MODEL CBR - | Cleaver Brooks Boilers | Aurora PumpsCB-8077 07/07 800-250-5883 •...
Transcript of MODEL CBR - | Cleaver Brooks Boilers | Aurora PumpsCB-8077 07/07 800-250-5883 •...
MODEL CBRYour Fully-Integrated Boiler Solutions Provider
Firetube Steam & Hot Water – 125–800 HP - Combination Gas/Oil Firing
Advanced Controls The CB Level Master™, included on high pressure steam
boilers, provides the safest, most reliable low water cutoff
and level control on the market today.
Upgrade the standard burner management control to the CB
Hawk ICS™ a totally Integrated PLC based control system
providing total boiler system control
and advanced communications.
Maximum SafetyThe model CBR is designed as an
integrated package including pres-
sure vessel, burner and controls; all
working together, optimizing safety.
The furnace is placed low within the
vessel affording optimal radiant heat
transfer because of a wider temperature differential (Delta
T) between the surrounding water and furnace and, safety
due to the greater amount of water above the furnaces' top
surface area. Additionally, the CBR's integral air cooled front
head including the burner offers more safety along with ease
of operation, and comfort for the operator.
Lowest EmissionsThe CBR boiler's integral burner design including the latest
advances in combustion technology, delivers a maximum of
60 PPM NOx when burning natural gas, with an optional 30
PPM burner enhancement. The Cleaver-Brooks CBR boiler
is your single source solution for clearing the air with pure
power!
Ease of MaintenanceHinged or davited doors for easy access, our EZ swing fan
and motor assembly not requiring front door opening, inte-
gral burner with AccuLink™ adjustable fuel/air controls, pull
out burner drawer for ease of inspection and adjustment,
retractable oil nozzle all make maintenance a snap.
Flexible OptionsFurther enhancing the CBR is an array of options to value
enrich the already outstanding offering. Things to consider
include the following:
• Select the Cleaver-Brooks parallel positioning actua-
tors in lieu of the standard Acculink@ driver arm sys-
tem to further enhance the outstanding fuel and air
control.
• Select a Cleaver-Brooks variable speed drive for
controlling the primary combustion air fan to substan-
tially reduce electrical costs especially if your boiler
modulates considerably between low and high fire.
• Select a Cleaver-
Brooks modulat-
ing feedwater
valve option to
better control the
boiler's water
level: working in
conjunction with
the standard Level
Master@ control on high pressure steam units.
• Select a Cleaver-Brooks O2 trim system to reduce fuel
consumption based on varying environmental conditions
such as varying barometric pressure, ambient tempera-
ture, etc.
• Select the Cleaver-Brooks Hawk ICS™ boiler man-
agement control. A totally integrated PLC based
control system embodying precise boiler/burner man-
agement, safety, inter connectivity and high powered
communications in a single package!
GAS, OIL, AND GAS/OIL COMBINATIONSModel CBR
HIGHLY ENGINEERED PACkAGE DELIvERS IT ALL...
