Assembly instructions, Monzon Modular Version 1.0 09/05/2017 Monzon Development AB

Transcript of Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to...

Page 1: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

Assembly instructions,

Monzon Modular Version 1.0

09/05/2017 Monzon Development AB

Page 2: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

2 www.monzon.se

1. GENERAL INFORMATION ABOUT THE PRODUCT ............................................................................................. 4

1.1. MONZON MODULAR (U TRANSOM) – BASIC ITEMS .............................................................................................. 5

1.2. MONZON MODULAR NO LIMIT (PSI TRANSOM) – BASIC ITEMS ............................................................................ 6

1.3. SAFETY AND RESPONSIBILITY ............................................................................................................................ 7

1.4. ATTACHMENT POINTS FOR PERSONAL PROTECTIVE EQUIPMENT (SAFETY LINE) ..................................................... 8

SAFETY HELMETS MUST BE WORN ................................................................................................................................ 8

1.5. THE WEDGE CONNECTION PRINCIPLE ................................................................................................................. 9

1.6. MAINTENANCE ............................................................................................................................................... 10

1.7. LABELLING .................................................................................................................................................... 10

1.8. SIGNS ............................................................................................................................................................ 10

1.9. LOAD CLASSES ACCORDING TO SS-EN 12811-1 ................................................................................................ 11

1.10. COMPONENTS INDEPENDENT OF THE SYSTEM .................................................................................................. 11

1.11. LIMITATIONS TO THESE ASSEMBLY INSTRUCTIONS ............................................................................................ 11

1.12. REPAIRS ........................................................................................................................................................ 11

2. LIST OF COMPONENTS ..................................................................................................................................... 12

3. ASSEMBLY ........................................................................................................................................................ 19

3.1. ASSEMBLY OF BASIC SCAFFOLDING .................................................................................................................. 19

3.1.1 Preparations and criteria before starting assembly. ............................................................................ 19

3.1.1. Erection of the scaffold base .................................................................................................................... 19

3.1.2. Level adjustment .................................................................................................................................... 19

3.1.3. Installing standards in base collars .................................................................................................... 20

3.1.4. Installation of U/PSI transoms ............................................................................................................. 20

3.1.5. Installation of decks .............................................................................................................................. 21

3.1.6. Installation of vertical diagonal bracing ............................................................................................. 21

3.1.7. Installation of guardrails....................................................................................................................... 21

3.1.8. Installation of double guardrails .......................................................................................................... 22

3.1.9. Installation of deck locks for U transoms ........................................................................................... 22

3.1.10. Locking decks/combi decks with PSI transoms ................................................................................ 23

3.1.11. Installation of toe board (U transom system)..................................................................................... 23

3.1.12. Installation of No Limit toe board ........................................................................................................ 24

3.1.13. Installation of wall ties .......................................................................................................................... 25

3.1.14. Tie patterns and vertical diagonal bracing ............................................................................................... 26

3.1.15. Installation of external staircase ......................................................................................................... 29

3.1.16. Complete basic scaffolding ................................................................................................................... 30

3.2. BRIDGING WITH LATTICE BEAM 750 ................................................................................................................. 31

3.3. BRIDGING WITH PSI LATTICE BEAM (ALUMINIUM) ............................................................................................. 33

3.4. OPENINGS IN THE SCAFFOLD ........................................................................................................................... 34

3.5. EXTERNAL CORNERS (NO LIMIT) ..................................................................................................................... 35

3.6. INTERNAL CORNERS (NO LIMIT) ...................................................................................................................... 36

3.7. CORNER (U TRANSOM) .................................................................................................................................... 37

3.8. BRACKETS...................................................................................................................................................... 38

3.9. PSI TRANSOM COUPLERS ................................................................................................................................ 38

3.10. NUMBER OF DECKS IN U TRANSOMS AND U BEAMS ............................................................................................. 40

4. DISMANTLING ................................................................................................................................................... 40

4.1. PREPARATIONS PRIOR TO DISMANTLING ................................................................................................................. 40

Page 3: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

3 www.monzon.se

4.2. IMPLEMENTATION ............................................................................................................................................. 40

5. WEDGE HEAD VERSIONS ................................................................................................................................. 41

6. PERMITTED COMPONENT LOADS ................................................................................................................... 42

6.1. LEDGER/TRANSOM (U/PSI/O) ........................................................................................................................ 42

6.2. ROSETTE COUPLER ......................................................................................................................................... 42

6.3. LEDGER ......................................................................................................................................................... 43

6.4. U TRANSOM.................................................................................................................................................... 43

6.5. PSI TRANSOM ................................................................................................................................................ 43

6.6. PSI TRANSOM, REINFORCED ........................................................................................................................... 44

6.7. U BEAM .......................................................................................................................................................... 44

6.8. U BRACKET .................................................................................................................................................... 44

6.9. DECK ............................................................................................................................................................. 45

6.10. PSI LATTICE BEAM .......................................................................................................................................... 48

6.11. LATTICE BEAM 750 ......................................................................................................................................... 48

6.12. PSI COUPLERS ............................................................................................................................................... 48

6.13. STAIRCASES ................................................................................................................................................... 49

7. PERMITTED LOAD CLASS IN SCAFFOLDING LATTICE ................................................................................... 50

8. LOADS AND HEIGHTS ....................................................................................................................................... 52

8.1. PERMITTED STANDARD LOAD .......................................................................................................................... 52

8.2. STRUCTURE HEIGHTS ...................................................................................................................................... 52

8.3. ANCHORING FORCES ....................................................................................................................................... 52

8.4. MAXIMUM DESIGN FORCE ON THE GROUND ........................................................................................................... 52

9. APPENDICES, SCAFFOLDING ERECTION CHECKLIST. ................................................................................... 53

10. TYPE INSPECTION CERTIFICATE ..................................................................................................................... 54

