SULTANATE OF OMAN

MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT

MUSCAT

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012

MONTHLY PROGRESS REPORT NO. 5

MAY 2014

CONSULTANT:

RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman

CONTRACTOR:

CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman

Page 2: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 1

Table of Contents

S. No. Description Page No.

1. Project Particulars 2

2. Scope of Work 3

3. Typical Cross Sections 4

4. Site visits/ Meetings 6

5 Engineer’s Site Staff 7

6. Progress Review 8

7. Financial Status 16

8. Contractor’s Resources 17

9. QA/ QC Reports 22

10. Engineer’s Comments 28

11. Project Correspondence 29

12. Progress Photographs 33

Page 3: MPR for May 2014
Page 4: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 2

Project Particulars

Client: Ministry of Transport &

Communications

P.O. Box 684, Muscat, Postal Code 113

Directorate General of Roads

Sultanate of Oman.

Consultant: Renardet S.A & Partners L.L.C.

P.O. Box 579, Muscat, Postal Code 100

Sultanate of Oman.

Contractor: Consolidated Contractors Company

L.L.C.

P.O. Box 614, Muscat, Postal Code 100

Sultanate of Oman.

Project Commencement Date: 30.10.2013

Mobilization Period: 60 Days

Construction Period: 548 Days

Completion date: 29.06.2015

Original Contract Value:

(Including Contingencies) R.O. 17,884,403.000

Amount of Contingencies: R.O. 1,402,155.613

Original Contract Value:

(Excluding Contingencies) R.O. 16,482,247.387

Planned physical progress

cumulative up to end of May 2014

23.21 %

Achieved physical progress

cumulative up to end of May 2014 10.66 %

Page 5: MPR for May 2014
Page 6: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 3

Scope of Work

This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and

consists of construction of an interchange in place of existing roundabout along with allied works.

Total length of the project along Batinah highway is about 4.0 km which shall be converted from four

lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of

work is the construction of service roads, pedestrian underpasses.

The work also includes expropriation of properties, relocation/protection of services (sewerage,

telephone, electricity, water, irrigation) road lighting works and traffic signals.

Major items within the scope of work consist of but not limited to the following:

Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve

the designed profile and gradient.

Removal of existing drainage structures and construction of new ones including protection works

as shown on construction drawings and as directed.

Expropriation of open/built up properties and removal of existing structures thereupon.

Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and

service roads.

Provision of new street lighting system/traffic signals and removal/disposal of existing street light

poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the

proper completion of the job.

Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base

course and bituminous wearing course as per details on the construction drawings.

Installation of road side furniture (traffic signs, road marking etc.) and protection works on

embankment slopes.

Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items

(transformers etc.) as per the requirements of concerned authority.

Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and

irrigation) as per the requirements of concerned authorities.

Provision of ducts for future utilities as per the requirements of utility operator.

Construction of concrete safety barriers, fixing of guard rails and paving tiles.

Provision of traffic diversion in coordination with concerned authorities.

Page 7: MPR for May 2014
Page 8: MPR for May 2014
Page 9: MPR for May 2014
Page 10: MPR for May 2014
Page 11: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 6

Site visits/ Meetings

S. No. Details of Site Visit Date Final Outcome/ Decisions

1 ROP Traffic Dept. visited the site in

the night and inspected the Traffic

Diversion arrangements in Detours.

02.05.2014 Traffic Diverted on the newly

constructed Detours successfully.

2 Eng. Waleed from DGR visited the

Project site and detours.

07.05.2014 Inspected the locations of access

location for Oman Oil and Shell

Filling Stations and informed about a

meeting to be attended at HE

Governor’s Office.

3 Meeting with HE Governer regarding

the access for Shell and Oman Oil

Filling Stations

08.05.2014 Decided to provide an additional lane

to provide access to the filling

stations.

4 Meeting with Eng. Salem Al Makbari,

in Sohar Municipality regarding the

drainage issues of the project region.

15.05.2014 Mr. Salem will write a letter to DGR

seeking clarification of hydraulic

design of the culverts provided in the

project.

5 Site visit of Wadi Al Zizi road along

with Col. Mohd. Rashid Al Shibli and

other companies

19.05.2014 ROP requested to take up the

rehabilitation of Existing Overpass

Bridge, Service Road adjacent to

Wadi and Irish Crossing across wadi.

6 Meeting with Eng. Fares Jawad at

Project Office.

21.05.2014 Discussed the following points:

Requirements at Wadi Al Zizi

Drainage layout of Bridge

Land Appropriation

Consultant’s Quantity Surveyor

Contractor’s proposal to

provide ABC Class B

Page 12: MPR for May 2014
Page 13: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 7

Engineer’s Site Staff

1. Roberto Benigni Head Supervision Projects

2. Muneer Abdul Resident Engineer

3. Hussein Shah Material Engineer

4. Ernesto B. Paredes Bridge Engineer

5. Sande H Tangaras Civil Engineer

6. Mohamed Safie Land Surveyor

7. Aseef Iqbal Site Inspector

8. Alaa Aldin Abdelfatah Site Inspector

9. Walid Samy Abdoh Mostafa Material Inspector

10. Haneefa Mohmmed Al Zadjali Secretary

Page 14: MPR for May 2014
Page 15: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 8

REV

.:0

PER

IOD

EN

DIN

G:

May-1

4

2013

De

cJan

Fe

bM

ar

Ap

rM

ay

Ju

nJu

lA

ug

Se

pO

ct

No

vD

ec

Jan

Fe

bM

ar

Ap

rM

ay

Ju

n

CL

14 P

lan

%0.3

0

8.6

7

19.2

3

26.8

9

31.7

7

36.6

4

41.5

1

46.3

9

51.2

6

56.1

3

61.0

1

65.8

8

70.7

6

75.6

3

80.5

0

85.3

8

90.2

5

95.1

3

100.0

0

Actu

al

-

6.6

2

13.0

3

22.3

6

37.3

1

43.0

0

CL

14 P

lan

%0.0

00.0

00.3

820.3

747.7

048.3

348.3

348.3

348.3

348.3

348.3

348.3

348.3

359.9

177.8

490.2

794.9

3100.0

0100.0

0

Actu

al

-

10.0

9

10.0

9

17.5

9

19.5

2

70.5

5

CL

14 P

lan

%0.0

00.0

00.0

00.7

86.5

816.7

629.3

841.3

758.6

466.6

074.1

882.8

584.7

584.7

585.2

492.3

492.3

498.3

6100.0

0

Actu

al

-

-

-

-

4.3

5

-

CL

14 P

lan

%0.0

00.0

01.0

19.2

129.3

045.9

156.9

062.2

464.5

967.9

469.0

869.0

875.0

582.8

593.4

898.6

4100.0

0100.0

0100.0

0

Actu

al

-

-

-

5.0

0

5.0

0

36.2

4

CL

14 P

lan

%0.0

00.0

00.0

00.0

00.0

00.0

00.0

00.0

011.0

726.2

741.9

859.9

878.7

379.9

079.9

085.2

089.4

592.6

0100.0

0

Actu

al

-

-

-

-

CL

14 P

lan

%0.0

00.0

00.0

00.0

00.0

00.0

00.0

00.0

00.0

00.0

87.7

719.3

231.2

244.9

451.9

852.1

490.1

490.1

4100.0

0

Actu

al

-

-

-

-

CL

14 P

lan

%0.0

00.0

00.2

31.4

32.9

710.1

723.6

536.5

151.4

763.0

674.2

675.9

777.3

780.0

582.4

088.9

792.1

398.5

5100.0

0

Actu

al

-

-

-

0.4

8

1.2

6

5.5

9

CL

14 P

lan

%0.0

00.0

04.0

215.2

134.6

257.8

969.2

681.4

083.3

883.4

684.5

092.8

999.9

6100.0

0100.0

0100.0

0100.0

0100.0

0100.0

0

Actu

al

-

-

-

0.0

1

6.0

5

14.7

3

CL

14 P

lan

%0.0

00.0

00.0

00.0

00.0

00.3

81.2

12.6

33.4

24.2

35.5

06.0

86.0

834.3

599.3

899.7

699.7

6100.0

0100.0

0

Actu

al

-

-

-

2.5

0

14.3

9

14.3

9

CL

14 P

lan

%0.0

00.0

00.0

00.0

00.0

00.0

00.0

02.8

017.8

743.8

561.5

972.9

881.1

583.9

484.4

285.3

592.8

696.3

9100.0

0

Actu

al

-

-

-

-

-

2.6

1

CL

14 P

lan

%0.0

00.0

00.0

04.4

317.2

333.3

649.1

365.0

780.7

993.8

2100.0

0100.0

0100.0

0100.0

0100.0

0100.0

0100.0

0100.0

0100.0

0

Actu

al

0.0

0-

0.0

06.1

6

9.8

717.6

3

CL

14 P

lan

%0.0

00.0

00.0

00.0

00.0

00.1

70.7

91.4

35.6

513.4

121.8

430.5

632.9

470.9

475.0

494.0

296.4

3100.0

0100.0

0

Actu

al

-

-

-

0.1

3

5.5

2

9.2

6

CL

14 P

lan

0.0

1

0.2

6

1.6

7

5.9

1

13.1

5

23.2

1

32.6

4

42.3

7

52.5

8

62.3

7

70.8

6

76.5

9

81.1

3

84.6

9

87.4

8

91.3

1

94.8

6

98.3

3

100.0

0

Actu

al C

um

-

0.4

0

0.5

9

1.6

7

4.6

3

10.6

6

-

-

-

-

-

-

-

-

-

-

-

-

-

2013

De

cJan

Fe

bM

ar

Ap

rM

ay

Ju

nJu

lA

ug

Se

pO

ct

No

vD

ec

Jan

Fe

bM

ar

Ap

rM

ay

Ju

n

0.0

1

0.2

5

1.4

2

4.2

3

7.2

5

10.0

6

9.4

2

9.7

3

10.2

1

9.7

9

8.4

9

5.7

2

4.5

5

3.5

6

2.7

9

3.8

3

3.5

5

3.4

7

1.6

7

-

0.4

0

0.1

9

1.0

8

2.9

5

6.0

4

0.0

1

0.2

6

1.6

7

5.9

1

13.1

5

23.2

1

32.6

4

42.3

7

52.5

8

62.3

7

70.8

6

76.5

9

81.1

3

84.6

9

87.4

8

91.3

1

94.8

6

98.3

3

100.0

0

-

0.4

0

0.5

9

1.6

7

4.6

3

10.6

6

CU

MU

LA

TIV

E P

RO

GR

ES

SC

L14 O

rg P

lan

Cu

mu

lati

ve

%

Actu

al C

um

ula

tive

MM

EP

Wo

rks

&

Du

cts

52,6

46

2.4

9

TO

TA

L2,1

10,7

44

100.0

00

2014

2015

MO

NT

HL

Y P

RO

GR

ES

SC

L14 O

rg P

lan

pe

r M

on

th %

Actu

al p

er

Mo

nth

JD

rain

ag

e W

ork

s31,7

94

1.5

1

KIn

cid

en

tal

Co

ns

tru

cti

on

295,8

66

14.0

2

LM

SE

wa

lls

133,1

08

6.3

1

H

Co

nc

rete

fo

r

Bo

x C

ulv

ert

/Un

de

rpa

s

776,8

07

36.8

0

IC

on

cre

te f

or

Bri

dg

e24.9

2526,0

91

FS

ub

ba

se

&

Ag

gre

ga

te B

as

e2.8

459,8

58

GB

itu

min

ou

s

Pa

ve

me

nt

2.3

649,9

08

DE

mb

an

km

en

t62,3

20

2.9

5

ES

tru

ctu

ral

Ex

ca

va

tio

n16,2

25

0.7

7

BR

oa

d D

ive

rsio

ns

62,7

24

2.9

7

C

Cle

ari

ng

&

Re

mo

va

l o

f

Ob

str

uc

tio

ns

2.0

643,3

97

UP

GR

AD

ING

OF

FA

LA

J A

L Q

AB

AIL

RO

UN

DA

BO

UT

- O

MA

N

MA

NH

OU

RS

OV

ER

AL

L P

RO

JE

CT

S-C

UR

VE

Ite

mD

es

cri

pti

on

Bu

dg

et

Man

-Hrs

Wtd

.