Two Pass Integral Design • Maintains Velocities
• Optimal radiant & convective heat transfer
• Saves on energy; low operating cost
• Combination Oil/Gas Firing
0˚
15˚N
30˚N
45˚N
60˚N
75˚N
15˚S
30˚S
45˚S
15˚W30˚W45˚W60˚W90˚W 75˚W105˚W120˚W135˚W150˚W165˚W 15˚E 30˚E 45˚E 60˚E 90˚E75˚E 105˚E 120˚E 135˚E 150˚E 165˚E
60˚S
75˚S
Ouargla
Reggane
Comodoro Rivadavia
Neuquen
Alice Springs
Bourke
Cairns
CookKalgoorlie
Mackay
Tennant Creek
Barreiras
Cachimbo
Cuiaba
Porto Velho
Amos
Baker Lake
Churchill
Fort McMurray
Grande Prairie
Inukjuak
Labrador City
Port Radium
Prince Rupert
Rankin Inlet
Saskatoon
Thompson
Timmins
Valdivia
Golmud
Hami
Hotan
Karamay
KashiKorla
Qiemo
Yumen
Aswan
Bakhtaran
Aktyubinsk
Aralsk
Atbassar
Balqash
Rudnyy
Sabhah
Tolanaro
Araouane
Altay
Dalandzadagad
Hovd
Dunedin
Bilma
Alta
Archangelsk
Batagay
Bodaybo
Bratsk
Igarka
Khabarovsk
KirovMagadan
Mirnyj
Murmansk
Nizhnevartovsk
Norilsk
OrolPetropavlovsk-Kamchatskij
Sangar
Syktyvkar
Ulan Ude
Vorkuta
Voronez
Jakutsk
Juzno Sachalinsk
Mecca
Port Elizabeth
Waw
Kiruna
Albuquerque
Butte
Fairbanks
Fort Yukon
Las Vegas
Nome
Provo
Scottsbluff
Unalaska
Kananga
Vologda
Luderitz
KhatangaUst-OlenekVolochankaBarrow
Cordova
Belaja Gora
Djanet
Broome
Carnarvon
Geraldton
Learmonth
Port Hedland
Brandon
Dawson Creek
JuneauFort Chipewyan
Moosonee
Antofagasta
Concepcion
Al Jawf
Talara
Trujillo
Dudinka
Anchorage
Duluth
Reno
Tucson
Twin Falls
Williston
Huambo
Rosario
Adelaide
Melbourne
Sydney
Brisbane
Belem
Belo Horizonte
Campinas
Curitiba
Fortaleza
Goiania
Manaus
Porto Alegre
Recife
Rio De Janeiro
Salvador
Sao Paulo
CalgaryVancouver
BaotouBenxi
Chengdu
FuzhouGuiyang
Harbin
Huangshi
Jilin
Jixi
KaifengLanzhou
Mianyang
Nanning
Saratov
Dukou
Ningbo
Qingdao
Qiqihar
Shanghai
Shantou
Taian
Urumqi
WenzhouWenzhou
Xiamen
Xian
Xining
Xuzhou
Yinchuan
Torshavn
Nantes
Toulouse
Agra
Ahmadabad
Allahabad
Calcutta
Jaipur
Madras
Nagpur
Pune
Surat
Esfahan
Shiraz
Basra
Cork
Sendai
Qaraghandy
ChelyabinskGorkiy
Irkutsk
Izevsk
Kazan
Krasnodar
Krasnojarsk
Kuybyshev
NovosibirskOmsk
PermSverdlovsk
Ufa
Volgograd
Jaroslavl
Umtata
Barcelona
Sevilla Adana
Izmir
Frunze
Lviv
Buffalo
Charlotte
Dallas
Jacksonville
Kansas City
New Orleans
New York
Norfolk
Oakland
Omaha
SeattleSpokane
Ho Chi Minh City
Likasi
Auckland
Baltimore
Birmingham
Bombay
Boulder
Chicago
Cochin
Davao
Fuxin
Hefei
Houston
Los Angeles Memphis
Milwaukee
Minneapolis
Multan
Perth
Philadelphia
Portland
Porto
Rostov
San Diego
San Francisco
Sao Goncalo
Sapporo
St. Louis Taiyuan
Tampa
Tol Yatti
Varanasi
Walvis Bay
YueyangZigong
Taipai
Kabul
Luanda
Canberra
Ponta Delgada
Dhaka
Minsk
Porto Novo
La Paz
Sucre
Brasilia
Yaounde
Praia
Santiago
Bogota
Havana
Copenhagen
Quito
Addis Abbaba
Asmara
Kampala
Port Stanley
Helsinki
Paris
Libreville
GibraltarAthens
Hong Kong
Reykjavik
New Delhi
Jakarta
Tehran
Baghdad
Rome
Phnom Penh
Almaty
Nairobi
Vientiane
Tripoli
Antananarivo
Kuala Lumpur
Bamako
Nouakchott
Mexico City
Ulaanbaatar
Rangoon
Windhoek
Kathmandu
Wellington
Niamey
Abuja
Pyongyang
Oslo
Muscat
Islamabad
Manila
Warsaw
Bucharest
Moscow
Riyadh
Mogadishu
Cape Town
Seoul
Madrid
Colombo
Stockholm
Dar es Salaam
Bangkok
Tunis
Ankara
Ashgabat
Kiev
Washington D. C.
