required works at site.
5.1.4 The latest Approved Construction Drawings shall be used.
5.1.5Lighting & Small Power Installation shall be confirmed with layout drawings
and proper coordination must be done for any obstruction
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon
AP P _4828539: P_0000001 P_0000001
01
P_0000001
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon
-
8/18/2019 MS for Lighting & Small Power Installation
4/17
AP
P
_4828539
:
P_000000
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
AES‐VCM
5.2.3 Careful handling of lighting fixtures and receptacles upon installation must be properlyimplemented to avoid damages.
5.2.4Installed lighting fixtures and receptacles shall be aligned and leveled properly. It must
be free of dirt or any chemical impurities.
5.2.5 Prior to installation, check lighting fixtures accessories and make sure internalconnection are completed.
5.2.6 Unless otherwise shown, mounting heights of lighting fixtures shall be generally asfollows:
A) I)Low bay lighting fixture in general indoors areas of industrial plants shall be
3500MM from bottom to finish.
II)Medium bay lighting fixture shall be 3500MM to less than 7000MM from
bottom to finished floor.
III)High bay lighting fixture shall be 7000MM and above from bottom tofinish floor.
B) Light over door openings shall be 300MM bottom of fixture above top of
opening.
C) In boiler galleries, the mounting heght of fixture will be 2500MM from
platform except as shown.
D) Receptacles:
I)In control room/office shall be 300MM from finish floor to center.
II)Elsewhere shall be 1000MM from finish floor to center.
E) Local Swicthes shall be 1500MM from finish floor to center.
F) Lighting Panels shall be 1800MM from finish floor to top.
5.2.7 Unless otherwise noted ,all the lighting fixture shall be fed from respective
lighting panels. Normal AC lighting panels will be fed from MLDB. Emergency
AC lighting panels will be fed from emergency MLDB.DC emergency lighting
distribution boards will be fed from Main DC distribution boards.
5.2.8 All outdoor lighting poles/towers shall be provided with MCB's at their base
while receiving incoming cable.
5.2.9 Separate conduit shall be used for wiring lighting circuit of different lighting
distribution such as Normal AC lighting/emergency DC lighting.
5.2.10 AC & DC shall not be run in the same conduit and jb.Circuit fed from different
transformer and different batteries (DC source) shall not be run through same
/ ) g g 설사무 기부/j y g j
AP P _4828539: P_0000001 P_0000001
_0000001
P_0000001
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon
-
8/18/2019 MS for Lighting & Small Power Installation
5/17
AP
P
_4828539
:
P_
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
AES‐VCM
5.2.12 For classified hazardous area having flammable gases and vapors only, all items
and accessories of illumination system shall be explosion proof.
The lighting and small power system will meet the requirements established in
NFPA 499 for the appropriate hazard classification.5.2.13 All outdoor lighting located in wet locations and small power circuits will use
ground-faults circuit interrupter (GFCI) protection for safety.
5.2.14 Elevation of lighting fixtures shall be in accordance with AFC.
5.2.15Installation of Aviation lighting shall be accessble from landing plarform. It shall
be installed as per AFC.
5.2.16 Correct rated voltage of power supply shall be check prior for energizing.
5.2.17 Continuity & Insulation resistance test for each circuit shall performed prior forenergizing. It must be recorded.
5.2.18 Illumination test shall be performed during energizing and must be recorded.
LIGHTING SUB-DISTRIBUTION BOARD/PANEL
5.2.19 Location of Sub-distribution board installation shall be as per AFC drawing.
However exact location may be vary as per site condition. As built plan if
necessary
5.2.20 It shall be mounted with appropriate support and aligned properly.
5.2.21 It shall be free of damages and missing accessories.
5.2.22 Circuit Breaker ratings and number of poles are as per AFC drawing.
5.2.23 Mounting height shall be in accordance with AFC drawing.
5.2.24 Sub-distribution board shall be properly grounded as per AFC drawing.
5.2.25 Installed Sub-distribution board shall have padlocking facility.
5.2.26 Installed Sub-distribution board shall be as per required degree of protection
per area (IP41 for indoor & IP55 for outdoor.