Page 4: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

4 www.monzon.se

1. General information about the product

Monzon Modular is a modular scaffold made of prefabricated components. Standards, transoms, ledgers, double guardrails and diagonal braces are the basic components in this scaffold. These can be assembled together to create scaffolds with a variety of different widths and lengths. For more flexible construction, there are rosettes on the standards at 0.5 m intervals vertically, which means

that the transom level (the height to the transoms) can be adjusted at 0.5 m intervals. Aluminium, steel decks or combi decks are used as scaffolding decks/decking in the scaffold. These are also available in different lengths and widths that can be combined to create the preferred dimensions. The decks are made of aluminium or galvanised sheet metal. The combi decks are made of aluminium/plywood or aluminium/fibre glass reinforced plastic. Modular is a very flexible scaffold system that is easy to erect and can be used for a variety of applications. This system is particularly well suited to façade scaffolding, unloading towers, mobile scaffolding, weather protection scaffolding, bridges, industrial scaffolding, mobile stages and suspended scaffolding. Modular can be selected with 2 different transom/deck systems, the traditional U transom system and the new PSI transom system known as No Limit, patent pending. The No Limit system is matric based entirely on both length and width measurements, which making it even more flexible. The decks/combi decks are available in 0.25 m and 0.5 m widths and 0.25-3 m lengths. Transoms are available in 0.25-3 m length. The transom profile is known as PSI (ψ).

PSI (ψ)

profile.

Page 5: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

5 www.monzon.se

1.1. Monzon Modular (U transom) – basic items

No. Designation No. Designation

1 Base jack (steel) 13 Toe board pin (steel)

2 Base collar (steel) 14 U staircase (aluminium)

3 Standard (steel) 15 Stair guardrail, single (steel)

4 Ledger (steel) 16 Stair guardrail, double (aluminium)

5 Double guardrail (steel) 17 U access deck (fibreglass)

6 U combi deck (fibreglass) 18 Wall tie (steel)

7 U deck (steel) 19 Double coupler (steel)

8 U transom (steel) 20 U bracket (steel)

9 Deck lock (steel) 21 Lattice beam 750 (aluminium)

10 Diagonal brace (steel) 22 Lattice beam connector (steel)

11 Toe board (timber) 23 U spigot (steel)

12 Toe board (timber) 24

23

1

2

3

4

5

4

6

7 8

9

10

13

12

11

14

16

15

18

19

20

21

22

17

Page 6: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

6 www.monzon.se

1.2. Monzon Modular No Limit (PSI transom) – basic items

No. Designation No. Designation

1 Base jack (steel) 12 PSI staircase (aluminium)

2 Base collar (steel) 13 Stair guardrail, double (aluminium)

3 Standard (steel) 14 Wall tie (steel)

4 Ledger (steel) 15 Double coupler (steel)

5 Double guardrail (steel) 16 PSI bracket (aluminium)

6 PSI combi deck (fibreglass) 17 PSI corner combi deck, 45° (aluminium) 7 PSI combi deck (aluminium) 18 PSI corner combi deck, 90° (aluminium)

8 PSI deck (aluminium) 19 PSI coupler (steel)

9 PSI transom (aluminium) 20 PSI lattice beam (aluminium)

10 PSI transom, reinforced (aluminium)

21 PSI frame (steel)

11 Toe board (aluminium) 22 PSI corner combi deck, variable (aluminium)

23 Internal staircase guardrail (aluminium)

24 PSI connector with spigot (steel)

5 6 18

22

23

0

24

0

1 2

3 4

7

9

8

11

12

0

13

0

14

0

15

0

19

0

17

0

16

0

16

0 20

0

10 21

0

Page 7: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

7 www.monzon.se

1.3. Safety and responsibility

Modular is type examined by the Technical Research Institute of Sweden in accordance with the

requirements in EN 12810, EN-12811 and national regulations.

The system is approved for scaffolding in load class 2-6.

Type examination certificate number 39 44 03.

The components in the system have been developed using the latest 3D-CAD tools, and FE analyses have been carried out during product development process.

FE analysis of ledger/standard connection moment (My+)

FE analysis of double guardrail (load uniformly distributed)

Photos from testing at SP

Page 8: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

8 www.monzon.se

1.4. Attachment points for personal protective equipment (safety line)

Before erecting or dismantling scaffold, it is necessary to ensure that everyone involved has the

correct education/training according to national regulations.

To prevent accidents, a safety line and other safety equipment must be used when the scaffold is

more than two metres high.

Risk of

falling Safety helmets must be worn 3

4 2 1

1. Ledger (steel).

2. In standard.

3. In rosette on standard.

4. In double guardrail (steel)

Safety line and safety harness.

Page 9: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

9 www.monzon.se

1.5. The wedge connection principle

To achieve a scaffold structure that is robust, quick to erect and flexible, Monzon Modular has a

wedge connection consisting a rosette, a wedge-head and a wedge. The rosette has four small

holes and four large holes which make it possible to build in a variety of different directions. To

install the wedge connection, follow steps 1-3 below.

Step 1. Move the wedge-head towards the centre of the standard.

Step 2. Insert the wedge in one of the holes on the rosette (small hole is normally used for U transoms and ledgers).

Step 3. Tap in the wedge using a hammer to achieve a robust connection.

Angles To create a perpendicular scaffold, use the small holes at 90° to one another. Between the small holes is a larger hole which allows 45-60° connection to the rosette. This may be useful for triangular signboard scaffolds or hexagonal towers.

Page 10: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

10 www.monzon.se

1.6. Maintenance

All scaffold components must be inspected carefully before commencing assembly. Scaffold

components which are bent, cracked, buckled, broken or warped are defective and have a dramatic

effect on strength. Under no circumstances may these be used in the scaffold – they must be

discarded. Components should be handled with care during assembly/disassembly, and packing of

the materials on appropriate supports/pallets is recommended in order to minimise transport

damage. If necessary, moving parts such as locking hooks for decks/combi decks and toe board

ends in the No limit system shall be lubricated.