%

Pla

n/

Actu

al

2014

2015

Page 16: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 9

2013

De

cJan

Fe

bM

ar

Ap

rM

ay

Ju

nJu

lA

ug

Se

pO

ct

No

vD

ec

Jan

Fe

bM

ar

Ap

rM

ay

Ju

n

0.0

1

0.2

5

1.4

2

4.2

3

7.2

5

10.0

6

9.4

2

9.7

3

10.2

1

9.7

9

8.4

9

5.7

2

4.5

5

3.5

6

2.7

9

3.8

3

3.5

5

3.4

7

1.6

7

-

0.4

0

0.1

9

1.0

8

2.9

5

6.0

4

-

-

-

-

-

-

-

-

-

-

-

-

-

0.0

10.2

61.6

75.9

113.1

523.2

132.6

442.3

752.5

862.3

770.8

676.5

981.1

384.6

987.4

891.3

194.8

698.3

3100.0

0

-

0.4

0

0.5

9

1.6

7

4.6

3

10.6

6

CU

MU

LA

TIV

E P

RO

GR

ES

SC

L14 O

rg P

lan

Cu

mu

lati

ve

%

Actu

al C

um

ula

tive

2014

2015

MO

NT

HL

Y P

RO

GR

ES

SC

L14 O

rg P

lan

pe

r M

on

th %

Actu

al p

er

Mo

nth

0.0

0

20

.00

40

.00

60

.00

80

.00

10

0.0

0

12

0.0

0

- 2 4 6 8

10

12

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

20

13

20

14

20

15

% Cumulative

% MONTHLY

MO

NT

HS

UP

GR

AD

ING

OF

FA

LA

J A

L Q

AB

AIL

RO

UN

DA

BO

UT

PR

OJ

EC

T -

OM

AN

MO

NT

HLY

CL

14

PL

AN

NE

D V

S. A

CT

UA

L M

AN

HO

UR

S

CL

14

Org

Pla

n p

er

Mo

nth

%A

ctu

al p

er

Mo

nth

CL

14

Org

Pla

n C

um

ula

tive %

Actu

al C

um

ula

tiv

e

Page 17: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 10

Progress of Permanent Works

Page 18: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 11

PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE

as of 31 MAY 2014

LOCATION PILE NO. CASTING

SEQUENCE SETTING

OUT

BORING, REBARS, & CONCRETE

INTEGRITY TEST

LOAD TEST

- EP 01 3 26/3/2014 26/3/2014 - 7-8/5/2014

- EP 02 2 25/3/2014 25/3/2014 - 16-17/4/2014

- EP 03 1 25/3/2014 25/3/2014 - 5-6/4/2014

- EP 04 4 26/3/2014 26/3/2014 - 13-14/5/2014

P3R 85 1 04-07-2014 04-08-2014 23/4/2014 -

P3R 87 2 04-07-2014 04-08-2014 23/4/2014 -

P3R 83 3 04-08-2014 04-09-2014 23/4/2014 -

P3R 81 4 04-08-2014 04-09-2014 23/4/2014 -

P3R 79 5 04-08-2014 04-09-2014 23/4/2014 -

P1R 63 6 04-09-2014 04-10-2014 28/4/2014 -

P1R 65 7 04-09-2014 04-10-2014 28/4/2014 -

P3R 86 8 04-10-2014 04-12-2014 23/4/2014 -

P3R 84 9 04-10-2014 04-12-2014 23/4/2014 -

P3R 82 10 04-10-2014 04-12-2014 23/4/2014 -

P1R 68 11 04-12-2014 13/4/2014 28/4/2014 -

P1R 66 12 04-12-2014 13/4/2014 28/4/2014 -

P1R 61 13 04-09-2014 13/4/2014 28/4/2014 -

P3R 80 14 13/4/2014 14/4/2014 23/4/2014 -

P3L 28 15 13/4/2014 14/4/2014 28/4/2014 -

P1R 62 16 04-12-2014 15/4/2014 28/4/2014 -

P1R 67 17 14/4/2014 15/4/2014 28/4/2014 -

P1R 69 18 14/4/2014 15/4/2014 28/4/2014 -

P3L 26 19 15/4/2014 16/4/2014 28/4/2014 -

P3L 30 20 15/4/2014 16/4/2014 28/4/2014 -

P3L 32 21 15/4/2014 16/4/2014 28/4/2014 -

P1R 64 22 16/4/2014 17/4/2014 28/4/2014 -

P1L 6 WP 23 16/4/2014 17/4/2014 05-11-2014 30/4/2014 to

1/5/2014

P1L 14 24 16/4/2014 17/4/2014 05-11-2014 -

P3L 25 25 17/4/2014 20/4/2014 28/4/2014 -

P3L 27 26 17/4/2014 20/4/2014 28/4/2014 -

P3L 29 27 17/4/2014 20/4/2014 28/4/2014 -

P2R 78 28 19/4/2014 21/4/2014 05-11-2014 -

P2R 76 29 19/4/2014 21/4/2014 05-11-2014 -

P2R 74 30 19/4/2014 21/4/2014 05-11-2014 -

P2L 23 WP 31 21/4/2014 22/4/2014 - -

P3L 24 32 21/4/2014 22/4/2014 28/4/2014 -

P3L 31 33 20/4/2014 22/4/2014 28/4/2014 -

P1L 8 34 22/4/2014 23/4/2014 05-11-2014 -

P1L 10 35 22/4/2014 23/4/2014 05-11-2014 -

P1L 12 36 22/4/2014 23/4/2014 05-11-2014 -

P2L 17 37 23/4/2014 24/4/2014 - -

P2L 18 38 23/4/2014 24/4/2014 - -

P2L 22 39 23/4/2014 24/4/2014 - -

P1L 7 40 24/4/2014 26/4/2014 05-11-2014 -

Page 19: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 12

PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE

as of 31 MAY 2014

LOCATION PILE NO. CASTING

SEQUENCE SETTING

OUT

BORING, REBARS, & CONCRETE

INTEGRITY TEST

LOAD TEST

P1L 9 41 24/4/2014 26/4/2014 05-11-2014 -

P1L 13 42 24/4/2014 26/4/2014 05-11-2014 -

P1L 11 43 26/4/2014 27/4/2014 05-11-2014 -

P2L 16 44 26/4/2014 27/4/2014 - -

P2L 15 49 28/4/2014 29/4/2014 - -

P2L 20 50 27/4/2014 29/4/2014 - -

P2R 70 51 28/4/2014 29/4/2014 05-11-2014 -

P2R 71 52 29/4/2014 30/4/2014 05-11-2014 -

P2R 73 53 29/4/2014 30/4/2014 05-11-2014 -

P2R 75 54 29/4/2014 30/4/2014 05-11-2014 -

P5R 105 55 05-04-2014 05-05-2014 18/5/2014 -

P5R 104 56 05-04-2014 05-05-2014 18/5/2014 -

P5R 103 57 05-04-2014 05-05-2014 18/5/2014 -

P5R 102 58 05-05-2014 05-06-2014 18/5/2014 -

P5R 101 59 05-05-2014 05-06-2014 18/5/2014 -

P5R 100 60 05-05-2014 05-06-2014 18/5/2014 -

P5R 97 61 05-06-2014 05-07-2014 18/5/2014 -

P5R 98 62 05-06-2014 05-07-2014 18/5/2014 -

P5R 99 63 05-06-2014 05-07-2014 18/5/2014 -

P5L 48 WP 64 05-07-2014 05-08-2014 - 24/5/2014 to

25/5/2014

P5L 49 65 05-07-2014 05-08-2014 - -

P5L 50 66 05-07-2014 05-08-2014 - -

P5L 42 67 05-10-2014 05-11-2014 - -

P5L 44 68 05-10-2014 05-11-2014 - -

P5L 46 69 05-10-2014 05-11-2014 - -

P5L 43 70 05-10-2014 05-12-2014 - -

P5L 45 71 05-10-2014 05-12-2014 - -

P5L 47 72 05-10-2014 05-12-2014 - -

AB1 R 56 73 05-12-2014 13/5/2014 21/5/2014 -

AB1 R 58 74 05-12-2014 13/5/2014 21/5/2014 -

AB1 R 60 75 05-12-2014 13/5/2014 21/5/2014 -

AB1 L 1 76 14/5/2014 15/5/2014 21/5/2014 -

AB1 L 3 77 14/5/2014 15/5/2014 21/5/2014 -

AB1 L 5 78 14/5/2014 15/5/2014 21/5/2014 -

AB1 R 57 79 13/6/2014 14/6/2014 21/5/2014 -

AB1 R 59 80 13/6/2014 14/6/2014 21/5/2014 -

AB1 L 2 81 15/5/2014 17/5/2014 21/5/2014 -

AB1 L 4 82 15/5/2014 17/5/2014 21/5/2014 -

AB2 L 51 83 19/5/2014 20/5/2014 - -

AB2 L 53 84 19/5/2014 20/5/2014 - -

AB2 L 55 85 19/5/2014 20/5/2014 - -

AB2 R 106 86 19/5/2014 20/5/2014 - -

AB2 L 54 87 20/5/2014 21/5/2014 - -

AB2 R 108 88 20/5/2014 21/5/2014 - -

AB2 R 110 89 20/5/2014 21/5/2014 - -

Page 20: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 13

PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE

as of 31 MAY 2014

LOCATION PILE NO. CASTING

SEQUENCE SETTING

OUT

BORING, REBARS, & CONCRETE

INTEGRITY TEST

LOAD TEST

AB2 L 52 90 21/5/2014 22/5/2014 - -

AB2 R 107 91 21/5/2014 22/5/2014 - -

AB2 R 109 92 21/5/2014 22/5/2014 - -

ACTIVITY AB1 L P1L P2L P3L P4L P5L AB2 L

PEDESTAL - - - - - - -

PIER N/A - - - - - N/A

2nd Lift - - - - - - -

Height (m) - - - - - - -

1st Lift - - - on-going - - -

Height (m) - - - - - - -

BIT. PAINTING - 28-May-14 - 17-May-14 - - -

PILE CAP - 17-May-14 - 08-May-14 - - -

F/P & BLINDING N/A 11-May-14 - 01-May-14 - on-going N/A

ACTIVITY AB1 R P1R P2R P3R P4R P5R AB2 R

PEDESTAL - - - - - - -

PIER N/A - - - - - N/A

2nd Lift - on-going - on-going - - -

Height (m) - - - - - - -

1st Lift - 20-May-14 on-going 26-May-14 - - -

Height (m) - 0.37 - 0.65 - - -

BIT. PAINTING - 12-May-14 25-May-14 08-May-14 - 31-May-14 -

PILE CAP - 04-May-14 13-May-14 30-04-2014 - 20-May-14 -

F/P & BLINDING N/A 27-Apr-14 07-May-14 22-Apr-14 - 14-May-14 N/A

PREVIOUS MONTH THIS MONTH

BRIDGE SUB-STRUCTURE PROGRESS SCHEDULE

As of 31 May 2014

SUB-STRUCTURE WORK PROGRESS (RHS)

SUB-STRUCTURE WORK PROGRESS (LHS)

Page 21: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 14

Re

bar

sC

on

cre

teR

eb

ars

Co

ncr

ete

Re

bar

sC

on

cre

te

10+

000

- 0+

022

22.0

01.

0 x

2.0

on

-go

ing

--

--

--

-2

0+02

2 -

0+04

018

.00

1.0

x 2.

028

-May

-14

--

--

--

-3

0+04

0 -

0+05

212

.00

1.0

x 2.

015

-Ap

r-14

16-A

pr-

1416

-Ap

r-14

19-A

pr-

1419

-Ap

r-14

21-A

pr-

1421

-Ap

r-14

29-A

pr-

144

0+05

2 -

0+07

018

.00

1.0

x 2.

005

-Mar

-14

24-M

ar-1

424

-Mar

-14

08-A

pr-

1408

-Ap

r-14

12-A

pr-

1412

-Ap

r-14

19-A

pr-

145

0+07

0 -

0+10

030

.00

1.0

x 2.

002

-Mar

-14

05-M

ar-1

405

-Mar

-14

06-M

ar-1

406

-Mar

-14

11-M

ar-1

411

-Mar

-14

19-M

ar-1

46

0+10

0 -

0+10

44.

001.

0 x

2.0

10-M

ay-1

4-

--

--

--

70+

104

- 0+

122

18.0

01.

0 x

2.0

10-M

ay-1

417

-May

-14

17-M

ay-1

420

-May

-14

20-M

ay-1

424

-May

-14

24-M

ay-1

429

-May

-14

80+

122

- 0+

139

17.0

01.

0 x

2.0

10-M

ay-1

414

-May

-14

14-M

ay-1

417

-May

-14

17-M

ay-1

419

-May

-14

19-M

ay-1

429

-May

-14

90+

139

- 0+

150

11.0

01.

0 x

2.0

05-M

ar-1

401

-Ap

r-14

01-A

pr-

1405

-Ap

r-14

05-A

pr-

1408

-Ap

r-14

08-A

pr-

1412

-Ap

r-14

100+

150

- 0+

170

20.0

01.

0 x

2.0

02-M

ar-1

406

-Mar

-14

06-M

ar-1

405

-Ap

r-14

05-A

pr-

1412

-Ap

r-14

12-A

pr-

1410

-Ap

r-14

110+

170

- 0+

182

12.0

01.

0 x

2.0

19-M

ay-1

422

-May

-14

22-M

ay-1

4o

n-g

oin

g-

--

-12

0+18

2 -

0+20

018

.00

1.0

x 2.

019

-May

-14

21-M

ay-1

421

-May

-14

25-M

ay-1

425

-May

-14

on

-go

ing

--

130+

200

- 0+

213.

513

.50

1.0

x 2.

024

-Fe

b-1

427

-Fe

b-1

427

-Fe

b-1

401

-Mar

-14

01-M

ar-1

404

-Mar

-14

04-M

ar-1

410

-Mar

-14

140+

213.

5 -

0+23

218

.50

1.0

x 1.

5-

--

--

--

-15

0+23

2 -

0+25

018

.00

1.0

x 1.

510

-Ap

r-14

13-A

pr-

1413

-Ap

r-14

15-A

pr-

1415

-Ap

r-14

19-A

pr-

1419

-Ap

r-14

13-M

ay-1

416

0+25

0 -

0+25

88.

001.

0 x

1.5

23-A

pr-

1426

-Ap

r-14

26-A

pr-

1427

-Ap

r-14

27-A

pr-

1401

-May

-14

01-M

ay-1

413

-May

-14

170+

258

- 0+

267

9.00

1.0

x 1.

5-

--

--

--

-26

7.00

71.5

0

MA

RC

H 2

01

4A

PRIL

201

4M

AY

2014

BA

LAN

CE

(m)

=TO

TAL

LEN

GTH

(m

) =

Bit

um

ino

us

Pai

nt

(2 C

oat

s)

FALA

J R

CBC

PR

OG

RES

S SC

HED

ULE

As

of

31 M

ay 2

014

NO

.ST

ATI

ON

TYP

E (1

Ce

ll) &

DIM

ENSI

ON

(m

)

LEN

GTH

(m)

F/P

&

BLI

ND

ING

(Cha

inag

e 23

+411

.400

)

BA

SE S

LAB

WA

LLTO

P S

LAB

Page 22: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 15

Re

bar

sC

on

cre

teR

eb

ars

Co

ncr

ete

Re

bar

sC

on

cre

te

121

+260

3 ce

lls

- 2.