5.2.27 Upon completion of installation, field engineer in coordination with QA/QC
shall notify AES inspector to perform the required inspection in order to assure
that all requirements are met. All inspection and testing shall be in accordance
with inspedtion plan. AP P _4828539: P_0000001 P_0000001
39 :
P_0000001
P_000
0001
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon
-
8/18/2019 MS for Lighting & Small Power Installation
6/17
AP
P
_482853
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
AES‐VCM
6.0 EQUIPMENTS & TOOLS
6.1 Electric Hand Drill
6.3 Hand Crimping Tools
6.2 Electrical Hand Tools
6.2 Hand Cable Cutter
6.2 Adjustable Wrench
6.2 Pipe Vise
6.2 Ground Resistance Tester
6.2 Insulation Tester6.2 Digital Multimeter
6.2 Other electrical tools..
AP P _4828539: P_0000001 P_0000001
_4828539
:
P_0000001
P_00
00001
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeon
-
8/18/2019 MS for Lighting & Small Power Installation
7/17
AP
P
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
AES‐VCM
7.0 ENVIRONMENT, HEALTH AND SAFETY (EHS)
7.1 Responsibilities and Instructions
7.1.1 PM/EHSS Officer shall ensure that all work is undertaken in accordance with the
specified work scope.
7.1.2 Safety training should be conducted to all personnel assigned at site prior to
commence any work.
7.1.3 All personnel should know the locations of fire extinguishers, communications,
manual alarms & ESD points.
7.1.4 All personnel should be aware of assembly points, escape routes, emergency
contact numbers.
7.1.5 Personal Protective Equipment (PPE) shall be worn at all times.
7.1.6 Good housekeeping shall be observed in work areas.
7.1.7 Construction wastes shall be segregated and disposed to an approved dump
yard area.
7.1.8 Keep non-essential workers clear of machinery whilst it is in operation.
7.1.9Proper inspection of all equipments prior to use to avoid leakage and
equipment failure.
7.1.10 Permit to work shall be obtained appropriately for the type of work and
location.
7.1.11 All vehicles must comply and observed speed limit of 10km/h on site.
7.1.12 Excavation and delivery of materials are prohibited during heavy rains.
7.1.13 Adequate lighting equipments when working night time.
7.1.14Ensure all workers and equipments working overtime are properly accounted
and obtained permit/approval from Doosan EHS Manager prior to carry-on
works. Regular working time is from 6:30 am ~ 5:00 pm.
