RESUME
POST: PIPING SUPERVISOR
PERSONAL PARTICULAR
NAME: : NG PENG NAM (MORGAN)
SEX:∶ MALE
NRIC NO: 590326-08-5159
NATIONALITY: MALAYSIAN
MARITAL STATUS: MARRIED
DATE OF BIRTH: 26 MARCH 1959
CORRESPONDANCE ADDRESS: 68, LADANG CENTRAL PALOH , 86600 PALOH, KLUANG, JOHOR
TELEPHONE CONTACT: +6- 07-7812821 (RES) +6- 017-7833167 (H/P)
HEALTH: EXCELENT
EMAIL ADDRESS; [email protected]
ACADEMIC QUALIFICATION; ENGLISH SECONDARY SCHOOL
LANGGUAGE KNOWN: MANDARINE,MALAY& ENGLISH
WORKING EXPERIENCE AND TECHNICAL KNOWLEDGE。
Twenty years of working experience in following Details
CAREER HISTORY
JGC DONGGI-SENORO LNG PROJECTUOC.Desa Uso,Btui Banggai 94762,Province Of Central Sulawesi . Indonesia
EMPLOYMENT PERIOD: Feb 2014 TO FEB 2015
EMPLOYER: JGC INDONESIA
POSITION: REINSTATEMENT SUPV
PRODUCTS: LNG
ROLE AND RESPONSIBILITY:
1. LINE CHECK AND PREPARE REINSTATEMENT WORK.2. SUPERVISING/ MONITORING THE REINSTATEMENT PUNCH KILLING TEAM.3. SUPERVISE AND CONTROL SUB CONTRACTOR MANPOWER.4. ATTEND DAILY COORDINATUION MEETING.
BINTULU ONSHORE RECEIVING FACILITIES GAS TURBINE COMPRESSOR PROJECT – MURPHY OIL.SARAWAK MALAYSIA
EMPLOYMENT PERIOD: SEPT 2013 TO JAN 2014
EMPLOYER: WELTECH SDN BHD
POSITION: PIPING SUPERVISOR/ LINE CHECKER
PRODUCTS: NATURAL GAS
ROLE AND RESPONSIBILITY:
1 LINE CHECK AND PREPARE PUNCH LIST.2 SUPERVISING/ MONITORING THE PUNCH KILLING TEAM.3 SUPERVISE AND CONTROL SUB CONTRACTOR MANPOWER.4 ATTEND DAILY COORDINATUION MEETING.5 MAKE DAILY REPORT TO PRODUCTION CONTROL.6 ENSURE THE PIPE PRESSURE TEST AS PER SCHEDULE.7 INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.8 COORDINATE WITH OTHER DISCIPLINE.9 EXPIDATE SITE DEVIATION & NON CONFORMANCE 10 SUPERVISE THE FABRICATION SHOP TO ENSURE IT FOLLOW ISO DRAWING11 REVIEW WELDING CONTROL SHEETS PRIOR TO HAND OVER12 TEST PACKAGE COMPILATION ACCONDANCE WITH PROJECT SPECIFICATION
LNG REGASIFICATION PROJECT- LEKAS PETRONAS(P2)MALACCA MALAYSIA
EMPLOYMENT PERIOD: FEB 2013 TO JULY 2013
EMPLOYER: 3OCEAN SDN BERHAD MALACCA MALAYSIA
POSITION: PIPING SUPERVISOR/ LINE CHECKER
PRODUCTS: LIQUIFIED NATURAL GAS
ROLE AND RESPONSIBILITY:
1. LINE CHECK AND PREPARE PUNCH LIST.2. SUPERVISING/ MONITORING THE PUNCH KILLING TEAM.3. SUPERVISE AND CONTROL SUB CONTRACTOR MANPOWER.4. ATTEND DAILY COORDINATUION MEETING.5. MAKE DAILY REPORT TO PRODUCTION CONTROL.6. ENSURE THE PIPE PRESSURE TEST AS PER SCHEDULE.7. INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.8. COORDINATE WITH OTHER DISCIPLINE.9. RESPONSIBLE TO REINSTATEMENT OF ALL TESTED PACKAGE.10. EXPIDATE SITE DEVIATION & NON CONFORMANCE
11. SUPERVISE THE FABRICATION SHOP TO MAKE SURE THE FOLLOW ISO DRAWING12. REVIEW WELDING CONTROL SHEETS PRIOR TO HAND OVER13. TEST PACKAGE COMPILATION ACCONDANCE WITH PROJECT SPECIFICATION
TOKUYAMA POLYCRYSTALLINE SILICON PLANT PROJECTBINTULU SARAWAK EAST MALAYSIA
EMPLOYMENT PERIOD: JUNE 2011 TO JAN 2013
EMPLOYER: SHINKO PLANTECH CO. LTD CONTRACTOR OF CHIYODA SARAWAK SDN BERHAD BINTULU EAST MALAYSIA
POSITION: PIPING SUPERVISOR
PRODUCTS: POLYCRYSTALLINE SILICON
ROLE AND RESPONSIBILITY:
1. SUPERVISE AND CONTROL SUB CONTRACTOR.2. ATTEND DAILY COORDINATUION MEETING.3. MAKE DAILY REPORT TO PRODUCTION CONTROL.4. MAKE SCHEDULE AND PLAN NING.5. INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.6. COORDINATE WITH OTHER DISCIPLINE.7. RESPONSIBLE TO REINSTATEMENT OF ALL TESTED PACKAGE.8. SUPERVISE THE FABRICATION SHOP TO MAKE SURE THE FOLLOW ISO DRAWING9. SUPERVISE AND CONTROL THE INSTALLATION OF S1 CLASS AND C1 CLASS LINE IN THE
PROCESS AREA.(AREA C1 TMP1).