0 x

1.5

49.0

790

--

--

--

--

221

+485

1 ce

ll -

2.0

x 1

.555

.790

0-

--

--

--

-3

21+8

382

x 4

cell

s -

2.0

x 1.

563

.250

0-

--

--

--

-4

21+9

72.4

11 x

4 c

ell

s -

3.0

x 2.

065

.647

0-

--

--

--

-B

lock

11

x 4

cell

s -

3.0

x 2.

028

.038

024

-May

-14

--

--

--

-B

lock

21

x 4

cell

s -

3.0

x 2.

028

.031

024

-May

-14

--

--

--

-B

lock

31

x 4

cell

s -

3.0

x 2.

028

.026

017

-May

-14

25-M

ay-1

425

-May

-14

--

--

-B

lock

41

x 4

cell

s -

3.0

x 2.

028

.022

018

-May

-14

--

--

--

-B

lock

51

x 4

cell

s -

3.0

x 2.

028

.019

018

-May

-14

29-M

ay-1

429

-May

-14

--

--

-B

lock

61

x 4

cell

s -

3.0

x 2.

028

.018

018

-May

-14

--

--

--

-B

lock

71

x 4

cell

s -

3.0

x 2.

028

.019

018

-May

-14

--

--

--

-B

lock

81

x 4

cell

s -

3.0

x 2.

028

.022

026

-May

-14

--

--

--

-B

lock

91

x 4

cell

s -

3.0

x 2.

028

.026

026

-May

-14

--

--

--

-B

lock

10

1 x

4 ce

lls

- 3.

0 x

2.0

28.0

310

28-M

ay-1

4-

--

--

--

Blo

ck 1

11

x 4

cell

s -

3.0

x 2.

028

.038

028

-May

-14

--

--

--

-B

lock

12

1 x

4 ce

lls

- 3.

0 x

2.0

21.0

150

--

--

--

--

Blo

ck 1

31

x 4

cell

s -

3.0

x 2.

021

.010

0-

--

--

--

-B

lock

14

1 x

4 ce

lls

- 3.

0 x

2.0

21.0

060

--

--

--

--

Blo

ck 1

51

x 4

cell

s -

3.0

x 2.

021

.003

0-

--

--

--

-B

lock

16

1 x

4 ce

lls

- 3.

0 x

2.0

21.0

010

--

--

--

--

Blo

ck 1

71

x 4

cell

s -

3.0

x 2.

021

.000

0-

--

--

--

-B

lock

18

1 x

4 ce

lls

- 3.

0 x

2.0

21.0

010

--

--

--

--

Blo

ck 1

91

x 4

cell

s -

3.0

x 2.

021

.003

0-

--

--

--

-B

lock

20

1 x

4 ce

lls

- 3.

0 x

2.0

21.0

060

--

--

--

--

Blo

ck 2

11

x 4

cell

s -

3.0

x 2.

021

.010

0-

--

--

--

-B

lock

22

1 x

4 ce

lls

- 3.

0 x

2.0

21.0

150

--

--

--

--

Blo

ck 2

31

x 4

cell

s -

3.0

x 2.

06.

635

0-

--

--

--

-B

lock

24

1 x

4 ce

lls

- 3.

0 x

2.0

6.78

20

--

--

--

--

Blo

ck 2

51

x 4

cell

s -

3.0

x 2.

06.

819

0-

--

--

--

-B

lock

26

1 x

4 ce

lls

- 3.

0 x

2.0

7.21

70

--

--

--

--

Blo

ck 2

71

x 4

cell

s -

3.0

x 2.

07.

975

0-

--

--

--

-B

lock

28

1 x

4 ce

lls

- 3.

0 x

2.0

8.57

10

--

--

--

--

Blo

ck 2

91

x 4

cell

s -

3.0

x 2.

09.

267

0-

--

--

--

-B

lock

30

1 x

4 ce

lls

- 3.

0 x

2.0

9.94

90

--

--

--

--

Blo

ck 3

11

x 4

cell

s -

3.0

x 2.

010

.260

0-

--

--

--

-B

lock

32

1 x

4 ce

lls

- 3.

0 x

2.0

10.2

620

--

--

--

--

Blo

ck 3

31

x 4

cell

s -

3.0

x 2.

010

.265

0-

--

--

--

-

PR

EV

IOU

S

MO

NT

HTH

IS M

ON

TH

LHS

RH

S

RH

S

RCB

C P

RO

GR

ESS

SCH

EDU

LE (

BA

RR

EL)

As

of

31 M

ay 2

014

BA

SE S

LAB

WA

LLN

O.

TOP

SLA

BB

itu

min

ou

s

Pai

nt

(2 C

oat

s)LE

NG

TH (

m)

SKEW

( °

)F/

P &

BLI

ND

ING

TYP

E &

DIM

ENSI

ON

STA

TIO

N

Page 23: MPR for May 2014
Page 24: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 16

Status of Payment Certificates Till May, 2014

Payment

Certificate

No.

Particulars

Contract

Amount

(RO)

Certified

Amount

(RO)

Approved

Amount

(RO)

Balance

Amount

Available (RO)

Original Contract Amount 17,884,403

1 Advance Payment 1,648,225 1,648,225

2 Interim Payment 514,442 513,608

3 Interim Payment 434,917

4 Interim Payment 407,538

Total Amount 17,884,403 3,005,122 2,161,833 14,879,281

Page 25: MPR for May 2014
Page 26: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 17

List of Contractor’s Equipment at site

Sl. No. DESCRIPTION CCC HIRED

TOTAL

AVAILABLE

AT SITE

1 COMPRESSOR

2 AIR COMPRESSOR 0 1 1

3 GENERATOR 2 0 2

4 CRANES -

5 CRANES 30 TON / 25 TON / 70 TON 2 0 2

6 VEHICLES H.D.

7 DIESEL TANKER 0 0 0

8 FLAT TRAILER 0 1 1

9 HIAB TRUCK 0 2 2

10 P/MOVER + TIPPING TRAILER 3 0 3

11 TIPPER TRUCKS 12 0 12

12 WATER TANKER 5000 GAL 2 0 2

13 EARTH MOVING PLANT

14 BOBCAT 1 0 1

15 EXCAVATOR 0 2 2

16 JCB 4CX / 3CX 0 4 4

17 SHOVEL / WHEEL LOADER 3 0 3

18 DOZER D9N/D8R 0 1 1

19 TELEHANDLER 0 0 0

20 CIVIL ENGINEERING EQUIPMENT

21 CONCRETE MIXER 0 0 0

22 DYNAPAC S/ROLLER 0 0 0

23 E/WORK ROLLER 1 0 1

24 MOTOR GRADER 0 1 1

25 TITAN PAVER MACHINE 0 0 0

26 TYRE / PTR ROLLER 0 0 0

27 PAVER MACHINE 0 0 0

28 L. D. VEHICLES & TRUCKS

29 DYNA TRUCK 2 1 3

30 MAINTENANCE TRUCKS 1 0 1

31 ASHLOK 55 SEAT 5 0 5

32 TOYOTA COASTER BUS 24 S 1 0 1

33 TOYOTA COROLLA/CIVIC/YARIS 0 8 8

34 TOYOTA PICKUP/ISUZU 5 7 12

35 NISSAN PATHFINDER/X-TRAIL 0 5 5

37 TOYOTA LAND CRUISER/FORTUNER 0 4 4

34

Total 40 37 77

Page 27: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 18

Ja

n-1

4Fe

b-1

4M

ar-

14

Ap

r-1

4M

ay

-14

Ju

n-1

4Ju

l-1

4A

ug

-14

Se

p-1

4O

ct-

14

No

v-1

4D

ec-1

4Ja

n-1

5Fe

b-1

5M

ar-

15

Ap

r-1

5M

ay

-15

Ju

n-1

5T

ota

l

PLA

NN

ED

TO

TA

L P

ER

MO

NTH

47

68

87

95

93

10

71

10

10

81

02

10

09

88

78

27

97

76

65

34

11

50

0

PLA

NN

ED

CU

MU

LA

TIV

E4

71

15

20

22

97

39

04

97

60

77

15

81

79

17

1,0

15

1,1

02

1,1

84

1,2

63

1,3

40

1,4

06

1,4

59

1,5

00

AC

TU

AL T

OTA

L P

ER

MO

NTH

33

55

66

68

77

29

9

AC

TU

AL C

UM

ULA

TIV

E3

38

81

54

22

22

99

CO

NS

OLID

AT

ED

CO

NT

RA

CT

OR

S C

O.

