Modular V Channel Installation - Linear Drains “V” Channel Installation P.O. Box 8064, Atlanta,...

2
Modular “V” Channel Installation P.O. Box 8064, Atlanta, GA 31106 p: 877.398.8110 f: 877.388.1239 e: [email protected] www.lineardrains.com 1. Excavate a trough along the channel run 2. Insert a timber packer min. 6mm longer and wider than the overall size of the trough 3. Fill in excess excavation with mortar 4. Remove the packing timber 5. Clean out excess mortar and ensure none has fallen into the outlets. Lay out all the component to ensure all parts are present 6. Insert the spigot outlet pieces into the discharge pipes. Mark channels and outlet locations 10. Snap the cut channel into place. Repeat steps 7-10 for the remaining sections. 7. Measure the length of channel required and mark the measurement on the channel with a square. 8. Cut along the marked line with a metal cutting blade. A drop saw is recommended for square cuts 9. Grind off any sharp edges from the cutting 11. Check that the channel is straight and level 12. Remove the channel parts and flip upside down Page 1 of 2

Transcript of Modular V Channel Installation - Linear Drains “V” Channel Installation P.O. Box 8064, Atlanta,...

Modular “V” Channel Installation

P.O. Box 8064, Atlanta, GA 31106p: 877.398.8110 f: 877.388.1239 e: [email protected]

www.lineardrains.com

1. Excavate a trough alongthe channel run

2. Insert a timber packermin. 6mm longer andwider than the overallsize of the trough

3. Fill in excess excavationwith mortar

4. Remove the packingtimber

5. Clean out excess mortarand ensure none has falleninto the outlets. Lay out allthe component to ensure all parts are present

6. Insert the spigot outletpieces into the dischargepipes. Mark channels andoutlet locations

10. Snap the cut channelinto place. Repeat steps 7-10for the remaining sections.

7. Measure the length ofchannel required and markthe measurement on thechannel with a square.

8. Cut along the marked linewith a metal cutting blade.A drop saw is recommendedfor square cuts

9. Grind off any sharpedges from the cutting

11. Check that the channelis straight and level

12. Remove the channel partsand flip upside down

Page 1 of 2

Modular “V” Channel Installation

P.O. Box 8064, Atlanta, GA 31106p: 877.398.8110 f: 877.388.1239 e: [email protected]

www.lineardrains.com

15. Lower the channel intoposition making sure itstays straight

13. Glue on endcapsand joiners usingsilicon or Sikka flex.

14. Run a bead of siliconor Sikka flex along the runwhere the channel is to be permanently fixed.

16. Place heavy objects onchannel until the adhesive has fully cured.

17. Seal the edge of thechannel with a flexiblewaterproof sealant

18. Insert the grates startingfrom one end. Measure thesize of the last grate andcut it to size using a metalcutting blade.

19. Wiped down the gratesto finish the job.