Mozambique - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/mz.pdf · 2016. 10....

27
Mozambique

Transcript of Mozambique - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/mz.pdf · 2016. 10....

  • Mozambique

  • Acknowledgments

    The (I)NDC Content Briefs were produced by the Climate Policy

    Team of the World Bank Climate Change Group. The team was led

    by Sebastian Wienges and Ana Bucher under the supervision of

    Stephen Alan Hammer. Detail analysis of country (I)NDC was

    provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation

    components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation

    components). The team is grateful for all comments and

    suggestions received from regional and sector specialists

    regarding the presentation and synthesis of relevant information.

    © 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org

    Climate Policy Team | World Bank Group

  • SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    Introduction      In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WBCPT) has

    reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief

    aims to provide a summary analysis of existing and instead country mitigation and adaptation

    policies and plans, commitments and targets, implementation strategies and sector priorities,

    associated costs and conditionalities, and stated gaps and needs, among other issues. 

          The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions. 

    The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify

    and familiarize with a range of country priorities in terms of sectoral engagement, and needs in

    terms of capacity building, technology transfer, and financing. Based on this comprehensive

    mapping exercise, the WBG will develop a useful, easytouse, and interactive database and briefs

    of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including

    the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks

    (CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices

    (GPs), regions, and country units for the identification of potential development opportunities,

    analytical studies and technical assistance to support countries' implementation of planned policies

    and actions. Indepth summaries of (I)NDCs by sectors and regions will be prepared at a later stage. 

          In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions

    which include preparation of adaptation plans. The Adaptation section of a large number of

    submitted (I)NDCs, aims to increase development planning and scale the ability of countries to

    adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse

    gas emissions development, in a manner that does not threaten sustainable development. In

    addition to requested finance, the implementation of country commitments is largely tied to

    significant amounts of external assistance to support development and execution of adaptation

    plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,

    the process will ensure increased resilience is recognized under the UNFCCC and climate finance

    mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.

    Climate Policy Team | World Bank Group

  • SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    Table of Contents

    I Overall Planning and Preparation Process 

    II  Mitigation

      Economywide Targets

      Economywide Policies

      Mitigation Actions and Policies

    III  Adaptation

      Adaptation Targets

      Adaptation Context

      Adaptation Actions and Policies

    Acronyms

    BAU Business as Usual NAMA Nationally Appropriate MitigationActions

    CIFPPCR Climate Investment Funds  PilotProgram for Climate Resilience

    NAP National Adaptation Plan

    DRM Disaster Risk Management NAPA National Adaptation Programmesof Action

    INDC Intended Nationally DeterminedContributions

    REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries

    LEDS Low Emission DevelopmentStrategy

    LULUCF Land Use and Land Use Changeand Forestry

    |

    |

    |

    Climate Policy Team | World Bank Group

  • SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    Overall Planning and Preparation Process

    How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?

    Political decision of adoption of INDC at:

    Head of state levelCOUNCIL OF MINISTERSMINISTRY OFENVIRONMENT

    Interministerial level

    Parliament COUNCIL OF MINISTERS

    Ministry Level

    Technical development of INDC through a participatory process

    Stakeholder involvement"FINANCIAL SUPPORT BYGEF THROUGH UNEP

    Multisector commisionTECHNICAL SUPPORT BYFRANCE THROUGHEXPERTISE FRANCE"

    Have development benefits been assessed and considered in the planningprocess?

    Are there climate policies and actions already in place/under development?

    LEDS GEF THROUGH UNEP

    NAMAS

    NAPA YES

    Climate Policy Team | World Bank Group

    $N/A (in Billion USD) TOTAL COST OF IMPLEMENTATION (mitigation and adaptation)

  • SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    Existing policies:Pilot Programme for Climate Resilience (PPCR)

    National Adaptation Plan (NAP)

    Second National Communication (SNC)

    National Climate Change Adaptation and Mitigation Strategy (NCCAMS)

    Has the INDC development been supported by a development partner?Technical support YES

    Financial support YES

    Implementation Plans and Needs

    Specific requests for international provision of means of implementation:Technology Transfer YES

    Financial support YES

    Capacity Building YES

    Does the INDC intend the private sector to be involved in theimplementation of the NDC?