7.1.15 Periodic refresher trainings, tool box talk and audit shall be conducted.
7.2 Safety ( PPE )
7 2 1 _ 4 8 2 8 5 3 9 : _ 0 0 0 0 0 0 1 _ 0 0 0 0 0 0 18 5
3 9 :
_ 0 0 0 0 0 0 1
_ 0 0 0 0 0 0 1
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
8/17
_ 4 8 2 8
8.0 RISK ASSESSMENT (#1)
L S Risk L S Risk
3 6 C 2 4 D
2 4 D 1 2 E
3 8 B 2 4 C
A.1 Not properly equipped with
PPEInjury
C.6 Experienced lifting supervisor
at all times
Injury
C2 1 6
C.7 Only monthly checking color
attached lifting tools allowed to
use
A.2 Make the worker to take
enough rest
TASK/ JOB STEPS
C.1 Prepare a lifting plan for over
10 tons and submit PTW
B.1 Check the access road before
passing the areaInjury
B.2 Designate a signalman when
moving the equipment
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
BASE RISK
(WITHOUT CONTROL)
MITIGATING CONTROLS
RESIDUAL RISK
(WITH CONTROL)
A. Workers
8 B
A.1 Instructing to wear proper PPE
A.2 Worker abnormal physical
condition (drunken&fatigue)
C. Heavy lifting worksC. Crushing may cause fatal injury
or permanent disability
TYPE OF DAMAGELIST OF HAZARDS
B. Transportation of equipment &
delivery of materialsB. Crash/ traffic accident
C.2 Only a qualified and Certified
operators. Signalman should be in-
place
C.3 Do not stand beneath the
lifting areas
C.4 Ensure loads are fixed with
sling belt correctly
C.5 All lifting equipments must be
in good conditions
C.8 All lifting tools must haveidentification tag (including serial
number certification number SWL
AES‐VCM
3 6 B 2 4 CInjury
D.1.b Check the lifting
devices(slings, shackles, etc…) for
proper and safe use
D.1.e All lifting tools must have
identification tag (including serial
number,certification number, SWL
C.9 Provide safe emtramce amd
exit access road for the labors
passing
D. Unloading equipment and
materials
D.1.a Make sure the sling is
tied/binded/tightened correctly
D.1.d Only monthly checking color
attached lifting tools allowed to
use
D.1 Struck down by things and
materials
D.1.c Analyzing the load (wight,shape, lifting points, etc…) and the
liftinf device
, ,
inspection date and due date)
_ 4 8 2 8 5 3 9 : _ 0 0 0 0 0 0 1 _ 0 0 0 0 0 0 1
_ 4 8 2 8 5 3 9 :
_ 0 0 0 0 0 0 1
_ 0 0 0 0 0 0 1
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
9/17
_
8.0 RISK ASSESSMENT (#2)
L S Risk L S Risk
3 6 C 1 2 D
3 6 C 2 4 D
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
TASK/ JOB STEPS LIST OF HAZARDS TYPE OF DAMAGE
BASE RISK (WITHOUT CONTROL)
MITIGATING CONTROLS
RESIDUAL RISK
(WITH CONTROL)
2 8 B 1 4
E.1.d Checklist on all vehicles must
be provided everyday.
injury
E.1 Collision between machines.
Overturning may cause death or
permanent disability
F.1.a Must provide sufficient
lightnings on the entire working
area
E.2 Unnecessary movements of
equipments towards a person that
causes injury and damage to
materials
E.1.c Adequate warning signboards
C
E. Equipment and material
preparation for Temp. facilities
E.1.a Always keep the site clear of
any obstructions.E.1.b Tool-box talks on a daily
basis
E.2.a Provide a signalman who is
wearing reflective vest
E.2.c Equipment used to clear the
site should be controlled and soted
by a banksman
E.2.d Provide safe entrance and
exit for the workers going to the
area
E.2.b Heavy machinery should have
backward movement warning light
and beacon
injury
E.2.e All vehicles entering on the
site must turn-on their headlights
day and night time
F. Working opearation during
night time
E.3 Equipment oil leakage during
operationpollution
E.3.a Daily check of the
equipments prior to work
F.1.b All equipments must ensure
all lights are operational and notobscured by dirt or mud
F.1 Working operation of the
equipments may cause injury to
personnel due to poor visibility of
