The aim The aim of this project is to create a tool that could

provide an offer based on diferent configurators for mobile stations and after that you could export it in xls format.

This will be done in order to simplify the work for creating the diferent configurations for mobile stations

The tool will be used by telecom engineers

Page 3: Mps project

Resources

The team will contain only 4 members, but they will work together at all the tasks and subtasks for analyses, design, develop and testing as well.

The team leader is Daniel.

Page 4: Mps project

Constraint

The project have to be done until 22.04.2011, according with the specifications provided by the CC team (competence center).

This date is an approximation of the date of finishing of the project. This date could be overcome in special conditions, discussed with CC team.

Page 5: Mps project

Project phases

Analysis software requirements

Design

Development

Testing

Deployment

Page 6: Mps project

Analysis software requirementsphase

Page 7: Mps project

Design phase

Page 8: Mps project

Development phase

Page 9: Mps project

Testing phase

Page 10: Mps project

Deployment phase

Page 11: Mps project

Task usage

Page 12: Mps project

Conclusions

There are tasks that are done in parallel

Give you an overview of the whole project

The tasks of all the members of the team is planned better

A finish date of the project could be approximated