OM

AN

LLC

UP

GR

AD

ING

OF F

ALA

J A

L Q

AB

AIL

RO

UN

DA

BO

UT

EQ

UIP

ME

NT

HIS

TO

GR

AM

20

14

20

15

47

68

87

95

93

107

110

108

102

100

98

87

82

79

77

66

53

41

33

55

66

68

77

0

20

40

60

80

10

0

12

0Jan-14

Feb-14

Mar-14

Apr-14

May-14

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

No. of EQUIPMENT

PR

OJ

EC

T M

ON

TH

S

PL

AN

NE

D T

OT

AL

PE

R M

ON

TH

AC

TU

AL

TO

TA

L P

ER

MO

NT

H

Page 28: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 19

LIST OF DIRECT & INDIRECT MANPOWER BY CATEGORY

Sl.No. Manpower Category Expat

Employees Omani Employees Total Employees

1 AC Mechanic 1 1

2 Asst Cook 2 2

3 Asst Electrician 1 1

4 Asst Security Supervisor 1 1

5 Asst. Surveyor 1 1 2

6 Asst. Lab Technician 1 1

7 Asst. Mechanic 1 1

8 Asst.Store Keeper 1 1

9 Auto Electrician 1 1

10 Butcher 1 1

11 C/H Auto Electrician 1 1

12 C/H Carpentry 19 19

13 C/H Civil 1 8 9

14 C/H Earth Works 5 5

15 C/H Electrician 2 2

16 C/H Masonary 14 14

17 C/H Mechanical (Plant) 1 1

18 C/H Plumbing 1 1

19 C/H Rigger 3 3

20 C/H Scaffolding 2 2

21 C/H Steel Fixing 4 4

22 Carpenter 70 70

23 Chainman / Level man 9 9

24 Cleaner 2 2

25 Clerk-Filling /Clerk Tech 4 4 8

26 Cook 5 5

27 Crane Operator 2 2

28 Dozer Operator 1 1

Page 29: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 20

Sl.No. Manpower Category Expat

Employees

Omani

Employees Total Employees

29 Drill Operator 1 1

30 Earthwork Checker 1 1

31 Electrician 1 1

32 F/M Carpentry 1 1

33 Grader Operator 2 2

34 Heavy Duty Driver 8 23 31

35 Heavy Duty Mechanic 4 1 5

36 Helper/Store Helper 3 3

37 Kitchen Attendant 2 2

38 Lab Helper 4 4

39

Labour/Rockman/Fuel

attendant 113 25 138

40 Laundry Attendant. 3 3

41 Light Duty Driver 27 27

42 Maintenance Mechanic 1 1

43 Mason 71 71

44 Office Boy / Office Asst 6 6

45 Pastry Maker 1 1

46 Pipe Fitter 1 1

47 Rigger 5 3 8

48 Roller Operator 1 1 2

49 Room Attendant. 2 2

50 Safety Officer 1 1

51 Shovel Operator 2 1 3

52 Sign Bord Writer 1 1

53 Steel Fixer 55 2 57

54 Time Keeper 5 5

55 Trailer Driver 6 1 7

56 Transport Officer 1 1

57 Turner 1 1

58 Tyreman 2 2

59 Waiter 5 5

60 Watchman 39 39

Total 463 140 603

1

Sub Total of Direct +

Indirect Manpower 435 146 581

2

Site and Office Engineers &

Staff 47 7 54

3 Subcontractors 13 13

Grand Total 648

Page 30: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 21

20

13

De

c-1

3Jan

-14

Fe

b-1

4M

ar-

14

Ap

r-14

May-1

4Ju

n-1

4Ju

l-14

Au

g-1

4S

ep

-14

Oct-

14

No

v-1

4D

ec-1

4Jan

-15

Fe

b-1

5M

ar-

15

Ap

r-15

May-1

5Ju

n-1

5T

ota

l

PL

AN

NE

D T

OT

AL

PE

R M

ON

TH

- (

DIR

EC

T )

634

186

375

586

791

792

799

794

793

701

480

381

269

246

307

307

305

149

8301

PL

AN

NE

D T

OT

AL

PE

R M

ON

TH

- (

IN

DIR

EC

T )

523

36

50

52

57

59

59

60

61

63

61

61

57

51

47

44

35

30

914

PL

AN

NE

D T

OT

AL

PE

R M

ON

TH

- (

DIR

EC

T +

IN

DIR

EC

T )

11

57

222

425

638

848

851

858

854

854

764

541

442

326

297

354

351

340

179

9215

PL

AN

NE

D C

UM

UL

AT

IVE

11

68

291

715

1,3

53

2,2

02

3,0

52

3,9

10

4,7

64

5,6

18

6,3

83

6,9

23

7,3

65

7,6

91

7,9

88

8,3

42

8,6

93

9,0

33

9,2

12

9,2

12

AC

TU

AL

TO

TA

L P

ER

MO

NT

H -

( D

IRE

CT

)322

365

550

581

603

691

3112

AC

TU

AL

TO

TA

L P

ER

MO

NT

H -

( IN

DIR

EC

T )

18

26

46

49

54

57

250

AC

TU

AL

TO

TA

L P

ER

MO

NT

H -

( D

IRE

CT

+ IN

DIR

EC

T )

340

391

596

630

657

748

00

00

00

00

00

00

03362

AC

TU

AL

CU

MU

LA

TIV

E340

731

1,3

27

1,9

57

2,6

14

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

3,3

62

CO

NS

OLID

AT

ED

CO

NT

RA

CT

OR

S C

O.

OM

AN

LLC

UP

GR

AD

ING

OF

FA

LA

J A

L Q

AB

AIL

RO

UN

DA

BO

UT

MA

NP

OW

ER

HIS

TO

GR

AM

(D

IRE

CT

& IN

DIR

EC

T)

20

14

20

15

11

57

222

425

638

848

851

858

854

854

764

541

442

326

297

354

351

340

179

340

391

596

630

657

748

0

0

0

0

0

0

0

0

0

0

0

0

0

0

10

0

20

0

30

0

40

0

50

0

60

0

70

0

80

0

90

0

Dec-13

Jan-14

Feb-14

Mar-14

Apr-14

May-14

Jun-14

Jul-14

Aug-14

Sep-14

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15

No. of Men

PR

OJ

EC

T M

ON

TH

S

PL

AN

NE

D T

OT

AL P

ER

MO

NTH

- ( D

IRE

CT

+ IN

DIR

EC

T )

AC

TU

AL

TO

TA

L P

ER

MO

NT

H -

( D

IRE

CT

+ IN

DIR

EC

T )

Page 31: MPR for May 2014
Page 32: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 22

Page 33: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 23

Page 34: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 24

Page 35: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 25

Page 36: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 26

Page 37: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 27

Date

Su

bm

itte

d

CC

C/F

QI/

RE

N/M

AS

/001

MA

S/C

CC

/FQ

I/B

BC

/001

Bit

um

ino

us B

ase C

ou

rse

Tarm

ac Z

aw

aw

i L

LC

Om

an

22/1

2/2

013

Ren

ard

et

AP

PR

OV

ED

01/0

4/2

014

SO

/FQ

I/C

CC

/087

07/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/002

MA

S/C

CC

/FQ

I/G

TI/

002

Geo

tech

nic

al In

vesti

gati

on

Sw

issb

ori

ng

& C

om

pan

y L

LC

26/1

2/2

013

Ren

ard

et

AP

PR

OV

ED

02/0

2/2

014

SO

/FQ

I/C

CC

/015

12/0

2/2

014

CC

C/F

QI/

RE

N/M

AS

/003

MA

S/C

CC

/FQ

I/M

SE

/003

MS

E W

all S

yste

mF

rey

ssin

et

Ara

bia

n S

ea L

LC

26/1

2/2

013

Ren

ard

et

AP

PR

OV

ED

02/0

2/2

014

SO

/FQ

I/C

CC

/014

12/0

2/2

014

CC

C/F

QI/

RE

N/M

AS

/004

MA

S/C

CC

/FQ

I/P

VC

/004

UP

VC

Pip

es

Am

ian

tit

Om

an

26/1

2/2

013

Ren

ard

et

AP

PR

OV

ED

09/0

2/2

014

SO

/FQ

I/C

CC

/019

18/0

2/2

014

CC

C/F

QI/

RE

N/M

AS

/005

MA

S/C

CC

/FQ

I/H

DP

E/0

05

HD

PE

Pip

es &

Fit

tin

gs

Am

ian

tit

Om

an

26/1

2/2

013

Ren

ard

et

AP

PR

OV

ED

09/0

2/2

014

SO

/FQ

I/C

CC

/020

18/0

2/2

014

CC

C/F

QI/

RE

N/M

AS

/006

MA

S/C

CC

/FQ

I/P

W/0

06

Pilin

g W

ork

sA

PC

C L

LC

26/0

1/2

014

Ren

ard

et

AP

PR

OV

ED

19/0

2/2

014

SO

/FQ

I/C

CC

/026

25/0

2/2

014

CC

C/F

QI/

RE

N/M

AS

/007

MA

S/C

CC

/FQ

I/M

C/0

07

Bit

nu

min

ou

s P

rim

e C

oat

(MC

-70)

Em

irate

s L

ub

e O

il C

o. (M

uscat)