QATAR GAS 3 AND 4 LNG EXPANSION PROJECTMIDDLE EAST QATAR
EMPLOYMENT PERIOD: NOV.01 TO FEB. 28 2010
EMPLOYER: CHIYODA TECHNIP JOINT VENTURE PROJECT
POSITION: PIPING SUPERVISOR / LINE CHECKER
PRODUCTS: PROCESSED LIQUIFIED NATURAL GAS
ROLE AND RESPONSIBILITY:
1. SUPERVISE AND CONTROL SUB CONTRACTOR.2. ATTEND DAILY COORDINATUION MEETING.3. MAKE DAILY REPORT TO PRODUCTION CONTROL.4. MAKE SCHEDULE AND PLAN NING.5. INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.6. COORDINATE WITH OTHER DISCIPLINE.
Tanjung Langsat Terminal One MID/NA-EPCC Project JOHORE MALAYSIA
Employment Period: Feb2009 To August2009
Employer: Dialog Construction Sdn.Bhd
Position: Piping Supervisor, and Punch List Clearing
Oil import and export terminal
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the timely
and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with the
company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a good
and safe condition 7. Coordinating to subcontractor to complete the job 8 Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance
TPC DUNG QUAT REFINERY PROJECT (VIETNAM)
Employment Period: Nov 2007 To Oct 2008
Employer: Technip Consortium JV JGC
Position: Piping Supervisor, and Punch List Clearing ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the timely
and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with the
company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a good
and safe condition7 Coordinating to subcontractor to complete the job8 Responsible for joint walkdown with client for inspection and reinstatement9 Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance
Dolphin Onshore Facility Project MIDDLE EAST (Qatar):-
Employment Period: Nov. 2006 To Nov. 2007
Employer: JGC Middle East FZE
Position: Piping Supervisor, Line Checker
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition 7 Coordinating to subcontractor to complete the job 8 Responsible for joint walkdown with client for inspection and reinstatement
9 Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance Alcan Vietnam Super Pam Facility (Vietnam:-)
Employment Period: May 2006 To Sept. 2006
Employer: VINA OFFSHORE VIETNAM
Position: Piping and Mechanical Supervisor To installed module piping and equipment for Australia aluminiumproject including punch list clearing
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and
Material problem until the client acceptance
Tanjung Bin Power Station, Pontian, Johor (Malaysia:- )
Employment Period: Oct 2005 To May 2006
Employer: Jiwa Harmoni OFFSHORE SDN BHD
Position: Piping and Mechanical Supervisor
To installed piping and all structural material ,Hopper and equipmentROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement
9 Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance
BAKP B. M2, M3 MSF and Flare Broom SarawakEAST Malaysia
Employment period: March 2005 To Oct. 2005
Employer: BROOKE DOCKYARD & Engineering Work
Position: Piping and Mechanical Supervisor.
To fabricate all piping and support to installed on Moduleincluding installation of equipment and punch list clearing
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement
PRR OIL AND GAS Project.GPPI Shut Down.Terengganu Malaysia:-
Employment period: Sept. 2004 To Feb 2005
Employer: Sinocan Engineering Sdn. Bhd.
Position . Piping supervisor
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition 7 To apply hot work permit
8 Daily tool box talk before start work
DRAGON OIL COMPANY. LAM21. OFF SHORE. TUKISMINISTANEmployment Period: Jan 2004 To Aug 2004
Employer: First Gas Engineering Sdn Bhd
Position: Construction supervisor.