1.7. Labelling

Most components in the Modular system are permanently labelled with MONZON and a combination

of four digits which indicate the month and year in which the part was produced (e.g. MONZON 1701).

Most components also come with stickers indicating the component dimensions.

1.8. Tags

Approved scaffold STOP

No access!

Scaffolding under construction

Client and contact name

Scaffolding contractor

Load class according to SS-EN-12811-1

Max. load, kN/m²

Number of transom layers under load

Handed over on

Inspected and approved

Scaffold number Purpose

Page 11: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

11 www.monzon.se

1.9. Load classes according to SS-EN 12811-1

Load class Uniformly

distributed

load q1 [kN/m²]

Concentrated

load on area 500 x 500

mm

Concentrated

load on area 200 x 200

mm

Partial area load

F1 [kN] F2 [kN]

q2 [kN/m²] Partial area factor ap1

1 0.75 1.5 1 - -

2 1.5 1.5 1 - -

3 2 1.5 1 - -

4 3 3 1 5 0.4

5 4.5 3 1 7.5 0.4

6 6 3 1 10 0.5

Note that no more than one transom layer (deck level) shall be placed under load at the time.

1.10. Components independent of the system

System-independent components such as couplers, bridging beams and scaffold tubes used in

Monzon Modular scaffolding must be type tested according to European standard and meet the

specific requirements presented in this assembly instructions.

1.11. Limitations to these assembly instructions

These assembly instructions do not cover the following points.

• Wind loads greater than 770 N/m²

• Scaffolding lined with winter net, summer net, shrink wrap, Keder tarpaulins or similar.

• Snow loads or ice loads.

• Dynamic loads.

• Scaffolding fitted with weather protection roofs.

Please contact Monzon Sverige AB if additional strength calculations are required.

1.12. Repairs

Some items, such as plywood boards and fibreglass boards in combi decks, can be repaired or

replaced if necessary.

Please contact Monzon Sverige AB for more information on how the repair is to be carried out

and what items can be repaired.

Page 12: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

12 www.monzon.se

2. List of components

Component Size Article number

Base jack (steel) 40, 60, 80 cm 111.040-080

Base jack, swivel (steel) 60, 80 cm 111.061, 111.081

Base collar (steel) 33 cm 201.000

Standard (steel) 50, 100, 150, 200, 250,

300 cm 200.50-300

Standard offshore without

spigot (steel)

50, 100, 150, 200, 300 cm 231.50-300

Spigot for offshore standard

(steel)

50 cm 231.000

Ledger (steel) 039, 50, 073, 75, 100, 109,

125, 140, 150, 157, 175, 200, 207, 225, 250, 257, 300, 307 cm

201.039-307

Double guardrail (steel) 073, 75, 100, 109, 125,

140, 150, 157, 175, 200, 207, 225, 250, 257, 300, 307 cm

217.073-307

Double guardrail (aluminium) 073, 75, 100, 109, 125,

140, 150, 157, 175, 200, 207, 225, 250, 257, 300, 307 cm

251.073-307

U transom (steel) 73 cm 202.073

Page 13: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

13 www.monzon.se

U transom, reinforced (steel) 109, 140 cm 202.109-140

U beam (steel) 157, 207, 257, 307 cm 208.157-307

U transom 15°-45° (steel) 73 cm 202.072

Deck lock (steel) 039, 073, 109, 140, 157,

207, 257, 307 cm 203.039-307

Vertical diagonal brace (steel) 073x200, 075x200,

100x200, 109x200, 125x200, 140x200, 150x200 157x200, 200x200, 207x200, 250x200, 257x200, 300x200, 307x200 cm

204.073-307

U deck 0.32 (steel) 73, 109, 140, 150, 157,

207, 257, 307 cm 308.073-307

U deck 0.19 (steel) 73, 109, 140, 150, 157,

207, 257, 307 cm 319.073-307

U deck 0.32 (aluminium) 73, 109, 140, 150, 157,

207, 257, 307 cm 310.073-307

U combi deck 0.61 (plywood) 73, 109, 140, 150, 157,

207, 257, 307 cm 300.073-307

U combi deck 0.61 (fibreglass) 73, 109, 140, 150, 157,

207, 257, 307 cm 317.073-307

Page 14: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

14 www.monzon.se

U access deck 0.61 (plywood) 257, 307 cm 405.257-307

U access deck 0.61 (fibreglass) 257, 307 cm 417.257-300

O deck 0.3 m (aluminium) 75, 100, 125, 150, 175,

200, 250, 300 cm 311.75-300

O-deck 0.32m (aluminium) 73, 109, 140, 157, 207,

257, 307 cm

309.73-307

Corner combi deck (steel) 036 313.036

Toe board (timber) 73, 109, 140, 157, 207,

257, 307 cm 108.073-307

Toe board (aluminium) 73, 109, 140, 157, 207,

257, 307 cm 118.073-307

End toe board (timber) 73 cm 108.000

Toe board pin (steel) 108.065

U staircase (aluminium) 257x200, 307x200 cm 400.257-307

Page 15: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

15 www.monzon.se

U staircase (aluminium) 160x100 cm 400.100

External staircase guardrail

(steel)

257x200, 307x200 cm 404.257-307

Internal staircase guardrail

(aluminium)

280 cm 412.280

U bracket (steel) 39, 73 cm 206.039-073

Lattice beam 750 (aluminium) 225, 325, 425, 525, 625,

725 cm 901.225-725

Standard-lattice beam

connector (steel)

75 cm 213.075

Lattice beam spigot (steel) 36 cm 500.006

Wall tie (steel) 30, 50, 130 cm 112,030-130

Rosette coupler (steel) 809.023

U transom 073, adjustable

(steel)

73 cm 202.071

Page 16: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

16 www.monzon.se

Bolt with spring lock (steel) 60 mm 500.008

Sole plate 45x450mm (timber) 45x450 mm 830.50

U spigot (steel) 820.000

O spigot (steel) 813.023

PSI transom (aluminium) 25, 50, 75, 100, 125 cm 242.025-300

PSI transom, reinforced

(aluminium)