30/0

1/2

014

Ren

ard

et

AP

PR

OV

ED

09/0

3/2

014

SO

/FQ

I/C

CC

/069

27/0

3/2

014

CC

C/F

QI/

RE

N/M

AS

/008

MA

S/C

CC

/FQ

I/R

S/0

08

Rein

forc

ing

Ste

el

Mu

scat

Ste

el In

du

str

ies

02/0

2/2

014

Ren

ard

et

AP

PR

OV

ED

20/0

3/2

014

SO

/FQ

I/C

CC

/063

24/0

3/2

014

CC

C/F

QI/

RE

N/M

AS

/009-1

MA

S/C

CC

/FQ

I/P

T/0

09-1

Po

st

Ten

sio

nin

g W

ork

- A

nch

ora

ge

Fre

yssin

et

Ara

bia

n S

ea L

LC

22/0

2/2

014

Ren

ard

et

AP

PR

OV

ED

27/0

3/2

014

SO

/FQ

I/C

CC

/089

14/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/009-2

MA

S/C

CC

/FQ

I/P

T/0

09-2

Po

st

Ten

sio

nin

g W

ork

- D

uct

Fre

yssin

et

Ara

bia

n S

ea L

LC

22/0

2/2

014

Ren

ard

et

AP

PR

OV

ED

27/0

3/2

014

SO

/FQ

I/C

CC

/090

14/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/009-3

MA

S/C

CC

/FQ

I/P

T/0

09-3

Po

st

Ten

sio

nin

g W

ork

- S

tran

dF

rey

ssin

et

Ara

bia

n S

ea L

LC

22/0

2/2

014

Ren

ard

et

AP

PR

OV

ED

27/0

3/2

014

SO

/FQ

I/C

CC

/091

14/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/010A

-Rev

.1M

AS

/CC

C/F

QI/

PB

/010A

-Rev

.1B

rid

ge P

ot

Beari

ng

sA

l A

mm

ar

Inte

rnati

on

al

07/0

5/2

014

Ren

ard

et

Not

Approve

d--

-R

EN

/FQ

I/C

CC

/111

13/0

5/2

014

CC

C/F

QI/

RE

N/M

AS

/010B

MA

S/C

CC

/FQ

I/P

B/0

10B

Bri

dg

e P

ot

Beari

ng

sB

uild

ing

Su

pp

lies &

Serv

ices

11/0

5/2

014

Ren

ard

et

AP

PR

OV

ED

25/0

5/2

014

RE

N/F

QI/

CC

C/1

22

31/0

5/2

014

CC

C/F

QI/

RE

N/M

AS

/011

MA

S/C

CC

/FQ

I/H

DP

E/0

11

HD

PE

Wate

r P

ipes

Am

ian

tit

Om

an

22/0

2/2

014

Ren

ard

et

AP

PR

OV

ED

09/0

3/2

014

SO

/FQ

I/C

CC

/038

11/0

3/2

014

CC

C/F

QI/

RE

N/M

AS

/012

MA

S/C

CC

/FQ

I/R

CB

C/0

12

Sin

gle

cell P

recast

Bo

x C

ulv

ert

Am

ian

tit

Om

an

22/0

2/2

014

Ren

ard

et

AP

PR

OV

ED

25/0

3/2

014

SO

/FQ

I/C

CC

/064

26/0

3/2

014

CC

C/F

QI/

RE

N/M

AS

/013

MA

S/C

CC

/FQ

I/B

P/0

13

Bit

um

ino

us P

ain

t M

ate

rial (R

ub

beri

zed

)A

l In

ma B

uild

ing

Mate

rila

l L

LC

02/0

3/2

014

Ren

ard

et

Not

Approve

d20/0

4/2

014

RE

N/F

QI/

CC

C/1

05

05/0

5/2

014

CC

C/F

QI/

RE

N/M

AS

/014A

-Rev

.1M

AS

/CC

C/F

QI/

EJ/

014A

-Rev

.1B

rid

ge E

xpan

sio

n J

oin

tsA

l A

mm

ar

Inte

rnati

on

al

07/0

5/2

014

Ren

ard

et

AP

PR

OV

ED

20/0

5/2

014

RE

N/F

QI/

CC

C/1

23

31/0

5/2

014

CC

C/F

QI/

RE

N/M

AS

/015

MA

S/C

CC

/FQ

I/R

C/0

15

Rein

forc

ed

Co

ncre

te P

ipe (

450,6

00,7

00m

m d

ia)

Am

ian

tit

Om

an

02/0

3/2

014

Ren

ard

et

AP

PR

OV

ED

23/0

3/2

014

SO

/FQ

I/C

CC

/077

02/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/016 B

MA

S/C

CC

/FQ

I/W

S/0

16 B

Wate

r S

top

G E

E-2

5S

ika L

LC

Om

an

25/0

3/2

014

Ren

ard

et

AP

PR

OV

ED

16/0

4/2

014

RE

N/F

QI/

CC

C/0

99

28/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/017

MA

S/C

CC

/FQ

I/T

W/0

17

Tele

ph

on

e W

ork

sN

ati

on

al T

ele

ph

on

e S

erv

ices

12/0

3/2

014

Ren

ard

et

AP

PR

OV

ED

17/0

3/2

014

SO

/FQ

I/C

CC

/082

03/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/019

MA

S/C

CC

/FQ

I/E

W/0

19

Ele

ctr

ical W

ork

sU

nit

ed

En

gin

eeri

ng

Pro

jects

22/0

3/2

014

Ren

ard

et

CC

C/F

QI/

RE

N/M

AS

/020

MA

S/C

CC

/FQ

I/E

C/0

20

MV

& L

V C

ab

les

Un

ited

En

gin

eeri

ng

Pro

jects

19/0

3/2

014

Ren

ard

et

AP

PR

OV

ED

27/0

3/2

014

SO

/FQ

I/C

CC

/083

03/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/021

MA

S/C

CC

/FQ

I/P

S/0

21

Packag

e S

ub

sta

tio

nU

nit

ed

En

gin

eeri

ng

Pro

jects

22/0

3/2

014

Ren

ard

et

CC

C/F

QI/

RE

N/M

AS

/022

MA

S/C

CC

/FQ

I/L

L/0

22

Str

eet

Lig

hti

ng

Lu

min

ari

es

Un

ited

En

gin

eeri

ng

Pro

jects

27/0

3/2

014

Ren

ard

et

CC

C/F

QI/

RE

N/M

AS

/023A

MA

S/C

CC

/FQ

I/L

P/0

23A

Str

eet

Lig

hti

ng

Po

les (

Mid

-Hin

ged

)S

tars

Lig

ht

LL

C22/0

5/2

014

Ren

ard

et

CC

C/F

QI/

RE

N/M

AS

/024

MA

S/C

CC

/FQ

I/F

P/0

24

Str

eet

Lig

hti

ng

Feed

er

Pilla

rS

tars

Lig

ht

LL

C27/0

3/2

014

Ren

ard

et

CC

C/F

QI/

RE

N/M

AS

/025

MA

S/C

CC

/FQ

I/JS

/026

Join

t S

eala

nt

(Po

lyseal)

Al In

ma B

uild

ing

Mate

rila

l L

LC

27/0

3/2

014

Ren

ard

et

AP

PR

OV

ED

16/0

4/2

014

RE

N/F

QI/

CC

C/1

00

28/0

4/2

014

CC

C/F

QI/

RE

N/M

AS

/026

MA

S/C

CC

/FQ

I/G

T/0

26

Geo

text

ile

Mo

dern

East

Tra

din

g &

Co

n.

21/0

5/2

014

Ren

ard

et

Ma

teri

al A

pp

rov

al S

tatu

s

Re

nard

et

Le

tte

r

Date

d

Re

fere

nce

No

.M

AR

No

.M

ate

rial/

Wo

rkS

up

pli

er/

Su

bco

ntr

acto

rS

ub

mit

te

d T

o

Re

mark

s

By M

OT

C

MO

TC

Co

mm

en

t

s d

ate

d

Via

Re

nard

et

Le

tte

r R

ef.

No

.

Page 38: MPR for May 2014
Page 39: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 28

Engineer’s Comments

The percentage of progress as per the construction program is 23.21%.

The percentage of progress as per the actual work is 10.66%.

There is a shortfall of 12.55% in progress which needs to be recovered in the

coming 03 months.

Traffic is diverted on to the Detours on 03.05.2014 early hours and traffic is moving

smoothly without any hiccups.

Construction works for relocation of Falaj completed in 190m out of 270m.

Load testing of 02 no. expendable piles and 02 no. working piles completed and the

results are in compliance with standards.

Pile Foundation works are completed for all Piers except Pier No. 4 by 22.05.2014.

Page 40: MPR for May 2014
Page 41: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 29

S.

No

.