the area
AES‐VCM
2 6 CF.1.f Must use and connect 3 core
codes electric wire and separate
distribution pannel (must pass
arrangement of ELCB) and avoid
any water affect
B
Injury
. .c uperv sor mus aways e
present for the entire working
operation
F.1.d All workers must be wearing
reflective vest
F.1.g Provide safe entrance and
exit access road for the labors
passing
F.1.h All kinds of electric cable
must be hanged over ground
F.1.i Must use industrial socket and
plug
1 j l i bi h ld
F.1.e Ambulance car and
designated nurse must be on
stand-by for the entire working
operation
4 8
_ 4 8 2 8 5 3 9 : _ 0 0 0 0 0 0 1 _ 0 0 0 0 0 0 1
_ 4 8 2 8 5 3 9 :
_ 0 0 0 0 0 0 1
_ 0 0
0 0 0 0 1
20 2-05- 6 5:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
10/17
8.0 RISK ASSESSMENT (#3)
L S Risk L S Risk
2 8 B 1 6 C
METHOD STATEMENT FOR LIGHTING & SMALL POWER INSTALLATION
TASK/ JOB STEPS LIST OF HAZARDS TYPE OF DAMAGE
BASE RISK (WITHOUT CONTROL)
G.2 Generator(diesel) equipment
oil leakage during operation
Injury
Pollution
G. Welding and cutting works G.1 Electric shock, fire, burn to
body and injury to eye may causedeath or permanent disability
G.1.a Proper earthing and
connection of welding machinesand generators
G.1.b Fashback arrestor and gauge
should be installed prior to use
cutting cylinders
G.1.d Must use and connect 3 core
codes electric wire and separate
distribution pannel (must pass
arrangement of ELCB) and avoid
3 6
G.2.a Daily check of the
equipments prior to start of work
C 2 4
MITIGATING CONTROLS
RESIDUAL RISK
(WITH CONTROL)
D
G.2.b Regular monitoring of the
equipment in order to control and
prevent oil leakage and other
engine trouble
G.1.c Proper PPE to be worn at all
times
G.2.c Provide secondarycontainment protection under the
G.1.e All kinds of electric cablemust be hanged over ground
G.1.f Must use industrial socket
and plug
G.1.g Electric cabinet should not
affect any water
AES‐VCM
3 6 C 2 4 D
9.0
9.1
G.3 Oil/chemical storage
Job Safety Environment
Analysis (JSEA)
Attachment
Pollution
G.2.d If oil leakage, must remove
the oil and contaminated soil
immediately
G.3 Diesel/chemical shall be stored
in secondary containment and
MSDS requirements shall be
communicated with all concerned
contamination of the soil by oil
spillage
APCPCWM_4828539:WP_0000001WP_0000001
8 2 8 5 3 9 : W P_ 0 0 0 0 0 0 1 W P_ 0 0 0 0 0 0
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
11/17
A P C P C W M_ 4 8
Task : LIGHTING & SMALL POWER INSTALLATION
Prepared by : Reviewed by : Approved by :
Original Date : Revised by : Rev. Date: Revision : A
Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask
Yes Yes Yes Yes Tack Out No No
Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others
Yes No Yes Yes
Other Safety Equipment Required :
Remarks :
A. Workers A.1 Instructing to wear proper PPE
JOB SAFETY ENVIRONMENT ANALYSISAES-VCM
MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
A.1 Not properly equipped with PPE properly equipped with PPE
A.2 Make the worker to take enough rest
B. Crash/ traffic accident B.1 Check the access road before passing the area
C. Heavy Lifting Works
C.3 Do not stand beneath the lifting areas
C.4 Ensure loads are fixed with sling belt correctly
C.5 All lifting equipments must be in good conditions
C.6 Experienced lifting supervisor at all times
C.7 Only monthly checking color attached lifting tools allowed to use
A.2 Worker abnormal physical condition (drunken&fatigue)
B. Transportation of equipment & delivery of materials
B.2 Designate a signalman who wear the red suit and safety helmet and control
the work.
C. Crushing may cause fatal injury or permanent disability C.1 Preparation of a rigging lift list and plans for lifts of ten (10) tons or greater.