150, 175, 200, 225, 250, 300 cm

248.150-300

PSI bracket 025 (aluminium) 25 cm 252.025

PSI bracket 50 (aluminium) 50 cm 252.050

PSI bracket 75 (aluminium) 75 cm 252.075

PSI frame 2 m (steel) 200 cm 216.200

Page 17: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

17 www.monzon.se

PSI deck (aluminium) 25, 50, 75, 100, 125, 150, 175, 200, 225, 250, 300 cm

312.25-300

PSI deck (steel) 25, 50, 75, 100, 125, 150,

175, 200, 225, 250, 300 cm

325.025-300

PSI combi deck (aluminium) 50, 75, 100, 125, 150, 200,

250, 300 cm 315.050-300

PSI combi deck (fibreglass) 50, 75, 100, 125, 150, 175,

200, 225, 250, 300 cm 314.050-300

PSI access hatch (fibreglass) 75x100 cm 419.100

PSI corner combi deck, 90°

(aluminium)

25x25, 50x50 cm 313.025-0.50

PSI corner combi deck, 45°

(aluminium)

25x25x45°, 25x50x45°, 25x75x45°

322.025-0.75

PSI corner combi deck, variable

(aluminium)

0.75x0.50 cm 303.050

Toe board (aluminium) 50, 75, 100, 125, 150, 175,

200, 225, 250, 300 cm 252.050-300

PSI lattice beam (aluminium) 250, 300, 400, 500, 600

cm 249.250-600

Page 18: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

18 www.monzon.se

PSI staircase (aluminium) 300x200 cm, 250x200 cm, 150x100 cm, 150x050 cm,

050x150 cm

402.300 402.250 402.100 402.0.50

402.150 External staircase guardrail,

double (aluminium)

250, 257, 300, 307 cm 445.250-307

PSI connector for ledgers (steel) 841.000

PSI connector, double with

spigot (steel)

842.000

PSI connector, single with

spigot (steel)

843.000

PSI connector for tubes (steel) 844.000

Page 19: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

19 www.monzon.se

3. Assembly

3.1. Assembly of basic scaffolding

3.1.1 Preparations and criteria before starting assembly.

Read chapter 1 carefully before starting assembly. Then check that the ground and sole plate have sufficient load-bearing capacity to handle the pressure from the scaffold on the base jacks. Sole plates decks are used to distribute the pressure over a larger area. Also check the ground level and start erection at the highest point, if possible.

3.1.1. Erection of the scaffold base

Position the sole plates, base jacks and base ledgers as shown in the illustration. Make sure that the distance between the wall and the deck is as small as possible, and no greater than 300 mm.

Transoms and ledgers can be laid out on the ground as illustrated to make it easier of positioning the base jacks. Note that base collars and ledgers must always be used at the bottom of the scaffold. If ledgers or standards have to be removed at an entrance or gate, for example, see the section entitled

Bridging areas and openings in the scaffold.

Always use base collars at the bottom of the scaffold.

3.1.2. Level adjustment

Fit ledgers in the small holes on the standard rosettes (see section 1.5 the wedge connection principle). Do not fix the wedges in position until the base jacks have been adjusted so that the ledgers are level. Also check that the angle between longitudinal and transverse ledgers is 90 degrees.

Page 20: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

20 www.monzon.se

Use a spirit level or similar instrument to facilitate level adjustment. Ledges at the base can be replaced with U/PSI transoms if preferred. The standards are moved to the preferred level at intervals of 0.5 m in areas where the ground

slopes more severely. 80 cm base jacks may need to be used here.

Spacings for various base jacks:

40 cm 5-25 cm 60 cm 5-45 cm 80 cm 5-60 cm

3.1.3. Installing standards in base collars

When the wedges on the ledgers are fixed in position, standards or frames are inserted onto the base collars and base jacks as illustrated. Make sure that the standards/frames are inserted all the way onto the base collars. The standard length selected is dependent on the purpose of the scaffold. 3 m standards are normally used in the bottom of the scaffold and shorter standards (0.5 m, 1 m, 1.5 m, 2 m) at the top

of the scaffold in order to reach the right level. Offshore standards with bolted spigots must be used for suspended scaffolds.

3.1.4. Installation of U/PSI transoms

Now install U/PSI transoms as illustrated.

WARNING

Page 21: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

21 www.monzon.se

3.1.5. Installation of decks

Now decks can be mounted on the transverse transoms in the scaffolding level. There are different deck types to choose from – see the list of components and permitted loads.

3.1.6. Installation of vertical diagonal bracing

The vertical diagonals brace is mounted in the large holes on the standard rosettes and on the outside of the ledger as illustrated Note: Check that the standards are vertical before fixing the wedges. Vertical diagonals braces must be mounted in the outer standards and in at least every

fifth bay longitudinally. If double guardrails are used, vertical diagonal braces can be excluded. Note that in this case, it is also necessary to install double guardrails in every other bay 1 metre from the ground, as a minimum.

3.1.7. Installation of guardrails

There are 3 different guardrail options in this scaffold system: Option 1: Ledgers mounted 0.5 m and 1.0 m from the transom layer. Option 2: Guardrail in the form of a double aluminium guardrail.

Option 3: Guardrail in the form of a double steel guardrail.

Risk of falling

Page 22: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

22 www.monzon.se

3.1.8. Installation of double guardrails

Step 1.

Angle the guardrail towards you and insert the lower wedge pin in the holes on the lower standard rosettes.

Step 2.

Rotate the upper guardrail tube towards the standard rosettes,

mount the upper wedges in each standard rosette and then tap the wedges into position using a hammer.