Da

te

Rec

eive

dF

rom

Ref

eren

ce N

oSu

bje

ctR

eply

da

teR

efer

ence

No

.R

ema

rks

13

/25

/20

14

CC

CF

QI/

RE

NA

RD

ET

/91

Rei

mb

urs

emen

t o

f E

mb

ank

men

t fi

ll

mat

eria

l un

der

bo

th d

eto

urs

RH

S&L

HS

5/1

3/2

01

4R

EN

/FQ

I/C

CC

/11

0

24

/1/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

01

Co

ntr

act

No

.51

/20

12

- u

p-g

rad

atio

n o

f

fala

j al-

qab

ail R

ou

nd

abo

ut

5/1

3/2

01

4R

EN

/FQ

I/C

CC

/10

9

34/

14/2

014

CC

CFQ

I/R

ENA

RD

ET/1

16C

on

cre

te m

ix d

esi

gn c

alcu

lati

on

s (C

15,C

30

and

C35

)

44/

15/2

014

CC

CFQ

I/R

EN/M

AS/

014A

Ap

pro

al f

or

bri

dge

exp

aris

ion

join

ts

MA

R.N

o. M

AS/

CC

C/F

QI/

EJ/0

14A

4/24

/201

4R

EN

/FQ

I/C

CC

/09

3

54/

17/2

014

CC

CFQ

I/R

EN/T

R-0

63SO

L- 1

( B

atin

ah H

igh

way

) c

ross

se

ctio

n a

t

CH

. 21

+140

to

CH

.21+

320

4/22

/201

4A

pp

rove

d

64/

19/2

014

CC

CFQ

I/R

EN/T

R-0

65SO

L-1(

Bat

inah

Hig

hw

ay )

cro

ss s

ect

ion

at

CH

.22+

580

to C

H: 2

3+26

04/

24/2

014

Ap

pro

ved

74/

22/2

014

CC

CFQ

I/R

ENA

RD

ET/1

19St

atic

lo

ad t

est

fo

r e

xpe

nd

able

(n

on

-

wo

rkin

g )

pil

e E

P-0

24/

24/2

014

SO/F

QI/

CC

C/0

97

84

/22

/20

14

CC

CF

QI/

RE

NA

RD

ET

/12

0C

lau

se 1

4 p

rogr

am -

( R

ev. 2

)5

/11

/20

14

RE

N/F

QI/

CC

C/1

07

94/

23/2

014

CC

CFQ

I/R

ENA

RD

ET/1

21Ex

ten

sio

n o

f p

ile

s at

Ab

utm

en

t 1

and

Ab

utm

en

t 2

5/3/

2014

RE

N/F

QI/

CC

C/1

04

10

4/23

/201

4C

CC

FQI/

REN

AR

DET

/122

Up

grad

ing

of

fala

j alq

abai

l Ro

un

dab

ou

t

11

4/24

/201

4D

GR

23

91St

arti

ng

at p

roje

cts

wo

rk .(

MA

S o

f P

ot

Be

arin

g)

5/1

4/2

01

4R

EN

/FQ

I/D

GR

/03

3/1

4

12

4/24

/201

4C

CC

FQI/

REN

/TR

-069

SOL-

1 (

Bat

inah

Hig

hw

ay )

cro

ss s

ect

ion

at

CH

. 21

+150

to

CH

.21+

320

4/27

/201

4A

pp

rove

d

13

4/28

/201

4C

CC

FQI/

REN

/TR

-071

Dim

en

sio

n a

nd

de

tail

s o

f ce

ll B

ox

culv

ert

1

(2.0

*1.5

)ske

w A

ngl

e 0

@ C

H.2

4+57

05/

15/2

014

Ap

pro

ved

14

4/28

/201

4C

CC

FQI/

REN

/TR

-072

Bar

Be

nd

ing

sch

ed

ula

l fo

r 9

cell

Bo

x

culv

ert

up

stre

am5/

15/2

014

Re

vise

& R

esu

bm

it

15

4/30

/201

4C

CC

FQI/

REN

AR

DET

/124

Stat

ic l

oad

te

stin

g f

or

wo

rk p

ile

# 06

at

pie

r 1

LHS.

16

4/30

/201

4C

CC

FQI/

REN

/TR

-074

SOL-

1 (

Bat

inah

Hig

hw

ay )

cro

ss s

ect

ion

at

CH

. 21

+340

to

CH

.22+

240

5/11

/201

4A

pp

rove

d

CO

RR

ESP

ON

DE

NC

E R

EC

OR

D F

OR

TH

E M

ON

TH

OF

MA

Y 2

01

4

Page 42: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 30

S.

No

.

Da

te

Rec

eive

dF

rom

Ref

eren

ce N

oSu

bje

ctR

eply

da

teR

efer

ence

No

.R

ema

rks

17

5/1

/20

14

CC

CF

QI/

RE

NA

RD

ET

/12

7M

on

thly

Pro

gres

s R

epo

rt N

o.4

18

5/1

/20

14

CC

CF

QI/

RE

N/T

R-0

77

Dim

ensi

on

an

d d

etai

ls o

f ce

ll B

ox

culv

ert

1 (

2.0

*1.5

)sk

ew A

ngl

e 0

@ C

H.2

4+

23

55

/3/2

01

4

Re

vise

& R

esu

bm

it

19

5/1

/20

14

CC

CF

QI/

SM/0

4W

ork

ing

on

Fri

day

20

5/4

/20

14

CC

CF

QI/

RE

N/T

R-0

79

Sho

pe

dra

win

g fo

r B

rid

ge B

eari

ng

sett

ing

-

ou

t @

CH

.23

+2

69

.50

TO

23

+5

09

.50

5/6

/20

14

Ap

pro

ved

21

5/4

/20

14

CC

CF

QI/

RE

NA

RD

ET

/13

2R

evis

ed p

lan

an

d p

rofi

le (

( R

ev.3

0))

22

5/4

/20

14

CC

CF

QI/

RE

NA

RD

ET

/12

5Sa

fety

off

icer

s at

sit

e

23

5/4

/20

14

CC

CF

QI/

RE

NA

RD

ET

/12

6C

alib

rati

on

cel

l ch

eck

cer

tifi

cate

-lo

ad

5/1

1/2

01

4R

EN

/FQ

I/C

CC

/10

6

24

5/4

/20

14

CC

CF

QI/

RE

NA

RD

ET

/12

8

Alt

ern

ativ

e So

urc

e fo

r B

itu

min

ou

s B

ase

cou

rse

5/1

5/2

01

4R

EN

/FQ

I/C

CC

/11

4

25

5/4

/20

14

CC

CF

QI/

RE

NA

RD

ET

/12

9Q

uo

tati

on

fo

r A

dd

itio

nal

Ele

ctri

cal w

ork

s

26

5/4

/20

14

CC

CF

QI/

RE

NA

RD

ET

/13

3

Pro

ject

pro

gres

s p

ho

togr

aph

s &

vid

eeo

s

soft

co

py

27

5/4

/20

14

CC

CF

QI/

RE

N/T

R-0

84

SOL

- 1

( B

atin

ah H

igh

way

)cro

ss s

ecti

on

at C

H.2

3+

52

0 t

o C

H. 2

3+

94

05

/6/2

01

4A

pp

rov

ed

28

5/4

/20

14

CC

CF

QI/

RE

N/T

R-0

85

Bar

Ben

din

g Sc

hed

ule

fo

r 4

4 c

ell B

ox

culv

ert

up

stre

am -

Blo

ck :

01

to

11

5/8

/20

14

Ap

pro

ved

29

5/4

/20

14

CC

CF

QI/

RE

N/T

R-0

86

Bar

Ben

din

g Sc

hed

ule

fo

r 4

4 c

ell B

ox

culv

ert

Do

wn

stre

am -

Blo

ck :1

2 t

o 3

35

/8/2

01

4A

pp

rov

ed

30

5/5

/20

14

CC

CF

QI/

RE

N/T

R-0

87

Dim

ensi

on

Co

-ord

inat

es d

etai

ls P

lan

an

d

sect

ion

5 c

ell B

ox

culv

ert(

3.0

*2.0

sk

ew

An

gle

0 )

@ C

H.2

3+

49

05

/11

/20

14

Ap

pro

ved

31

5/5

/20

14

CC

CF

QI/

RE

N/T

R-0

88

Dim

ensi

on

an

d d

etai

ls o

f 3

cel

l Bo

x

culv

ert

3 (

2.0

*1.5

)sk

ew A

ngl

e 0

@

CH

.21

+2

60

5/6

/20

14

Ap

pro

ved

32

5/5

/20

14

CC

CF

QI/

RE

N/T

R-0

89

Dim

ensi

on

an

d d

etai

ls o

f 1

cel

l Bo

x

culv

ert

1 (

2.0

*1.5

)sk

ew A

ngl

e 0

@

CH

.21

+4

85

5/1

5/2

01

4A

pp

rov

ed

33

5/6

/20

14

CC

CF

QI/

RE

N/T

R-0

90

Dim

ensi

on

an

d d

etai

ls o

f 1

cel

l Bo

x

culv

ert

1 (

2.0

*1.5

)sk

ew A

ngl

e 0

@

CH

.23

+9

97

5/1

5/2

01

4A

pp

rov

ed

Page 43: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 31

S.

No

.

Da

te

Rec

eive

dF

rom

Ref

eren

ce N

oSu

bje

ctR

eply

da

teR

efer

ence

No

.R

ema

rks

34

5/6

/20

14

CC

CF

QI/

RE

N/T

R-0

91

Dim

ensi

on

an

d d

etai

ls o

f 1

cel

l Bo

x

culv

ert

1 (

2.0

*1.5

)sk

ew A

ngl

e 0

@

CH

.24

+2

35

5/1

5/2

01

4A

pp

rov

ed

35

5/6

/20

14

CC

CF

QI/

RE

NA

RD

ET

/13

4Sa

fety

off

icer

s D

iver

sio

n

36

5/7

/20

14

CC

CF

QI/

RE

NA

RD

ET

/13

5R

elo

cati

on

of

Tel

eph

on

e C

able

s

37

5/7

/20

14

CC

CF

QI/

RE

NA

RD

ET

/13

6St

reet

ligh

tin

g p

ole

s

38

5/7

/20

14

CC

CF

QI/

RE

NA

RD

ET

/13

7A

ggre

gate

Bas

e C

ou

rse

5/1

8/2

01

4R

EN

/FQ

I/C

CC

/11

5

39

5/1

2/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

40

Stat

ic lo

ad t

est

of

Exp

end

able

pil

e A

bu

t

#2

- C

h.2

3+

90

0

40

5/1

3/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

41

Cla

use

14

pro

gram

- (

Rev

. 2 )

41

5/1

4/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

42

En

tran

ce a

nd

Exi

t p

oin

ts t

o F

QI

Site

fro

m

Det

ou

r

42

5/1

7/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

43

Ap

pro

ved

Gen

eral

lay

ou

t p

lan

- R

ev .

