Modular meet Passive

25
MODULAR HOME MEET “PASSIVE”

Transcript of Modular meet Passive

MODULAR HOME MEET PASSIVE

Hello everyone, my name is LP, Im working with a team of experts to deliver the modular passive house for the canadian market.Im going to present my presentation and Im sorry if my english is not good, Ill try my best and I hope youll enjoy my presentation.

New York - the first multiunit building in Manhattan to be built with modular construction

32-stories

Modular affordable housing project in Australia

to Modular affordable housing project in Australia,

Modular Passive House - Italy

LAPPLICAZIONE DI PREFABBRICATO SISTEMA continues to capture LINTERESSE DAL building industryarchitects - contractors - fabricators - builders - developpers

WHY?

3 major challenges

Need to improve construction productivitySkilled-labor shortagesIncreased demands for energy-efficiency construction

according with research of American Institute of Architects3 major challenges in the building construction marketFor North America skilled-labor shortages is one of the major reason.

What are the benefits?

. to build prefabricated

Reduce labour costPrefabricated systems simplify the installation process, requiring fewer workers onsite to complete a task.

Because the most complex components are assembled in the manufacturing environment, prefabrication reduces the need for skilled labourers. Skilled trade people need only be used onsite for the final connection of systems

The production process provides that all layers are assembled in the factory including the installation of windows and entrance doors.

Improved Safety By shortening the amount of time spent onsite, labourers are able to get in and out more safely.

Labourers working in a controlled factory environment.A factory-controlled environment also makes it possible to supply components and equipment where the worker needs it, rather than having workers moving parts through an active jobsite.

Minimized Delays Prefabrication minimizes the need for coordination on site because all components are installed within the wall as its being fabricated.

every activity is planned in advance to get an installation process without surprises.

Improved Quality of Finished Project

A major advantage of working in this enclosed environment is that it allows for greater quality control than is possible on a typical job site.

The house panels are delivered closed, ready to receive electrical cable, water and air management systems in pre-fabricated ductwork

in fact . the

The design of the construction details remains the primary value of the production process

. The connection points of the parts are very critical to the proper installation.

especially in the Passive House where the thermal bridges play an important role

CONSTRUCTION DETAILS

to get this kind of result in the construction details is necessary to HAVE KNOWLEDGE of the designed software

PER OTTENERE QUESTO TIPO DI RISULTATO NEI DETTAGLI COSTRUTTIVI E NECESSARIO AVERE PADRONANZA DEL SISTEMA DI PROGETTAZIONE.

PRODUCTION LINE - VIDEO

After drawing the project is translated with the software designed in cardsThese cards are inserted into the Numerical Control MachinesBy pressing a button the machines begin to cut componentsThe components are then assembled abave the special tables that help handling them. The assembled parts are stored ready to delivery

When modular meet passive concept

All new buildings must be Nearly Zero energy buildings by 31 December 2020 EUROPE - Key law

Questa solo una delle ragioni per cui in europa troviamo lo sviluppo o in alcuni casi ladeguamento del processo produttivo per ottenere un prodotto casa ad alte prestazione energetiche e a prezzi contenuti

PASSIVE HOUSE IS ALSO COMFORT In the construction of prefabricated modular Passive House the choice of materials must ensure a super thermal insulation and the adequate breathability.

Choice of building materials and layeringThe material most used is wood that matched with other materials are obtained a proper layering.

VENTILATED WALL* *on-sitelayering of wall materials

WOOD FIBRE PANELS HIGH DENSITYmineral porous plaster* *on-siteWOOD FIBRE insulation low DENSITY

structural wood

osb panelsCavity to accommodate equipmentinsulated with fibre woodPlaster fiberDRYWALL

this is a type of layering.The different types of density of the wood fiber can slow down the thermal transmittance.The natural material that is wood allows to obtain the best possible breathability.The OSB will work as a vapour barrier.About the air barrier we have two options:ventilated wall needs air barrier vapor permeable (purrmeable)we can apply porous plaster (pures plaster)

TIMING FOR 2,000 SQ/FT HOUSE, 2 storiesPROJECT & DESIGN

PRODUCTION IN THE FACTORY2 WEEKS

SITE PREPARATION2 WEEKS

INSTALLATION & FINISHING5 WEEKS

tempistica di realizzazione

the 3 most frequently asked questionsIt is possible to realize the basement?Can I choose the style that I want?How much does it cost?

of course you need to take care the basement insulation to not compromise the performance of the housethere are no technical problems but there are efficiency parameters about solar gainlike a regular home + 25% if Passive.

Thank you!For more information [email protected]

Thank you for your patience, my name is LP and I hope you enjoyed my presentation.