2MONTE RIO POWER PLANT
NOV 2001
Monte Rio – Original 3 Dimensional Drawing – Actual Plant
![Page 3: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/3.jpg)
3MONTE RIO POWER PLANT
NOV 2001
Basic Project Specifications – 101 MWe
Owner: Monte Rio Power Corporation, Ltd. Contractors: Energy International, HMV Engineers, Caterpillar
International Power systems, and SEG/AVKEngines: 13 Cat Gensets model 9CM43 manufactured in
Germany, with rated output of 8100 kW @ 514 RPMFuel: 700 cSt/50 C heavy fuel oilApplication: Independent Power Plant to Public UtilityGenerator: 3 Phase synchronous generator 9,758 kVA, 13.8 kV,
60 Hertz Switchyard: 138 kV double bus bar substation, 3 transformers
47/70 MVA ONAN/ONAF, 13.2/138 kV, 2 line bays, control and monitoring
Switchgear: High Voltage, low voltage, control and monitoringWaste Heat Boiler: Exhaust gas fired steam boiler 7493 kg/h (4849 kW)
at 8 bar(g)
![Page 4: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/4.jpg)
4MRPC - Chronological Progress Report
NOV 2001
STAFF LABOR TOTAL STAFF LABOR TOTAL
HMV 97 263 360ENERGY INTER. 2 2CODEMON 43 279 322 2 62 64TERMOTECNICA 2 23 25METAL AMERICA 6 26 32CONELCA 12 49 61CEMEX 11 12 23SECURITY 8 8 8 8TOTAL 833 72
MONTERIO 100 MW POWER PLANTPERSONAL EN OBRA
DAY NIGHTCONTRACTOR
![Page 5: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/5.jpg)
5MRPC - Chronological Progress Report
SITE LOCATION
NOV 2001
![Page 6: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/6.jpg)
6Site Preparation
DEC 2001
![Page 7: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/7.jpg)
7
2001 JAN 2002
MRPC - Chronological Progress Report
![Page 8: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/8.jpg)
8MRPC - Chronological Progress Report
2001 JAN 2002
![Page 9: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/9.jpg)
9MRPC - Chronological Progress Report
2001 FEB 2002
![Page 10: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/10.jpg)
10MRPC - Chronological Progress Report
2001 MAR 2002
![Page 11: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/11.jpg)
11
Base No. 8Base No. 9Base No. 10
MRPC - Chronological Progress Report
2001 MAR 2002
![Page 12: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/12.jpg)
12MRPC - Chronological Progress Report
2001 MAR 2002
![Page 13: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/13.jpg)
13MRPC - Chronological Progress Report
2001 APR 2002
![Page 14: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/14.jpg)
14MRPC - Chronological Progress Report
2001 APR 2002
![Page 15: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/15.jpg)
15MRPC - Chronological Progress Report
2001 MAY 2002
![Page 16: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/16.jpg)
16MRPC - Chronological Progress Report
2001 MAY 2002
![Page 17: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/17.jpg)
17MRPC - Chronological Progress Report
2001 MAY 2002
![Page 18: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/18.jpg)
18MRPC - Chronological Progress Report
2001 JUN 2002
![Page 19: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/19.jpg)
19MRPC - Chronological Progress Report
2001 JUN 2002
![Page 20: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/20.jpg)
20MRPC - Chronological Progress Report
2001 JUN 2002
![Page 21: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/21.jpg)
21MRPC - Chronological Progress Report
2001 JUL 2002
![Page 22: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/22.jpg)
22MRPC - Chronological Progress Report
2001 JUL 2002
![Page 23: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/23.jpg)
23MRPC - Chronological Progress Report
2001 AUG 2002
![Page 24: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/24.jpg)
24MRPC - Chronological Progress Report
2001 AUG 2002
![Page 25: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/25.jpg)
25MRPC - Chronological Progress Report
2001 AUG 2002
![Page 26: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/26.jpg)
26MRPC - Chronological Progress Report
2001 SEP 2002
![Page 27: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/27.jpg)
27MRPC - Chronological Progress Report
2001 SEP 2002
![Page 28: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/28.jpg)
28MRPC - Chronological Progress Report
2001 OCT 2002
![Page 29: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/29.jpg)
29MRPC - Chronological Progress Report
2001 OCT 2002
![Page 30: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/30.jpg)
30MRPC - Chronological Progress Report
2001 OCT 2002