C -

Un

der

pas

ses

loca

tio

n

43

5/1

9/2

01

4C

CC

FQ

I/R

EN

/TR

-10

0

Sho

p d

raw

ing

of

the

po

st t

ensi

on

ing

wo

rks

Bri

dge

1.2

.3.4

44

5/1

9/2

01

4C

CC

FQ

I/R

EN

/TR

-10

1

Co

- O

rdin

ates

pla

n f

or

Dra

in C

han

nel

at

ch.2

3+

40

05

/21

/20

14

Ap

pro

ved

45

5/2

0/2

01

4C

CC

FQ

I/R

EN

/TR

-10

2

Exi

stin

g R

ipra

p (

To

be

rem

ov

ed )

at

Ch

.24

+2

29

.24

2 t

o 2

4+

34

3.3

00

To

ch.2

5+

50

3.2

03

&2

4+

57

3.9

75

5/3

1/2

01

4A

pp

rov

ed

46

5/2

0/2

01

4C

CC

FQ

I/R

EN

/TR

-10

3

Cle

anin

g an

d G

rab

ing

at C

H.2

1+

15

0

to2

5+

22

3.0

09

47

5/2

1/2

01

4C

CC

CC

C/F

QI/

RE

N/M

AS/

02

6Ap

pro

val

fo

r G

eto

text

ile

MA

R.N

O.M

AS/

CC

C/F

QI/

GT

/02

65

/27

/20

14

RE

N/F

QI/

CC

C/1

19

48

5/2

1/2

01

4C

CC

FQ

I/R

EN

/TR

-10

4

Exi

stin

g B

oll

ard

( T

o b

e re

mo

ved

) a

t

Ch

.24

+1

45

.38

1 t

o 2

4+

18

6.5

74

5/2

5/2

01

4A

pp

rov

ed

49

5/2

1/2

01

4C

CC

FQ

I/R

EN

/TR

-10

5

SOL

- 1

( B

atin

ah H

igh

way

)cro

ss s

ecti

on

at C

H.2

3+

34

9.5

00

to

CH

. 23

+4

29

.50

05

/31

/20

14

Ap

pro

ved

50

5/2

1/2

01

4C

CC

FQ

I/R

EN

/TR

-10

6B

eari

ng

loca

tio

n S

chem

e5

/27

/20

14

Ap

pro

ved

51

5/2

1/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

44

Dra

inag

e L

ayo

ut

Pla

n5

/28

/20

14

RE

N/F

QI/

CC

C/1

21

52

5/2

1/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

45

Agg

rega

te B

ase

Co

urs

e

53

5/2

1/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

46

Stat

ic lo

ad t

est

for

Exp

end

able

(N

on

-

wo

rkin

g) p

ile

# E

P-0

15

/25

/20

14

RE

N/F

QI/

CC

C/1

16

Page 44: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 32

S.

No

.

Da

te

Rec

eive

dF

rom

Ref

eren

ce N

oSu

bje

ctR

eply

da

teR

efer

ence

No

.R

ema

rks

54

5/2

1/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

47

Stat

ic lo

ad t

est

for

Exp

end

able

(N

on

-

wo

rkin

g) p

ile

# E

P-0

45

/27

/20

14

RE

N/F

QI/

CC

C/1

20

55

5/2

2/2

01

4C

CC

FQ

I/R

EN

/TR

-10

7

Dra

inag

e in

let

typ

e -

I D

etai

ls o

f 3

cel

l

Bo

x B

OX

Cu

lver

t @

Ch

.21

+2

60

6/1

/20

14

Ap

pro

ved

56

5/2

2/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

48

Stat

ic lo

ad t

esti

ng

5/2

6/2

01

4R

EN

/FQ

I/C

CC

/11

8

57

5/2

2/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

49

Stat

ic L

oad

Tes

t o

f w

ork

ing

pil

e#4

8, A

bu

t-

5 L

HS

58

5/2

2/2

01

4C

CC

CC

C/F

QI/

RE

N/M

AS/

02

3AA

pp

rov

al f

or

Stre

et li

ghti

ng

po

les

MA

R.N

O.M

AS/

CC

C/F

QI/

LP

/02

3A

59

5/2

5/2

01

4C

CC

FQ

I/R

EN

/TR

-10

8

Dra

inag

e in

let

typ

e -

I D

etai

ls @

Ch

.21

+3

80

to

1 C

ell B

ox

Cu

lver

t @

Ch

.21

+4

85

6/1

/20

14

Ap

pro

ved

60

5/2

5/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

51

Co

mp

leti

on

of

pil

ing

wo

rks

- E

xclu

din

g

loca

tio

n p

ier

4 (

RH

S&L

HS)

61

5/2

5/2

01

4C

CC

FQ

I/R

EN

/TR

-10

9Sh

op

dra

win

g o

f 3

way

# 1

50

mm

UP

VC

ele

ct5/2

5/2

01

5A

pp

rov

ed

62

5/2

6/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

52

Sum

mer

Wo

rkin

g H

ou

rs (

JU

NE

, Ju

ly &

Au

gust

)20

14

63

5/2

6/2

01

4C

CC

FQ

I/R

EN

/TR

-11

0

Dra

inag

e in

let

typ

e -

I D

etai

ls @

Ch

.21

+5

60

to

Ch

.21

+6

20

6/1

/20

14

Ap

pro

ved

64

5/2

7/2

01

4C

CC

FQ

I/R

EN

/TR

-11

1

Dra

inag

e In

let

Ty

pe

-III

Det

ails

8 c

ell B

ox

culv

ert

@ C

h 2

1+

83

86

/1/2

01

4A

pp

rov

ed

65

5/2

8/2

01

4C

CC

FQ

I/R

EN

/TR

-11

2

Pie

r B

eari

ng

lev

el D

etai

ls @

Ch

.23

+3

49

.50

0 t

o C

h.2

3+

42

9.5

00

5/2

8/2

01

4A

pp

rov

ed

66

5/2

9/2

01

4C

CC

FQ

I/R

EN

/TR

-11

3

Pie

r B

eari

ng

lev

el D

etai

ls @

Ch

.23

+3

09

.50

0 t

o C

h.2

3+

46

9.5

00

( P

1 L

& P

1R

) T

O (

P5

L&

P5

R)

1.6

.20

14

Ap

pro

ved

67

5/2

9/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

53

Pen

din

g D

raw

ing

Sub

mit

tals

68

5/3

1/2

01

4C

CC

FQ

I/R

EN

AR

DE

T/1

54

RO

P. A

pp

rov

al D

eto

ur

Pla

n

69

25

/20

14

CC

CF

QI/

RE

NA

RD

ET

/15

0A

L-I

sraa

Wa

l Mi r

aj 2

01

4

70

CC

CF

QI/

RE

NA

RD

ET

/13

8In

teri

m p

aym

ent

Ap

pli

cati

on

#0

4

71

CC

CF

QI/

RE

NA

RD

ET

/13

9

Stat

ic lo

ad t

est

Rep

ort

fo

r 1

00

0m

m

wo

rkin

g p

ile

#SO

P 0

65

/11

/20

14

RE

N/F

QI/

CC

C/1

08

Page 45: MPR for May 2014
Page 46: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 33

PROGRESS PHOTOGRAPHS

Bed Preparation for Construction of Falaj in progress

Blinding Concrete for construction of Falaj in Progress

Page 47: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 34

Placing of Epoxy coated reinforcement for Falaj in Progress

Waterproofing of Completed Falaj

Page 48: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 35

Traffic Diversion in Detours

Traffic Diversion in Detours – U Turn

Page 49: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 36

Removal of Existing Asphalt in Progress

Removal of Existing Asphalt in progress

Page 50: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 37

Bed Preparation for Blinding Concrete of Pile Cap in Progress

Blinding Concrete for Pile Cap in Progress

Page 51: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 38

Piles for Abutment No. 1 Completed to Ground Level

Placing of Reinforcement for Abutment Piles in Progress

Page 52: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 39

Pile Integrity Test in Progress

Curing of Pile Cap in Progress

Page 53: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 40

Protection of Reinforcement while Curing of Pile Cap in Progress

Waterproofing of Completed Pile Cap

Page 54: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 41

Placing of Reinforcement for Pier in Progress

Fixing of Shuttering for Pier in Progress

Page 55: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 42

Reinforcement Fixing in 44 Cells Box Culvert in Progress

Removal of Street Lighting Poles in Progress

Page 56: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 43

Unloading of Precast Box Culverts in Progress

Investigation of Underground Utilities in Progress

Page 57: MPR for May 2014

Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014

RENARDET S.A. & PARTNERS Page 44

Pre-casting of New Jersey Barriers

Installation of Future Utility Ducts in Progress