Montevideo
Tashkent
Caracas
GeorgetownParamaribo
Sanaa
Kinshasa
Lusaka
Harare
Algiers
Buenos Aires
Gaborone
Ottawa
Bangui
Beijing
Cairo
Berlin
Accra
Nuuk
Conakry
Dublin
Abidjan
Tokyo
Frunze
Monrovia
Rabat
Maputo
Port Moresby
Asuncion
Lima
Lisbon
Dakar
Freetown
Bloemfontein
Pretoria
Mbabane
Khartoum
Lome
London
Hanoi
N'Djamena
RUSSIA
RUSSIAFINLAND
AUSTRIA
ITALY
SPAIN
SWEDENNORWAY
GERMANY
FRANCE
PORTUGAL
HUNGARYROMANIA
BULGARIA
TURKEY
DENMARK
POLANDBELARUS
UKRAINECZECHSLOVAKIA
GREECE
CYPRUS
NETH.
BELGIUM
IRELAND
SERBIA
ALBANIA
MOLDOVA
LITHUANIALATVIA
ESTONIA
LUX.
MONTENEGRO
BOSNIACROATIASLOVENIA
SWITZ.LIECHT.
MACEDONIA
GREENLAND
ICELAND
U. S. A.
CANADA
MEXICO THE BAHAMAS
CUBA
PANAMA
EL SALVADORGUATEMALA
BELIZEHONDURAS
NICARAGUA
COSTA RICA
JAMAICAHAITI
DOM. REP.
