Transcript of Mr. Carl Cartwright Executive Director for Field Support AMSAS-FS.
Mr. Carl CartwrightExecutive Director for Field Support
AMSAS-FS
MultiplePOCs
CTCFleets
Materiel Enterprise Materiel Enterprise DOL SynergyDOL Synergy
Key Actions
Imperatives
• Seamless Support to SCs
• DOL as Conduit to Transform ASC
• Integrate & Control Field Level Maintenance / Supply Capability
• Decentralized Execution under AFSB / AFSBn C2
• Optimize Maintenance Capacity and Capabilities (Flexibility to Move Overflow / Workload to DOLs /Depots/Arsenals/OEMs)
• Standardized PWS / Processes / Metrics
• Build Augmentation Capability thru Contract Vehicle
CONUS DOL Assessments Continue Transition FLRC T.O.s to DOLs Engage USAGs (DFACs) / SDDC (JPPSO) / LCMCs (Reach Back) OPCON of DOL Region Chiefs ROC Drill (Aug) Establish DOL Centers of Excellence OPCON OCONUS Sources of Repair OCONUS Assessments C2 of OCONUS Sources of Repair
AMC
IMCOM
FORSCOM
Way Ahead
Numerous Contracts / PWS
DOLs
FLRCs
TRADOCFMX
AMC
Core CompetenciesAlignedin the
Materiel Enterprise
Single Source of Repair on an Installation
StandardizedAcquisition
Strategy
Single POCon an
Installation
CURRENT FUTURE
MultipleMaintenance
Systems
Installation Logistics Linked
to AMC
Include in CMO
Business
Transformation
Plan
Congressional
Notification
thru OCLL
EAGLE Industry Day (18 May) OPCON of Select DOL f(x)s (1 Jun STRATCOMs to SCs Initiated OPCON of all DOL f(x)s (1 Oct ) Establish Single Source of Repair on an Installation / Absorb FLRCs into DOLs Standardized Acquisition Strategy CONUS C2 / Resource Transfer (FY 12) STRATCOMs Road Show UNCLASSIFIED
5 YR Projection
Mitigating Strategy
Problem Statement:• Steady State Base OPS, Reset and LBE workload will
exceed 60 day one-shift capacity by 4th Qtr FY11. Maintaining one-shift will create an estimated backlog of 420K man-hours by end of 4th Qtr FY15.
• Extend shifts starting in 4th QTR FY11• Execute FY12 MCA Project 68305, $XX.M, TEMF (Funded)• Identify and transfer workload to alternate Sources of
Repair• Manage Reset/LBE maintenance cycles to maximize
existing capacity/facilities
• Operating extended shifts will provide sufficient capability in 20 out of 24 quarters thru FY15
• Completing the Tactical Equipment Maintenance Facility (TEMF/large) programmed in FY12 and operating both facilities on an extended shift basis will mitigate capacity shortfalls thru FY15.
FY 11 Projection
FY 12 Projection
FSTX DOL Work Loading Capacity
No Capacity concerns
until 4Q FY11
G
Fort Swampy, Texas
= Capability and Capacity Minor Concern
= Capability and Capacity Major Concern
Units in LBE Draw / Turn in Units in RESET
X/XX X/XXX/XX X/XXX/XX
Total Projected RESET Workload MH 74775Total Projected LBE Workload MH 189198Avg. Backlog MH Pass-Back & Install. Sup 5170
Backlog MH 43020
Available MH 34953DA STD Direct Labor Utilization 29710
Est. MH Closed 2862173447
63066126132
1298
2010 2011
Units in LBE
Draw / Turn in
Units in RESET
XX/XX XX/XX
XX/XX
XX/XX
Total Projected RESET Workload MH 47612Total Projected LBE Workload MH 11352Avg. Backlog MH Pass-Back & Install. Sup 5851
Backlog MH 40383
Available MH 34953DA STD Direct Labor Utilization 29710
Est. MH Closed 28621 2010 2011
11352
31768 15844
UNCLASSIFIED
Examples of RequirementsExamples of RequirementsDirect Theater Support:
IZ Ends o/a 31 Dec 11, no scheduled re-award
KU Transition to EAGLE, NET* 1 QTR/FY13
AF Transition to EAGLE, NET 1 QTR/FY13
Property Accountability:
LBE GPMSS ILSS EAGLE NET 1QTR/FY 13
PDTE GPMSS ILSS EAGLE NET1QTR/FY13
TPE GPMSS ILSS EAGLE NET1QTR/FY13
Army Pre-Positioned Stocks (APS):
Charleston EAGLE, NET 2/QTR FY14
Korea EAGLE, NET 2/QTR FY13
Qatar In re-compete
FLRC :
FCKY/LBG FIRST EAGLE, NET 4/QTR/FY12
DOLs:
FSGA EAGLE, NET 2/QTR FY12
* NET = Not Earlier Than
*NET = Not Earlier Than
Re-compete
Re-compete
Re-compete
Base 1 / 4 OY
Base 1 / 4 OY
Base 1 / 2 OY
Base 1 / 2 OY
Base 1 / 2 OY
Base 1 / 4 OY
Base 1 / 4 OY
Base 1 / 4 OY
Base 1 / 4 OY
UNCLASSIFIED
55