3.1.9. Installation of deck locks for U transoms

Position the deck lock over the transom and pass the hooks down through the corresponding holes in the U transom. Then push the lock sideways so that the hooks lock the deck in position as illustrated. Then rotate the lock plate towards the U transom as illustrated.

Rotate the lock plate

Page 23: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

23 www.monzon.se

3.1.10. Locking decks/combi decks with PSI transoms

The locking arrangement for decks/combi decks in the No Limit system is integrated in the two end pieces of the deck, located on the underside in the form of locking hooks. The locking hooks are pushed into

their locked positions, locking the deck/combi deck to the PSI profile. This is done by rotating the locking hook and pushing it into the end position/locking position for locking hooks. The locking hooks are spring-loaded and can be locked and unlocked as illustrated. During installation, make sure that the locking hooks have been locked and that the decks are firmly in position. Lubricate the locking hooks with grease if necessary and during maintenance.

View from below.

Locking hook, unlocked, Locking hook, locked

3.1.11. Installation of toe board (U transom system)

Start by installing toe board

pins on the standards where toe boards are to be installed. The toe board pins are fixed in position using wedges. The toe boards are then threaded onto the round bars on the pins. Note that the ends and long sides of the scaffold use different toe boards.

Locking hook, locked.

End toe board

Toe board pin

Page 24: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

24 www.monzon.se

3.1.12. Installation of No Limit toe board

No toe board pins are needed when installing toe boards in the No Limit system. One end of the toe board is spring-loaded and the end is locked directly against the standards, as illustrated. Spray grease onto

the moving end piece if necessary and during maintenance.

Page 25: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

25 www.monzon.se

3.1.13. Installation of wall ties

Wall ties are one of the most important parts in a scaffold system. The locations and numbers of ties have a major impact of the load bearing capacity for the scaffold and max scaffold building height. Therefore, always follow the instructions in these assembly instructions or contact Monzon

for more information. Wall ties are normally fitted to all inner standards at every 4 metres of height and beneath the topmost transom layer. Wall ties are normally secured to the scaffold’s inner standards using couplers and are frequently positioned directly beneath the transverse transom. There are a number of different wall plug anchor types, such as eyebolts + plugs, expanding plugs, chemical anchors, anchor bolts, anchor bolts with related angles to metal walls, etc. The plug anchor type to be selected is dependent on the nature of the wall and the requisite pulling force. Eyebolts and plastic plugs are used together with wall ties and fixed couplers in the illustration. Wall ties should be tested using a wall tie tester/dynamometer, in order to be sure of the

extent to which a wall tie can be loaded.

Straight wall tie in a concrete wall.

V-shaped tie must be mounted in order to absorb any horizontal loads that may occur. V-shaped must be mounted on every 5:th pair of standards, and always in the outer bays. If greater horizontal loads may occur – in the case of a cladded scaffold, for example – with wind loads parallel to the façade, the requisite number of straight and V-shaped must be mounted, particularly in the standards nearest to the ends of the scaffold.

V-shape tie

Page 26: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

26 www.monzon.se

3.1.14. Tie patterns and vertical diagonal bracing

Lattice length 307, load class 2-4, 8 sections Lattice length 307, load class 2-4, 8 sections with bridging beams Lattice length 257, load class 5, 8 sections Lattice length 257, load class 5, 8 sections with bridging beams.

Lattice length 207, load class 6, 8 sections

Lattice length 207, load class 6, 8 sections with bridging beams

Bay length 307, width 109, 8 sections, Load class 2-4, with or without 039 brackets on the inside.

Bay length 307, width 109, 8 sections, Load class 2-4 with bridging beams, with or without 039 brackets on the inside.

V tie

Straight tie

Lattice beams 5.25 m.

Opening 6,14 m

Page 27: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

27 www.monzon.se

Bay length 257, width 109, 8 sections, Load class 5.

Bay length 257, width 109, 8 sections, Load class 5 with bridging beams, Height 20.5m.

Lattice beams 4.25m.

Opening 5,14m

V tie

Straight tie

Page 28: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

28 www.monzon.se

Bay length 207, width 109, 8 sections, Load class 6.

Bay length 207, width 109, 8 sections, Load class 6 with bridging beams, Height 18.5m.

Lattice beams 3.25m.

Opening 4,14m

V tie

Straight tie

Page 29: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

29 www.monzon.se

3.1.15. Installation of external staircase

External staircases are mounted as illustrated. External guardrails are mounted on the outside of the staircase, and you can choose between 2 x single guardrails or one double staircase guardrail. You can

install an internal guardrail as a handrail on the inside of the staircase. A ledger is normally installed at the topmost deck level. An O- spigot and a 1.0 m standard are mounted on this ledger, along with shorter ledgers or double guardrails and toe boards to

make an opening – see the illustration. End toe boards are installed at the start and end of the staircases, as illustrated.

Page 30: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

30 www.monzon.se

3.1.16. Complete basic scaffolding

The illustration on the right shows complete basic scaffolding with an external staircase, decks at every transom level, double ledgers as guardrails and toe boards.

Complete basic scaffolding with double guardrails, No Limit decks, toe boards and PSI transoms.

Page 31: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

31 www.monzon.se

3.2. Bridging with lattice beam 750

If bridging is needed, a lattice beam connector artno 213.075 is installed together with lattice beam 750, bolt with spring locks and Ø38mm lattice beam spigots. U standard joints and rosette couplers are mounted in the middle of the beam.

4 x vertical diagonals are mounted on the next deck level, as illustrated.

2 x additional wall ties are mounted on standards adjacent to the opening 2-2.5 m from the ground, as illustrated.

Page 32: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

32 www.monzon.se

A further 4 x vertical diagonals must be installed when scaffolding is erected to greater heights. Contact Monzon for more information.

Page 33: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

33 www.monzon.se

3.3. Bridging with PSI lattice beam (aluminium)

Art No 842.000

PSI connector, double

with spigot

Art No 249

PSI lattice beam

(alu)

Page 34: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

34 www.monzon.se

3.4. Openings in the scaffold

If it is necessary to remove ledgers at the base of the scaffold, you must not remove so many that you leave just “one pair of standards” in place. There must always be

ledgers linking the standards together.