ARGENTINA
BOLIVIA
COLOMBIA
VENEZUELA
PERU
BRAZIL
FRENCH GUIANA
SURINAME
GUYANA
CHILE
ECUADOR
PARAGUAY
URUGUAY
FALKLAND ISLANDS
SOUTH GEORGIA ISLAND
KENYA
ETHIOPIA
ERITREA
SUDAN
EGYPT
NIGER
MAURITANIA
MALI
NIGERIA
SOMALIA
NAMIBIA
LIBYA
CHAD
SOUTH AFRICA
TANZANIA
DEM. REP.OF THE CONGO
ANGOLA
ALGERIA
MADAGASCARMAURITIUS
MOZAMBIQUEBOTSWANA
ZAMBIA
GABON
CENTRAL AFRICANREPUBLIC
TUNISIAMALTA
MOROCCO
UGANDA
SWAZILAND
LESOTHO
MALAWI
BURUNDI
RWANDA
TOGOBENINGHANA
IVORYCOAST
LIBERIA
SIERRA LEONE
GUINEABURKINA
GAMBIA
CAMEROON
SAO TOME & PRINCIPE
ZIMBABWE
CONGO
EQUATORIAL GUINEA
WESTERNSAHARA
DJIBOUTI
SENEGAL
GUINEA BISSAU
CANARY ISLANDS JORDAN
ISRAEL
LEBANON
ARMENIAAZERBAIJAN
GEORGIA KYRGYZSTAN
TAJIKISTAN
KUWAIT
QATAR
U. A. E.
YEMEN
SYRIA IRAQ
IRAN
OMAN
SAUDI ARABIA
RUSSIA
AFGHANISTAN
PAKISTAN
INDIA
CHINA
KAZAKHSTAN
TURKMENISTAN
UZBEKISTAN
MYANMAR
THAILAND
CAMBODIA
NEPAL
BHUTAN
VIETNAM
SRI LANKA
LAOSBANGLADESH
MALAYSIA
PAPUA NEW GUINEA
TIMOR-LESTE
BRUNEI
SINGAPORE
PHILIPPINES
TAIWAN
I N D O N E S I A
JAPAN
MONGOLIA
SOUTH KOREA
NORTH KOREA
AUSTRALIA
NEW ZEALAND
U. K.
NEW CALEDONIA
FIJI
NAURU
TRINIDAD & TOBAGO
ANTIGUA & BARBUDADOMINICA
ST. KITTS & NEVIS
ANGUILLA
ST. VINCENTST. LUCIA
BARBADOSGRENADA
CAPE VERDEISLANDS
FAROE ISLANDS
MONACOSAN
MARINO
VATICANANDORRA
BAHRAIN
COMOROS
SEYCHELLES
MALDIVES
HAWAIIAN ISLANDS
FRENCH POLOYNESIA
SAMOA
KIRIBATI
TONGA
PALAU
MARSHALL ISLANDS
MICRONESIA
GUAM
SOLOMON ISLANDS
VANUATU
ATLANTIC
PACIFIC
PACIFIC
INDIAN
ARCTIC OCEAN
OCEANOCEAN
OCEAN
OCEAN
ARCTIC OCEAN
Worldwide Sales, Services and PartsGo to www.cleaver-brooks.com to find an authorized Cleaver-Brooks representative near you.
• Steam & Hot Water
• Multiple fuel firing including #6 oil
• Intergral Burner Design
- Easily installed package
- Allows interchangeability of burner spare parts for mod-
els CB/CBLE/CBR
- Provides ease of maintenance
- 60Hz standard and 50Hz with no price surcharge
- Minimizes the price add for altitude correction
- Asethetically maintains the same clean lines as custom-
ers have come to associate with our premium model
CB/CBLE/CBW/4WI boilers.
• Corrugated furnace is standard equipment.
• For international applications, containerization from 125–800
HP will reduce delivered-to-jobsite price for large boilers that
would otherwise be shipped on flatracks.
• Enhanced heat transfer through the use of "rifled" tubes
enable Cleaver-Brooks to reduce the number of tubes thus
reducing the overall weight and shell diameters while main-
taining high fuel-to-steam efficiency.
• Fuel-to-steam efficiency on the CBR will be .05% to
1% less efficient than the model CB/4WI/CBLE, 4-Pass
Wetback Boilers but slightly more efficient than Model ICB/
CIW, 3-Pass Wetback Boilers.
"Hospital Quiet" OperationThe secret to the Cleaver-Brooks CBR "hospital quiet" operation is in the integral burner with caseless fan – simply the most quiet in the industry.
2-Pass DesignFeatures and Benefits
CB-8077 07/07
800-250-5883 • [email protected]
BOILER H.P. DIM 125 150 200 250 300 350 400 500 600 700 800
Overall Length (60 PPM system)
A 196.5 199.5 231.5 207 226 258 224 230 266 300 301
Overall Length (30 PPM system)
A 199.5 200.5 233.5 211 228 260 225 234 267 302 303
Overall Width (HW) I 75.5 75.5 75.5 82 82 82 100 100 100 100 100
Overall Width (Steam) I 85 85 85 92 92 92 109 109 109 109 109
Rear Door Swing DD 32 32 32 36 36 36 45 45 45 45 45
Front Door Swing EE 67 67 67 75 75 75 80 80 80 80 80
Tube Removal - Rear FF 139 139 170 143 157 187 147 152 184 217 217
Tube Removal - Front GG 127 127 158 128 142 172 130 135 167 200 200
RATINGS sea level to 3000 feet
Rated Capacity (lbs-steam/hr from and at 212 °F)
4,313 5,175 6,900 8,625 10,350 12,075 13,800 17,250 20,700 24,150 27,600
Btu Output (1000 Btu/hr) 4,184 5,021 6,694 8,368 10,042 11,715 13,389 16,736 20,083 23,430 26,778
EDR steam gross, sq. ft. 17,450 20.920 27,900 34,900 41,850 48,820 55,800 69,750 83,700 97,640 111,600
Dimensions & RatingsAll measurements are provided in inches. Measurements are the same for steam and hot water units except where noted.