C.2 Only a qualified and Certified operators. Signalman should be in-place
Page 11
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001
M_ 4 8 2 8 5 3 9 : W P_ 0 0 0 0 0 0 1 W P_ 0 0
0 0 0 0
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
12/17
A P C P C W M
Task : LIGHTING & SMALL POWER INSTALLATION
Prepared by : Reviewed by : Approved by :
Original Date : Revised by : Rev. Date: Revision : A
Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask
Yes Yes Yes Yes Tack Out No No
Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others
Yes No Yes Yes
Other Safety Equipment Required :
Remarks :
JOB SAFETY ENVIRONMENT ANALYSISAES-VCM
MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
C.8 All lifting tools must have identification tag (including serial number,
certification number, SWL inspection date and due date)
D.1 Struck down by things and materials
D.1.b Check the lifting devices(slings, shackles, etc…) for proper and safe use
D.1.c Analyzing the load (wight, shape, lifting points, etc…) and the lifting device
D.1.d Only monthly checking color attached lifting tools allowed to use
D.1.e All lifting tools must have identification tag (including serial number,
certification number, SWL inspection date and due date)
D.1.f Provide safe emtramce amd exit access road for the labors passing
C.9 Provide safe emtramce amd exit access road for the labors passing
D. Unloading Equipment and Materials D.1.a Make sure the sling is tied/binded/tightened correctly
Page 12
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001
W M_ 4 8 2 8 5 3 9 : W P_ 0 0 0 0 0 0 1 W P_ 0 0 0 0 0 0
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
13/17
A P C P C W
Task : LIGHTING & SMALL POWER INSTALLATION
Prepared by : Reviewed by : Approved by :
Original Date : Revised by : Rev. Date: Revision : A
Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask
Yes Yes Yes Yes Tack Out No No
Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others
Yes No Yes Yes
Other Safety Equipment Required :
Remarks :
JOB SAFETY ENVIRONMENT ANALYSISAES-VCM
MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
D.2 Squeezed by the sling D.2.a Use hand gloves when tightning the slings
D.2.b Tightnig the slings before carrying-out lifting
D.3 Squeezed by the materials
D.4 Crane fall accidentally
E.1.a Always keep the site clear of any obstructions.
E.1.b Tool-box talks on a daily basisE.1.c Adequate warning signboards
E.2 Unnecessary movements of equipments towards a person that causes injury
and damage to materials
E.2.a Designate a signalman who wear the red suit and safety helmet and control
the work
E.2.b Heavy machinery should have backward light and beacon movement
warning
D.3.a Use wooden bar sa support of the materials on the ground
D.4.a Analyzing the loads (weight, shape, lifting points, etc…) and lifting device
to suit the crane capacity
E. Equipment and material preparation for Temp. facilities E.1 Collision between machines. Overturning may cause death or permanent
disability
E.1.d Checklist on all vehicles must be provided everyday.
Page 13
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001
C P C W M_ 4 8 2 8 5 3 9 : W P_ 0 0 0 0 0 0 1 W P_ 0
0 0 0 0 0
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
14/17
A P C
Task : LIGHTING & SMALL POWER INSTALLATION
Prepared by : Reviewed by : Approved by :
Original Date : Revised by : Rev. Date: Revision : A
Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask
Yes Yes Yes Yes Tack Out No No
Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others
Yes No Yes Yes
Other Safety Equipment Required :
Remarks :
JOB SAFETY ENVIRONMENT ANALYSISAES-VCM
MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
E.2.c Equipment used to clear the site should be controlled and soted by a
banksman
E.3 Equipment oil leakage during operation E.3.a Daily check of the equipments prior to work
F.1.c Supervisor must always be present for the entire working
F.1.d All workers must be wearing proper PPE
F.1.e Ambulance car and designated nurse must be on stand-by for the entire
working operation
E.2.e All vehicles entering on the site must turn-on their headlights day and night
time
F. Working Operation During Night Time. F.1 Working operation of the equipments may cause injury to personnel due to
poor visibility of the area.
