Mozambique
-
Acknowledgments
The (I)NDC Content Briefs were produced by the Climate Policy
Team of the World Bank Climate Change Group. The team was led
by Sebastian Wienges and Ana Bucher under the supervision of
Stephen Alan Hammer. Detail analysis of country (I)NDC was
provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation
components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation
components). The team is grateful for all comments and
suggestions received from regional and sector specialists
regarding the presentation and synthesis of relevant information.
© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
Introduction In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WBCPT) has
reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief
aims to provide a summary analysis of existing and instead country mitigation and adaptation
policies and plans, commitments and targets, implementation strategies and sector priorities,
associated costs and conditionalities, and stated gaps and needs, among other issues.
The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions.
The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify
and familiarize with a range of country priorities in terms of sectoral engagement, and needs in
terms of capacity building, technology transfer, and financing. Based on this comprehensive
mapping exercise, the WBG will develop a useful, easytouse, and interactive database and briefs
of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including
the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks
(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices
(GPs), regions, and country units for the identification of potential development opportunities,
analytical studies and technical assistance to support countries' implementation of planned policies
and actions. Indepth summaries of (I)NDCs by sectors and regions will be prepared at a later stage.
In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions
which include preparation of adaptation plans. The Adaptation section of a large number of
submitted (I)NDCs, aims to increase development planning and scale the ability of countries to
adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse
gas emissions development, in a manner that does not threaten sustainable development. In
addition to requested finance, the implementation of country commitments is largely tied to
significant amounts of external assistance to support development and execution of adaptation
plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,
the process will ensure increased resilience is recognized under the UNFCCC and climate finance
mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
Table of Contents
I Overall Planning and Preparation Process
II Mitigation
Economywide Targets
Economywide Policies
Mitigation Actions and Policies
III Adaptation
Adaptation Targets
Adaptation Context
Adaptation Actions and Policies
Acronyms
BAU Business as Usual NAMA Nationally Appropriate MitigationActions
CIFPPCR Climate Investment Funds PilotProgram for Climate Resilience
NAP National Adaptation Plan
DRM Disaster Risk Management NAPA National Adaptation Programmesof Action
INDC Intended Nationally DeterminedContributions
REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries
LEDS Low Emission DevelopmentStrategy
LULUCF Land Use and Land Use Changeand Forestry
|
|
|
Climate Policy Team | World Bank Group
-
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
Overall Planning and Preparation Process
How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?
Political decision of adoption of INDC at:
Head of state levelCOUNCIL OF MINISTERSMINISTRY OFENVIRONMENT
Interministerial level
Parliament COUNCIL OF MINISTERS
Ministry Level
Technical development of INDC through a participatory process
Stakeholder involvement"FINANCIAL SUPPORT BYGEF THROUGH UNEP
Multisector commisionTECHNICAL SUPPORT BYFRANCE THROUGHEXPERTISE FRANCE"
Have development benefits been assessed and considered in the planningprocess?
Are there climate policies and actions already in place/under development?
LEDS GEF THROUGH UNEP
NAMAS
NAPA YES
Climate Policy Team | World Bank Group
$N/A (in Billion USD) TOTAL COST OF IMPLEMENTATION (mitigation and adaptation)
-
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
Existing policies:Pilot Programme for Climate Resilience (PPCR)
National Adaptation Plan (NAP)
Second National Communication (SNC)
National Climate Change Adaptation and Mitigation Strategy (NCCAMS)
Has the INDC development been supported by a development partner?Technical support YES
Financial support YES
Implementation Plans and Needs
Specific requests for international provision of means of implementation:Technology Transfer YES
Financial support YES
Capacity Building YES
Does the INDC intend the private sector to be involved in theimplementation of the NDC?
YES
Are carbon pricing/international market mechanisms intended?YES
Are there any barriers identified?