    YES

    Are carbon pricing/international market mechanisms intended?YES

    Are there any barriers identified?

    Link list:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    53.4

    n/a

    n/a

    n/a

    23 MtCO2eq

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    Mitigation

    ECONOMY-WIDE TARGETS

    Conditionality: INDC page link

    Unconditional part of mitigation target:Estimated costs for implementation:

    Conditional part of mitigation target:Estimated costs for implementation:

    Conditionality: INDC page link

    Unconditional part of mitigation target:Estimated costs for implementation:

    Conditional part of mitigation target:Estimated costs for implementation:

    Coverage of Gases: CO , CH , N O, (more GHG may be included in the future)

    Other Targets:

    POLICIES:Energy Strategy

    Biofuel Policy and Strategy; Conservation and Sustianbale Use of the Energy from BiomassEnergy Strategy

    Mozambique's Integrated Urban Solid Waste Management Strategy

    TARGET YEAR

    2030TARGET TYPE

    53.4Absolute Emission Reduction

    Compared to BAU (MtCO2eq peryear)

    N/A(in Billion USD)

    COST OFIMPLEMENTATION

    TARGET YEAR

    2024TARGET TYPE

    23Absolute Emission Reduction

    Compared to BAU (MtCO2eq peryear)

    N/A(in Billion USD)

    COST OFIMPLEMENTATION

    2 4 2

  • New and Reneable Energy Development Strategy; Renewable Energy Feed-in-Tariff Regulation

    Master Plan for Natural Gas

    National REDD+ strategy

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    MITIGATION ACTIONS AND POLICIESENERGY

    Policies: INDC page link

    Energy Strategy P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9

  • n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    MITIGATION ACTIONS AND POLICIES

    RENEWABLE

    ENERGY: BIOFUELSPolicies: INDC page link

    Biofuel Policy and Strategy; Conservation and Sustianbale Use of the Energyfrom Biomass Energy Strategy

    P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9

  • n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    MITIGATION ACTIONS AND POLICIES

    GASPolicies: INDC page link

    Master Plan for Natural Gas P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9

  • n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    MITIGATION ACTIONS AND POLICIES

    RENEWABLE

    ENERGYPolicies: INDC page link

    New and Reneable Energy Development Strategy; Renewable Energy Feed-in-Tariff Regulation

    P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Actions: INDC page link

    Renewable energy altas for Mozambique P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9

  • n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    MITIGATION ACTIONS AND POLICIES

    SOLID WASTEPolicies: INDC page link

    Mozambique's Integrated Urban Solid Waste Management Strategy P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Actions: INDC page link

    Build and manage two solid waste landfills with the recovery of methane P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9

  • n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    MITIGATION ACTIONS AND POLICIES

    REDD+Policies: INDC page link

    National REDD+ strategy P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9

  • n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    MITIGATION ACTIONS AND POLICIES

    URBAN

    TRANSPORTActions: INDC page link

    Project of Urban Mobility in the Municipality of Maputo P. 9

    Estimated total costs for implementation:

    Capacity building needs:

    Technology needs:

    Unconditional part of mitigation target:

    Estimated costs for implementation:

    Conditional part of mitigation target:

    Estimated costs for implementation:

    Emission reduction potential:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9

  • N/A

    N/A

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    Adaptation

    ADAPTATION TARGETS

    ADAPTATION CONTEXT

    Existing National Development/Resilience Policies and Plans

    National Communications

    NAPs

    NAPAS YES

    CIF-PPCRs SECOND NATIONAL COMMUNICATION (SNC)

    Sectoral Strategies YES

    Cross-cuttingPILOT PROGRAMME FOR CLIMATERESILIENCE (PPCR)