Wrong!

Right!

Page 35: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

35 www.monzon.se

3.5. External corners (No Limit)

External corner 0.75 width, 2 x standards in the corner

External corner 0.75 width with 0.25 bracket, 2 x standards in the corner

External corner 0.75 width with 0.50 bracket, 3/4 x standards in the corner

Standard or 0.75 bracket

PSI transom

View from above

View from above

View from above

Page 36: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

36 www.monzon.se

3.6. Internal corners (No Limit)

Internal corner 0.75 width, 2 x standards in the corner

Internal corner 0.75 width with 0.25 bracket, 2 x standards in the corner

Internal corner 0.75 width with 0.50 bracket and corner combi deck, 2 x standards in the corner

PSI transom PSI transom coupler PSI transom coupler with

standard coupler

+ 1m standard for guardrail.

View from above

PSI transom, PSI transom coupler with standard coupler

+ 1 m standard for guardrail.

View from above

Standard

View from below

View from above

PSI transom coupler with standard joint

+ 1 m standard for guardrail.

Page 37: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

37 www.monzon.se

3.7. Corner (U transom)

External corner 0.73 width, 3 x standards in the corner

External corner 0.73 width, 4 x standards in the corner

Internal corner 0.73 width, 4 x standards in the corner

View from above

View from above

View from above

Standard or 0.73 bracket

Page 38: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

38 www.monzon.se

Internal corner 0.73 width + 0.39 brackets + corner combi deck, 4 x standards in the corner.

3.8. Brackets

If necessary, the scaffold can be made wider using brackets. The brackets can also be adjusted vertically at intervals of 0.5 m. U brackets are available in 0.39 and 0.73 m widths. PSI brackets are available in 0.25, 0.5 and 0.75 m widths.

3.9. PSI connectors

PSI connectors are used as variable attachment points to

ledgers or PSI transoms or standards. These are mounted up on the PSI transoms.

Page 39: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

39 www.monzon.se

PSI transoms and PSI decks have 0.25 m length intervals

which make it possible to combine them and create a range of different configurations, to create a pipe penetration in the deck level, for example. The design of the

decks makes it possible to install transoms/beams between the decks, leaving no spaces between the decks. This is applicable even when brackets are used.

Page 40: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

40 www.monzon.se

3.10. Number of decks in U transoms and U beams

4. Dismantling

4.1. Preparations prior to dismantling

Check that the scaffold has been cleaned and that there are no loose objects on the transom layers. Check that all wall ties are in their correct positions (someone may have removed the ties). Check that all parts of the scaffold are positioned correctly (someone may have removed parts). Cordon off the area around the scaffold so that there is no unauthorised access to the area adjacent to it.

4.2. Implementation The scaffold is then dismantled in reverse order to erection. Make sure you check the parts removed to ensure that they are not:

• Cracked

• Buckled

• Bent

• Broken Any parts damaged must be discarded. The materials should be loaded onto pallets or similar to prevent them being damaged during transportation. Never throw parts down from the scaffold!

0.32

m

0.32

m

0.32

m

0.32

m

0.32

m

0.32

m

0.32

m

0.32

m

0.32

m

0.19

m

2 1 9 8 7 6 5 4 3

307

257

207

157

140

109

073

Deck width [m]

Total number

Len

gth

of

U t

ran

som

/bea

m [

cm]

Example: U beam 257 = 7x 032 + 1x 019 deck

Page 41: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

41 www.monzon.se

5. Wedge head versions

Version 1 (2005-2016)

Version 2 (2017-)

Page 42: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

42 www.monzon.se

6. Permitted component loads

The strength values in the tables are applicable to version 2 wedge heads. Please contact Monzon

for values for version 1.

6.1. Ledger/transom (U/PSI/O)

Moment Vertical shear

force

Normal force Horizontal shear

force

My+max = 771 Nm

My-max = -880 Nm Vmax=25 kN

Nmax = 44.1 kN Vmax = 13.4 kN

Moment

Mz+ = 308 Nm Mz- = 308 Nm

6.2. Rosette coupler

Moment My Vertical force Vz

Mymax = 771 Nm Vz per side = 7.4 kN Vz total (double-sided load)= 15.3 kN

Page 43: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

43 www.monzon.se

6.3. Ledger

6.4. U transom

*) Double-sided load. Permitted load x0.8 is applicable in the case of a single-sided load

6.5. PSI transom

Art. no. 201.xxx length (m)

0.7

3

0.7

5

1.0

0

1.0

9

1.2

5

1.4

0

1.5

0

1.5

7

2.0

0

2.0

7

2.5

0

2.5

7

3.0

0

3.0

7

Distributed load Q (kN/m) 16

.3

16.3

11.5

11.5

6.6

6.6

4.2

4.2

3.3

3.3

2.3

2.3

1.3

1.3

Point load P (kN)

5.8

5.8

4.7

4.7

3.6

3.6

3.0

3.0

2.6

2.6

2.1

2.1

1.7

1.7

Art. no. 202.xxx Transom length (m) 0.73 1.09 1.40

Distributed load Q (kN/m) 18.9* 18.1* 10.5*

Point load P (kN) 8.6 8.7 6.4

Art. no. 242.xxx Transom length (m) 0.5 0.75 1.00 1.25

Distributed load Q (kN/m)

41.1* 31.3* 21.9* 12.2*

Point load P (kN) 13.7 11.4 9.4 7.2

Page 44: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

44 www.monzon.se

*) Double-sided load. Permitted load x 0.8 is applicable in the case of a single-sided load

6.6. PSI transom, reinforced

*) Double-sided load. Permitted load x 0.8 is applicable in the case of a single-sided load

6.7. U beam

*) Double-sided load. Permitted load x 0.8 is applicable in the case of a single-sided load

