Moving from Paper to Project

4
Moving from Paper to Project Operationalizing Opportunities Identified During Technology Needs Assessments CTI Side Event, SBSTA 18, 6 June 2003

description

Moving from Paper to Project. Operationalizing Opportunities Identified During Technology Needs Assessments CTI Side Event, SBSTA 18, 6 June 2003. Presenters. - PowerPoint PPT Presentation

Transcript of Moving from Paper to Project

Page 1: Moving from Paper to Project

Moving from Paper to Project

Operationalizing Opportunities Identified During Technology

Needs AssessmentsCTI Side Event, SBSTA 18, 6 June 2003

Page 2: Moving from Paper to Project

Presenters• Mr. William Kojo Agyemang-Bonsu Chairman

of the Expert Group on Technology Transfer and Senior Programme Officer with the Environmental Protection Agency of Ghana

• Mr. Florin Vladu, Programme Officer, Technology with the UNFCCC Secretariat (Father of TT:CLEAR)

• Ms. Susan Wickwire, Chief, Climate Change Capacity Building Unit with the US Environmental Protection Agency

Page 3: Moving from Paper to Project

Panelists• Mr. Kishan Kumarsingh, EGTT Member,

Technical Coordinator, Environmental Management Authority of Trinidad and Tobago, and Co-Chair of the Informal Consultation Group on Technology Transfer

• Mr. Rawleston Moore, EGTT Member and Consultant to the Barbados Ministry of Physical Development and Environment

Page 4: Moving from Paper to Project

Panelists

• Mr. Alan Miller, Team Leader Climate Change and Ozone, Global Environment Facility

• Mr. Ajay Mathur, Team Leader for Climate Change with the World Bank

• Mr. Ronald C. Shiflett, Jr., Executive Director with the International Utility Efficiency Partnerships group within the Edison Electric Institute