    Conditionality:

    Unconditional part of adaptation implementation

    Conditional part of adaptation implementation

    Conditional upon international provision of meansof implementation

    YES

    TARGET YEAR

    2030N/A

    (in Billion USD)

    COST OFIMPLEMENTATION

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    n/a

    n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building:

    elaborate and implement a strategy forclimate change education, awarenessraising, communication and publicparticipationbuild national technical and institutionalcapacity to design and manage projects toaccess climate financingoperationalize the nccammimplementation mechanisms namely theknowledge management centre, thenational climate change network and thefinancial mechanism

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    CROSS-CUTTING AREA

    CAPACITY

    BUILDING AND

    KNOWLEDGE

    TRANSFER

    Actions:

    UNCONDITIONAL ACTIONS: INDC page link

    Develop climate resilience mechanisms for infrastructures, urban areasand other human settlements and tourist and coastal zonesAlign the legal and institutional framework with the NCCAMS

    Funder

    Implementing Agency

    Cost Estimation

    CONDITIONAL ACTIONS: INDC page link

    Increase the adaptive capacity of the most vulnerable groupsDevelop and ameliorate the level of knowledge and capacity to act onclimate changeAssess the adaptation technology needs and formulate and implementthe associated plan

    P. 8

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

    http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=8

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    CLIMATE SERVICESActions:

    CONDITIONAL ACTIONS: INDC page link

    Strengthen research and systematic observation institutions for thecollection of data related to vulnerability assessment and adaptation toclimate changePromote the transfer and adoption of clean and climate change resilienttechnologiesStrengthen the institutions to collect and manage data and informationand create a data base about the existent studies and experts

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    AGRICULTURE

    FOOD SECURITY

    Actions:

    CONDITIONAL ACTIONS: INDC page link

    Increase the resilience of agriculture, livestock and fisheries, guaranteeingthe adequate levels of food security and nutrition

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    HEALTH

    MALNUTRITION

    Actions:

    CONDITIONAL ACTIONS: INDC page link

    Increase the resilience of agriculture, livestock and fisheries, guaranteeingthe adequate levels of food security and nutrition

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    DISEASE

    SURVEILLANCE

    AND CONTROL

    Actions:

    CONDITIONAL ACTIONS: INDC page link

    Reduce people’s vulnerability to climate change related vectorbornediseases or other diseases

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    LULUCF/FORESTRY

    SUSTAINABLE

    LAND

    MANAGEMENT

    Actions:

    CONDITIONAL ACTIONS: INDC page link

    Increase the effectiveness of land use and spatial planning (protection offloodplains, coastal and other areas vulnerable to floods)Reduce soil degradation and promote mechanisms for the planting oftrees for local use

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    WATER

    WATER

    MANAGEMENT

    Actions:

    CONDITIONAL ACTIONS: INDC page link

    Improve the capacity for integrated water resources management includingbuilding climate resilient hydraulic infrastructures

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    DISASTER RISK

    MANAGEMENT (DRM)

    EARLY WARNING

    SYSTEM

    Actions:

    CONDITIONAL ACTIONS: INDC page link

    Reduce climate risks through the strengthening of the early warning systemand of the capacity to prepare and respond to climate risks

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer: establish climate insurances

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    DISASTER RELIEF

    AND RECOVERY Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group

  • n/a

    n/a

    Total Implementation Cost for UnconditionalActions: n/a

    Total Implementation Cost for ConditionalActions: n/a

    Technology Transfer:

    Capacity Building: n/a

    SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution

    ADAPTATION ACTIONS AND POLICIES

    ENVIRONMENT

    ECOSYSTEM AND

    BIODIVERSITY

    Actions:

    CONDITIONAL ACTIONS: INDC page link

    Ensure biodiversity’s protection

    Funder

    Implementing Agency

    Cost Estimation

    Total Implementation Cost per Subsector:

    Implementation Needs:

    Climate Policy Team | World Bank Group