F.1.a Must provide sufficient lightnings on the entire working area
F.1.b All equipments must ensure all lights are operational and not
E.2.d Provide safe entrance and exit for the workers going to the area
Page 14
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001
A P C P C W M_ 4 8 2 8 5 3 9 : W P_ 0 0 0 0 0 0 1 W P_ 0 0 0 0 0 0
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
15/17
A
Task : LIGHTING & SMALL POWER INSTALLATION
Prepared by : Reviewed by : Approved by :
Original Date : Revised by : Rev. Date: Revision : A
Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask
Yes Yes Yes Yes Tack Out No No
Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others
Yes No Yes Yes
Other Safety Equipment Required :
Remarks :
JOB SAFETY ENVIRONMENT ANALYSISAES-VCM
MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
F.1.f Must use and connect 3 core codes electric wire and separate any water
affect
F.2 Generator (Diesel) equipment oil leakage
F.3 Oil chemical storage
F.2.c Provide secondary containment protection under the equipment to prevent
contamination of soil by oil spillage
F.3. Diesel/chemical shall be stored in secondary containment & MSDS
F.1.h All kinds of electric cable must be hanged over ground
F.1.i Must use industrial socket and plug
F.1.j Electric cabinet should not affect any water
F.2.a Daily check of the equipment prior to start of work
F.2.b Regular check & monitoring of the equipment prior to use
F.1.g Provide safe entrance and exit access road for the labors passing
Page 15
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001
A P C P C W M_ 4 8 2 8 5 3 9 : W P_ 0 0 0 0 0 0 1 W P_
0 0 0 0 0 0
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
16/17
Task : LIGHTING & SMALL POWER INSTALLATION
Prepared by : Reviewed by : Approved by :
Original Date : Revised by : Rev. Date: Revision : A
Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask
Yes Yes Yes Yes Tack Out No No
Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others
Yes No Yes Yes
Other Safety Equipment Required :
Remarks :
JOB SAFETY ENVIRONMENT ANALYSISAES-VCM
MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
G. Welding and cutting works G.1.b Fashback arrestor and gauge should be installed prior to use cutting
cylinders
G.1 Electeric shock, fire burn to body and injury to eye may cause death or
permanent disability.
G.1.e All kinds of electric cable must be hanged over ground
G.1.f Must use industrial socket and plug
G.1.g Electric cabinet should not affect any water
G.2 Generator(diesel) equipment oil leakage during operation G.2.a Daily check of the equipments prior to start of work
G.2.b Regular monitoring of the equipment in order to control and prevent oil
leakage and other engine trouble
G.2.c Provide secondary containment protection under the equipment to prevent
contamination of the soil by oil spillage
G.1.c Proper PPE to be worn at all times
G.1.d Must use and connect 3 core codes electric wire and separate distribution
pannel (must pass arrangement of ELCB) and avoid any water affect
Page 16
Copyright by DOOSAN Heavy Industries and Construction. Co.,Ltd. 두산중공업 All Rights Reserved. APCPCWM_4828539:WP_0000001WP_0000001
A P C P C W M_ 4 8 2 8 5 3 9 : W P_ 0 0 0 0 0 0 1 W P_ 0 0 0 0 0 0
2012-05-16 15:37/EPC)Mong Duong II 건설사무소 전기부/jinyong.jeong/정진용
-
8/18/2019 MS for Lighting & Small Power Installation
17/17
Task : LIGHTING & SMALL POWER INSTALLATION
Prepared by : Reviewed by : Approved by :
Original Date : Revised by : Rev. Date: Revision : A
Googles Gloves Face Shield Barricade Needed Lock Out No Dust Mask
Yes Yes Yes Yes Tack Out No No
Safety Harness Long Sleeves Hearing Protection MSDS Needed/Review (Y/N) Group Fault Interrupter Others
Yes No Yes Yes
Other Safety Equipment Required :
Remarks :
JOB SAFETY ENVIRONMENT ANALYSISAES-VCM
MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that control,
minimize or eliminating hazards.
List of All Job Steps List of All Known Hazards How to Eliminate Hazards
G.2.d If oil leakage, must remove the oil and contaminated soil
G.3 Oil/chemical storage G.3 Diesel/chemical shall be stored in secondary containment and MSDSrequirements shall be communicated with all concerned
Page 17