6.8. U bracket

Art. no. 248.xxx Transom length (m) 1.50 1.75 2.00 2.25 2.50 3.00

Distributed load Q (kN/m)

13.3* 11.4* 9.3* 7.2* 5.1* 3.6*

Point load P (kN) 9.8 8.9 8.0 7.1 6.2 5.1

Art. no. 208.xxx Beam length (m) 1.57 2.07 2.57 3.07

Distributed load Q (kN/m) 16.8* 10.8* 7.4* 3.9*

Point load P (kN) 11.1 6.7 5.5 4.3

U bracket (steel) Art. no. 206.xxx

Load class Bay length [m]

U bracket 3.07 2.57 2.07 1.57 1.40 1.09 0.73

073 3 3 3 3 3 3 3

039 4 5 5 6 6 6 6

Page 45: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

45 www.monzon.se

6.9. Deck

U deck 0.32 (aluminium) for U transom Art. no. 310.xxx Bay length 0.73 1.09 1.40 1.57 2.07 2.57 3.07

Load class 6 6 6 6 5 4 3

U deck 0.32 (steel) for U transom Art. no. 308.xxx Bay length 0.73 1.09 1.40 1.57 2.07 2.57 3.07

Load class 6 6 6 6 6 5 4

U deck 0.19 (steel) for U transom Art. no. 319.xxx Bay length 0.73 1.09 1.40 1.57 2.07 2.57 3.07

Load class 6 6 6 6 6 5 4

PSI bracket (aluminium) Art. no. 252.xxx

Load class Bay length [m]

Bracket 3.00 2.50 2.25 2.00 1.75 1.5 1.25 1.00 0.75 0.50

075 3 3 3 3 3 3 3 3 3 3

050 4 5 5 5 5 6 6 6 6 6

025 6 6 6 6 6 6 6 6 6 6

Page 46: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

46 www.monzon.se

O deck 0.30/0.32 (aluminium) for ledger Art. no. 311.xxx/309.xxx Bay length 0.73 1.09 1.40 1.57 2.07 2.57 3.07

Load class 6 6 6 6 5 4 3

U combi deck 0.61 (fibre glass/plywood) for U transom Art. no. 317.xxx/300.xxx

Bay length 0.73 1.09 1.40 1.57 2.07 2.57 3.07

Load class 4 4 4 4 4 4 3

PSI deck 0.25 (aluminium) Art. no. 312.xxx Bay length 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 3.00

Load class 6 6 6 6 6 6 6 6 5 5 4

PSI deck 0.25 (steel) Art. no. 325.xxx Bay length 0.25 0.50 0.75 1.00 1.25 1.50 2.00 2.50 3.00

Load class 6 6 6 6 6 6 6 5 4

Page 47: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

47 www.monzon.se

PSI combi deck 0.50 (fibre glass) Art. no. 314.xxx Bay length 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.50 3.00

Load class 6 6 6 6 6 5 5 4 3

PSI combi deck 0,50 (aluminium) Art. no. 315.xxx

Bay length 1.00 1.25 1.50 1.75 2.00 2.50 3.00

Load class 6 6 6 5 5 4 3

PSI corner deck 0.25, 45° (aluminium) Art. no. 322.xxx

Length 0.25 0.50 0.75

Load class 4 4 4

PSI corner combi deck 0.25 (aluminium) PSI corner deck (aluminium) Art. no. 313.xxx

Length 0.25 0.50

Load class 4 4

PSI corner combi deck 0.25 (aluminium)

PSI corner deck, variable (aluminium) Art. no. 303.050 Length 0.25 0.50

Load class 4 4

Page 48: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

48 www.monzon.se

6.10. PSI lattice beam

Art. no. 249.xxx

PSI lattice beam (aluminium)

Load type Length (m)

2.5 3 4 5 6 Load distributed evenly (kN/m) 4.4 kN/m 3.93 kN/m 3.0 kN/m 2.4 kN/m 1.67 kN/m

Point load in centre (kN)

The load must be applied via both the upper

and the lower tubes.

8.33 kN 7.5 kN 6.67 kN 6.33 kN 5.67 kN

Max. point load (kN) Load applied via one of the tubes.

2.3 kN 2.3 kN 2.3 kN 2.3 kN 2.3 kN

6.11. Lattice beam 750

Art. no. 901.xxx

Lattice beam 750

(aluminium)

Load type Length (m)

2.25 3.25 4.25 5.25 6.25 7.25 Load distributed evenly (kN/m) 7.5 kN/m 5.95 kN/m 5 kN/m 3.6 kN/m 3.13 kN/m 2.35 kN/m

Point load in centre (kN)

The load must be applied via both the upper and the lower tubes.

12 kN 11.33 kN 9.3 kN 9.3 kN 8.8 kN 8.6 kN

Max. point load (kN)

Load applied via one of the tubes. 4.5 kN 4.5 kN 4.5 kN 4.5 kN 4.5 kN 4.5 kN

6.12. PSI connectors

Art. no. 841.000, 842.000, 843.000, 844.000

PSI connector (steel)

Load type 841.000 843.000 842.000 844.000

Vertical load downwards Vz1 6.8 kN 6.8 kN 6.8 kN 6.8 kN

Vertical load downwards Vz2 - 10 kN 15 kN -

Page 49: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

49 www.monzon.se

6.13. Staircases

Art. no. 400.xxx, 402.xxx

Length (m)

3.07 3.00 2.57 2.50

Distributed load Q

(over entire staircase) (kN/m²)

1.0 1.0 1.0 1.0

Point load P (over an area 125x200 mm) (kN) 1.5 1.5 1.5 1.5

Page 50: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

50 www.monzon.se

7. Permitted load class in scaffolding bay

U deck 0.32 (steel), double-sided U transom/U beam load. Decks installed longitudinally. The values in the table are the permitted load class. Distributed, concentrated and subarea load are included in the calculations for transoms, beams and combi decks in accordance with EN-12811-1.