To installed new structure, platform and piping on top of existing platformon LAM 21
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition 7 To apply hot work permit daily
8 Daily tool box talk before start work
Guntong F & Iron Barat C Topsides. Johore. (Malaysia )
Employment Period: Jan 2003 To Nov 2003
Employer: First Gas Engineering Sdn Bhd
Position: Piping and Mechanical Supervisor.
To fabricate all piping and support to installed on Module including installation of equipment and punch list clearing
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition 7. Responsible for joint walkdown with main contractor and client for inspection and
reinstatement8. Responsible for re-instatement and coordinating to engineering to some modification and
Material problem until the client acceptance
BASF PETRONAS BDO PROJECT – GEBENG KUANTAN MALAYSIA:
Employment Period: Feb 2002 To Dec 2002
Employer: KVAERNER DIALOG Joint veture Engineering Sdn. Bhd.
Position: Piping Supervisor, and Punch List Clearing
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition 7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and
Material problem until the client acceptance
Malaysia Olefins Project-Kertih Terengganu (Malaysia:-)
Employment Jan 2001 To Jan 2002
Employer: Samsung Engineering Malaysia
Position: Piping and Pre Commissioning Supervisor.
PRE COMMISSIONING, LUBE OIL FLUSHING, STEAM BLOWING, INTERNAL PIPE CLEANING,. RAPTURE BLOWING , COOLING WATER RETURN AND SUPPLY FLUSHING.
ROLE AND RESPONSIBILITY:
1. REVIEW MARK UP P @ I D.2. CHECK WORK BOUNDERIES AS PER P @I D BEFORE WORK EXECUTION.3. COORDINATE WITH SUB CONTRACTOR ON PREPARATION BEFORE WORK COMMENCE.4. CHECK SAFETY CONCERN PRIOR TO WORK EXCECUTION.5. ASSIGN INDIVIDUAL AS WATCH MAN ON AREAS WHICH REQUIRES SAFETY TO
OTHERS.
Centralized Utility Facilities, CUF Kertih Terengganu (Malaysia:-)
Employment Period: NOV1999 To Oct 2000
Employer: FOSTER WHEELER MALAYSIA SND. BHD
Position: Piping Supervisor, and Punch List Clearing
To installed thick wall alloy pipe of HIGH HIGH STEAM and low steam including high pressure testingROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement
9. Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance
Kertih Vinyl Chloride Monomer, Kertih, Terengganu (Malaysia:-)
Employment Period: Feb. 1999 To Sept 1999
Employer: Toyo Engineering Corporation
Position: Piping Supervisor, and Punch List ClearingROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and
Material problem until the client acceptance
MPP PSR-2 Multi Product Pipe Line PSR-2 Melaka ( Malaysia:-
Employment Period: Sept 1996 To /Feb. 1998
Employer: Chiyoda Engineering Malaysia Position: Piping Supervisor and Punch List Clearing
ROLE AND RESPONSIBILITY:
1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the
timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with
the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a
good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and
Material problem until the client acceptance
FAR EAT LIVINGSTON SHIPYARD LIMITIED ( SINGAPORE:-)
Employment Period: Jun 1991 To /Feb. 1995
Employer: SBL PTE LTD SINGAPORE
Position: Piping Foreman
-As foreman to fabrication all piping & structural and installationon oil rig and super tanker including equipment and module piping
JURONG SHIPYARD LIMITED (SINGAPORE:-)
Employment Period: Feb.l 1989 To /Feb. 1991
Employer: Mizu Pte Ltd Singapore
Position: Piping Foreman
-As foreman to fabrication all piping &structural and installation on oil rig and super tanker including equipment and module piping
BALIKPAPAN REFINERY EXPANSION PROJECT- (INDONESIA:-)
Employment period: August 1987 to Dec. 1988
Employer: Bechtel International, Inc.
Position: Piping Foreman
-As foreman to installed all pipe and support and stream tracing at site including punch killing and reinstatement
SHELL OFF SHORE PROJECT F-23 MIRI SARAWAK EASTMALAYSIA
Employment Period: May 1985 To June 1986
Employer: Transerve Pte Ltd. Singapore
Position: FITTER
- As pipe fitter to installed pipe and modification of spool and to installed vessel on hook up platform
JURONG\ ENGINEERING PTE Ltd ( SINGAPORE )
Employment Period: May 1979 To June 1984
Position: FITTER
- Piping and steel fabrication and installation.- Shop fabrication for piping,structural and vessel for oversea products.