Link list:
Climate Policy Team | World Bank Group
-
n/a
n/a
53.4
n/a
n/a
n/a
23 MtCO2eq
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
Mitigation
ECONOMY-WIDE TARGETS
Conditionality: INDC page link
Unconditional part of mitigation target:Estimated costs for implementation:
Conditional part of mitigation target:Estimated costs for implementation:
Conditionality: INDC page link
Unconditional part of mitigation target:Estimated costs for implementation:
Conditional part of mitigation target:Estimated costs for implementation:
Coverage of Gases: CO , CH , N O, (more GHG may be included in the future)
Other Targets:
POLICIES:Energy Strategy
Biofuel Policy and Strategy; Conservation and Sustianbale Use of the Energy from BiomassEnergy Strategy
Mozambique's Integrated Urban Solid Waste Management Strategy
TARGET YEAR
2030TARGET TYPE
53.4Absolute Emission Reduction
Compared to BAU (MtCO2eq peryear)
N/A(in Billion USD)
COST OFIMPLEMENTATION
TARGET YEAR
2024TARGET TYPE
23Absolute Emission Reduction
Compared to BAU (MtCO2eq peryear)
N/A(in Billion USD)
COST OFIMPLEMENTATION
2 4 2
-
New and Reneable Energy Development Strategy; Renewable Energy Feed-in-Tariff Regulation
Master Plan for Natural Gas
National REDD+ strategy
Climate Policy Team | World Bank Group
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESENERGY
Policies: INDC page link
Energy Strategy P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: BIOFUELSPolicies: INDC page link
Biofuel Policy and Strategy; Conservation and Sustianbale Use of the Energyfrom Biomass Energy Strategy
P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
GASPolicies: INDC page link
Master Plan for Natural Gas P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGYPolicies: INDC page link
New and Reneable Energy Development Strategy; Renewable Energy Feed-in-Tariff Regulation
P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Actions: INDC page link
Renewable energy altas for Mozambique P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
SOLID WASTEPolicies: INDC page link
Mozambique's Integrated Urban Solid Waste Management Strategy P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Actions: INDC page link
Build and manage two solid waste landfills with the recovery of methane P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
REDD+Policies: INDC page link
National REDD+ strategy P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9
-
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
URBAN
TRANSPORTActions: INDC page link
Project of Urban Mobility in the Municipality of Maputo P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=9
-
N/A
N/A
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
Adaptation
ADAPTATION TARGETS
ADAPTATION CONTEXT
Existing National Development/Resilience Policies and Plans
National Communications
NAPs
NAPAS YES
CIF-PPCRs SECOND NATIONAL COMMUNICATION (SNC)
Sectoral Strategies YES
Cross-cuttingPILOT PROGRAMME FOR CLIMATERESILIENCE (PPCR)
Conditionality:
Unconditional part of adaptation implementation
Conditional part of adaptation implementation
Conditional upon international provision of meansof implementation
YES
TARGET YEAR
2030N/A
(in Billion USD)
COST OFIMPLEMENTATION
Climate Policy Team | World Bank Group
-
n/a
n/a
n/a
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building:
elaborate and implement a strategy forclimate change education, awarenessraising, communication and publicparticipationbuild national technical and institutionalcapacity to design and manage projects toaccess climate financingoperationalize the nccammimplementation mechanisms namely theknowledge management centre, thenational climate change network and thefinancial mechanism
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
CROSS-CUTTING AREA
CAPACITY
BUILDING AND
KNOWLEDGE
TRANSFER
Actions:
UNCONDITIONAL ACTIONS: INDC page link
Develop climate resilience mechanisms for infrastructures, urban areasand other human settlements and tourist and coastal zonesAlign the legal and institutional framework with the NCCAMS
Funder
Implementing Agency
Cost Estimation
CONDITIONAL ACTIONS: INDC page link
Increase the adaptive capacity of the most vulnerable groupsDevelop and ameliorate the level of knowledge and capacity to act onclimate changeAssess the adaptation technology needs and formulate and implementthe associated plan
P. 8
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
http://www4.unfccc.int/submissions/INDC/Published%20Documents/Mozambique/1/MOZ_INDC_Final_Version.pdf#page=8
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
CLIMATE SERVICESActions:
CONDITIONAL ACTIONS: INDC page link
Strengthen research and systematic observation institutions for thecollection of data related to vulnerability assessment and adaptation toclimate changePromote the transfer and adoption of clean and climate change resilienttechnologiesStrengthen the institutions to collect and manage data and informationand create a data base about the existent studies and experts
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
AGRICULTURE
FOOD SECURITY
Actions:
CONDITIONAL ACTIONS: INDC page link
Increase the resilience of agriculture, livestock and fisheries, guaranteeingthe adequate levels of food security and nutrition
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
HEALTH
MALNUTRITION
Actions:
CONDITIONAL ACTIONS: INDC page link
Increase the resilience of agriculture, livestock and fisheries, guaranteeingthe adequate levels of food security and nutrition
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISEASE
SURVEILLANCE
AND CONTROL
Actions:
CONDITIONAL ACTIONS: INDC page link
Reduce people’s vulnerability to climate change related vectorbornediseases or other diseases
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
LULUCF/FORESTRY
SUSTAINABLE
LAND
MANAGEMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Increase the effectiveness of land use and spatial planning (protection offloodplains, coastal and other areas vulnerable to floods)Reduce soil degradation and promote mechanisms for the planting oftrees for local use
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
WATER
WATER
MANAGEMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Improve the capacity for integrated water resources management includingbuilding climate resilient hydraulic infrastructures
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISASTER RISK
MANAGEMENT (DRM)
EARLY WARNING
SYSTEM
Actions:
CONDITIONAL ACTIONS: INDC page link
Reduce climate risks through the strengthening of the early warning systemand of the capacity to prepare and respond to climate risks
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer: establish climate insurances
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISASTER RELIEF
AND RECOVERY Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
-
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Mozambique | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
ENVIRONMENT
ECOSYSTEM AND
BIODIVERSITY
Actions:
CONDITIONAL ACTIONS: INDC page link
Ensure biodiversity’s protection
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group