Length U transom/U beam

Deck length (steel) 0.73 1.09 1.40 1.57 2.07 2.57 3.07

0.73 6 6 6 6 6 5 4

1.09 6 6 6 6 5 4 3

1.40 6 6 5 6 4 4 3

1.57 6 6 5 6 4 3 3

2.07 6 6 4 6 3 3 2

2.57 5 5 4 5 3 3 1.28*

3.07 4 4 3 4 3 3 1.04*

*kN/m²

U decks (steel) 0.32 installed in a section or zigzag, single-sided loading of U transom/U beam. Values in the table, permitted load class. Distributed, concentrated and subarea load are included in the calculations for transoms, beams and combi decks in accordance with EN-12811-1.

Length U transom/U beam

Deck length (steel) 0.73 1.09 1.40 1.57 2.07 2.57 3.07

0.73 6 6 6 6 6 6 5

1.09 6 6 6 6 6 5 4

1.40 6 6 6 6 6 5 3

1.57 6 6 6 6 5 4 3

2.07 6 6 6 6 5 4 3

2.57 5 5 5 5 4 3 3

3.07 4 4 4 4 4 3 2

Page 51: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

51 www.monzon.se

Deck 0.25 (aluminium) for PSI transom. Double-sided loading of PSI transom/PSI beam. Decks installed longitudinally. The values in the table are the permitted load class. Distributed, concentrated and subarea load are included in the calculations for transoms, beams and combi decks in accordance with EN-12811-1.

Length of PSI transom/beam

Length of deck 0.25 (aluminium)

0.75 1.00 1.25 1.50 1.75 2.00 2.50 3.00

0.75 6 6 6 6 6 6 5 4

1.00 6 6 6 6 6 6 4 3

1.25 6 6 6 6 6 5 4 3

1.50 6 6 5 6 5 5 3 3

1.75 6 6 5 5 5 4 3 2

2.00 6 6 5 5 4 4 3 2

2.50 5 5 4 4 4 3 2 1.2*

3.00 4 4 4 4 3 3 2 0.97*

*kN/m²

Deck 0.25 for PSI transom/beam. Decks 0.25 installed in a section or zigzag, single-sided loading of PSI transom/PSI beam. The values in the table are the permitted load class. Distributed, concentrated and subarea load are included in the calculations for transoms, beams and combi decks in accordance with EN-12811-1.

Length of PSI transom/beam

Length of deck 0.25 (aluminium)

0.75 1.00 1.25 1.50 1.75 2.00 2.50 3.00

0.75 6 6 6 6 6 6 6 5

1.00 6 6 6 6 6 6 5 4

1.25 6 6 6 6 6 6 5 4

1.50 6 6 6 6 6 6 4 3

1.75 6 6 6 6 6 5 4 3

2.00 6 6 6 6 6 5 4 3

2.50 5 5 5 5 5 5 3 3

3.00 4 4 4 4 4 4 3 2

Page 52: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

52 www.monzon.se

8. Loads and heights

8.1. Permitted standard load

Permitted standard load

(kN)

Tie spacing (m) 4 2

Without brackets 15.9 24

With bracket 0.39 at all levels, beneath the bracket* 16.7* With bracket 0.39 at all levels, not beneath the bracket 13

8.2. Structure heights

Tie spacing (m) 4 2

Load class 3 4 5 6 4 5 6

Permitted load (kN/m²) 2 3 4.5 6 3 4.5 6

Bay length (m) 3.07 2.07 3.07

Bay width (m) 1.09

Scaffolding deck Steel decking at all levels

Transom layer height, max. (m) 2

Base jacks 60, max. height All

Scaffold height, maximum (m)

- without brackets 46.5 40.5

68.5 58.5 48.5

- with bracket 0.39 at all levels 30.5 24.5 30.5

- with bridging beam, without brackets 30.5 24.5 32.5 18.5

Note that no more than one transom layer (deck level) may be placed under load at any one time.

If a removable rosette coupler is to be used as a replacement fixing point for system-bearing

components, the global load-bearing capacity and permitted standard load may be affected and

special investigation of the load-bearing capacity must be carried out. Please contact Monzon

Sverige AB if necessary.

8.3. Anchoring forces

The maximum design anchoring force perpendicular to the façade is 2.5 kN.

The maximum design anchoring forces at ties that can absorb horizontal forces (V ties) are 4.0

kN and 4.8 kN parallel and perpendicular to the façade, respectively.

Greater wind loads may occur in the case of a cladded scaffold and/or at heights in excess of 24

m, and hence higher anchoring forces may occur.

8.4. Maximum design force on the ground

Is 25 kN/standard, if bracket 25 kN/standard and in the case of bridging 29 kN/standard.

Page 53: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

53 www.monzon.se

9. Appendices, Scaffolding erection checklist.

Scaffold type

Date Performed by

Client Administrator Phone No

A. N

o

.

General Inspection on site Remarks Approved

1 Ground conditions, sole plates and base jacks.

Sufficient load-bearing capacity.

2 Base collars. Installed in accordance with the assembly instructions.

3 Distances to wall. Minimum possible, max. 300 mm

4 Parts installed that are not damaged, bent, cracked, buckled or broken.

Inspected during erection/dismantling.

5 Guardrails. Installed in accordance with the assembly instructions.

6 Toe boards. Installed in accordance with the assembly instructions.

7 Wall ties. Sufficient numbers and installed correctly.

8 Lattice lengths/transom layer heights.

Installed in accordance with the assembly instructions.

9 Horizontal, transverse, vertical brace.

Installed in accordance with the assembly instructions.

10 Static strength calculations. If necessary.

11 Scaffold Tag Properly tagged, correct load class etc.

Page 54: Assembly instructions, Monzon Modular...Monzon Modular scaffolding must be type tested according to European standard and meet the specific requirements presented in this assembly

54 www.monzon.se

10. Type examnination certificate