Mod 380 is the long term solution for AQ Consider options for an interim solution

5
Mod 380 is the long term solution for AQ Consider options for an interim solution Investigating 3 options Analysis will tell us which are feasible Analysis still being undertaken on these options Use of extended AQ Appeal Process New managed AQ Appeal Process AQ appeal mid year (Apr) Options for mid-year AQ Change

description

Options for mid-year AQ Change. Mod 380 is the long term solution for AQ Consider options for an interim solution Investigating 3 options Analysis will tell us which are feasible Analysis still being undertaken on these options Use of extended AQ Appeal Process - PowerPoint PPT Presentation

Transcript of Mod 380 is the long term solution for AQ Consider options for an interim solution

Page 1: Mod 380 is the long term solution for AQ Consider options for an interim solution

Mod 380 is the long term solution for AQ Consider options for an interim solution Investigating 3 options Analysis will tell us which are feasible Analysis still being undertaken on these options

Use of extended AQ Appeal Process New managed AQ Appeal Process AQ appeal mid year (Apr)

Options for mid-year AQ Change

Page 2: Mod 380 is the long term solution for AQ Consider options for an interim solution

Enhanced AQ Appeals Process

• Extend appeals process to SSPs• Use results of AQ trial Calc as a guide to

largest AQ movers• Use existing AQ mechanisms including re-

confirmation process• Need to ration numbers otherwise this would

cause system constraints • Potential for gaming exists

Page 3: Mod 380 is the long term solution for AQ Consider options for an interim solution

AQ Correction Process

• Once again results of Trial calc could be trigger• Will apply to SSPs• New process to automatically update AQ values

rather than reconfirmation.• Shippers to specify MPRNs that they wish to amend• Xoserve to manage workflow to protect system• Potential for gaming exists

Page 4: Mod 380 is the long term solution for AQ Consider options for an interim solution

Bi-annual AQ Review

• Undertake additional AQ Review April for LSPs and SSPs• Extension of trial Calc• May not include an AQ amendment facility therefore could lack

control• Analysis will take time to complete . Impacts on system capacity• Issues with change effort and costs for a timebound solution• May compromise delivery of full Mod 380 solution• There may be gaming opportunities• Value of the change (How much additional benefit from AQ

correction process and at what cost?)• Stability of SOQ.

Page 5: Mod 380 is the long term solution for AQ Consider options for an interim solution

What Next?

• What do Project Nexus stakeholders value?• Xoserve will continue to analyse the options• BUT – Don’t lose focus on the ‘End game’ • We want to deliver Periodic AQ ASAP• We will start analysis on Project Nexus

requirements as soon as they are defined & signed off