![Page 31: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/31.jpg)
31MRPC - Chronological Progress Report
2001 NOV 2002
![Page 32: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/32.jpg)
32MRPC - Chronological Progress Report
2001 NOV 2002
![Page 33: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/33.jpg)
33MRPC - Chronological Progress Report
2001 NOV 2002
![Page 34: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/34.jpg)
34MRPC - Chronological Progress Report
2001 DEC 2002
![Page 35: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/35.jpg)
35MRPC - Chronological Progress Report
2001 DEC 2002
![Page 36: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/36.jpg)
36MRPC - Chronological Progress Report
2001 DEC 2002
![Page 37: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/37.jpg)
37MRPC - Chronological Progress Report
2001 2002 2003
![Page 38: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/38.jpg)
38MRPC - Chronological Progress Report
JAN 20032001 2002
![Page 39: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/39.jpg)
39MRPC - Chronological Progress Report
FEB 20032001 2002
Testing of Units
![Page 40: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/40.jpg)
40
2001 2002 MAR 2003
MRPC - Chronological Progress Report
Commercial Operations – April 2003
![Page 41: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/41.jpg)
41
1DESCRIPTION UNITITEM QUANTITY
CIVIL WORKS
EARTHMOVING M3 69,015.0
2 PILINGS (3,872 M3 OF CONCRETE) M (linear) 17,400.0
2 CONCRETE 8,616.2
2.1 CONCRETE FOR ENGINE BASES 2,188.02.2 STRUCTURAL CONCRETE 5,108.22.3 CONCRETE FOR INTERNAL ROADS (8,800 M2) 1,320.0
3 REINFORCED STEEL TON 1,212.6
4 METAL STRUCTURES TON 995.2
4.1 METAL STRUCTURE FOR POWERHOUSE TON 620.04.2 STRUCTURES FOR SMOKESTACKS TON 216.24.3 STRUCTURES FOR THE SUB-STATION TON 52.94.4 STRUCTURES FOR SIDING TON 33.94.5 ESTRUCTURE TO SUPPORT SILENCERS TON 7.24.6 PLATFORMS AND LADDERS TON 65.0
M3
M3
M3
M3
MRPC - QUANTITIES OF MATERIALS SUPPLIED
![Page 42: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/42.jpg)
42
5 BUILDINGS M2 6,402.6
5.1 ADMINISTRATIVE BUILDING 455.4
5.3POWER HOUSE
184.0
5.5GATE HOUSE
176.85.6
INCINERATOR ENCLOSURE15.3
5.7SOLID WASTE MATERIAL ENCOLOSURE
26.0
5.9ENCLOSURE FOR SUBESTACION - GUEST HOUSE
60.0
5.12 ENCLOSURE EMERGENCY BATTERYS–POWER HOUSE 17.5
6 PERIMETER FENCING 1,175.0
5.2 GUEST HOUSE 352.1
5.4SUBSTATION
5,008.0
5.8WATER PUMP HOUSE
33.4
5.11 EMERGENCY GENSET ENCLOSURE 43.25.10
FUEL TREATMENT HOUSE
31.0
DESCRIPTION UNITITEM QUANTITYCIVIL WORKS
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M (linear)
MRPC - QUANTITIES OF MATERIALS SUPPLIED
![Page 43: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/43.jpg)
43
1
MECHANICAL ERECTION
PIPING
1.1 PREFABRICATION OF PIPING TON 169.1
2.1 ERECTION OF ENGINES (9CM43-13 UND) TON 1,599.02.2 ERECTION OF GENERATORS (13 UND) TON 455.0
2.4 EXHAUST DUCTS TON 27.7
2.6 VENTILATION DUCTS TON 33.4
2.8 AIR DUCTS TON 3.92.9 BOILER ASH TANK TON 1.42.10 RADIATORS FOR COOLING WATER TON 214.92.11 VENTILATION FANS MECHANICAL ANNEX, FUEL
TREATMENT ENCLOSURE AND OTHERSTON 6.0
2.13 VENTILATION FANS FOR POWER HOUSE TON 89.6
1.2 PIPING ERECTION TON 289.8
2 MECHANICAL ERECTION OF EQUIPMENT TON 2,962.1
2.3 CHIMENEY STACKS (DIAMETER 1,220 MM) TON 129.4
2.5 COMBUSTION DUCTS TON 12.2
2.7 ERECTION AUX. EQUIPMENT SKID MODULES TON 372.5
DESCRIPTION UNITITEM QUANTITY
MRPC - QUANTITIES OF MATERIALS SUPPLIED
![Page 44: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/44.jpg)
44
2.14 DIESEL EMERGENCY GENEREATOR
3 ERECTION OF PROCESS TANKS TON 76.4
TON 3.1DESCRIPTION UNITITEM QUANTITY
MRPC - QUANTITIES OF MATERIALS SUPPLIED
MECHANICAL ERECTION
![Page 45: MONTE RIO POWER PLANT](https://reader033.fdocuments.in/reader033/viewer/2022052317/56814794550346895db4c6f8/html5/thumbnails/45.jpg)
45
1
ELECTRICAL ERECTION
LAYING OF MULTI-CONDUCTOR CABLE 72.9
6 0.3
3 INSTALLATION & ERECTION CABLE TRAYS 3,598.0
2 7.6
4 INSTALLATION GROUNDING SYSTEM CABLE 1/0 2.5
5 INSTALLATION OF CONDIUT & ACCESSORIES 2,600.06 MOVEMENT AND INSTALLATION OF ELECTRIC EQUIPMENT: INCLUDING A LARGE
GROUP OF DIFFERENT EQUIPMENTSUCH AS CURRENT TRANSFORMERS, POWER TRANSFORMERS, VOLTAGE TRANSFORMERS, ISOLATORS, HOUSINGS AND CABINETS, INSTRUMENT PANELS, CONTROL PANELS, SWITCHES, CIRCUIT BREAKERS, ETC., ECT., ETC., THE INDIVIDUAL WEIGHTS OF THIS EQUIPMENT WAS NOT AVAILABLE.
DESCRIPTION UNITITEM QUANTITY
MRPC - QUANTITIES OF MATERIALS SUPPLIED
Km
Km
KmLAYING OF MV CABLE IN CABLE TRAYS
INSTALLATION 600V CABLE MANOCONDUCTOR #3 + 1, 2 AWG
Km
M (linear)M (linear)