MJOC GEMAC

12
Maryland Emergency Management Agency Maryland Joint Operations Center (MJOC) James E Hamilton, AEM Manager (Acting)

Transcript of MJOC GEMAC

Maryland Emergency Management Agency

Maryland Joint Operations Center

(MJOC)

James E Hamilton, AEM

Manager (Acting)

• 24/7/365 Center staffed by Emergency Management Professionals and Maryland National Guard Soldiers and Airmen.

• Commenced operation 17 September 2003.• Functionality

– Statewide Situational Awareness / COP– State of Maryland Warning Point– Statewide / Centralized Communications Center– Steady-State & Increased Posture EOC

Overview

• All staff required minimum SECRET national security clearance.

• Mandatory training / credentialing program meets training standards for AEM/CEM and A.A.S degree.

Staffing

Maintenance of COP

Watch• WebEOC• CAD Monitoring• Media Monitoring• Public Safety Radio

Monitoring• SITREP/Briefing Review

Operations• Answering Point

– OSFM– MDE– Other?

• Warning Point– NAWAS– EAS

• Coordination– Steady-State EOC– 800MHz Interop– MEMA Regional Program– EOC / Resource

Operations

Fusion

NOC

MDTAP

OTHER

MTA

DHMHSYSCOM

LOCAL

MCAC

MSP

DGS

USCG

MAA

DNRCHART

MDNG

FEMA

MARYLAND JOINT

OPERATIONS CENTER

JTTF

FBI

LE

JTF NCR

COCOM

NGB

JFHQ STATE

MDTA AOC

BWI OPS CTR

INTEL F

USION

DOD E

NTRY

HSIN/S

DHS ALERTS

HSIN-CT

MARC TRAINS

LIGHT RAIL

BUS SYSTEM

METRO

MTA POLICE

SHA/SOC

Intelligence

Discipline SpecificDiscipline Specific

Information Sharing Environment

Distribution of COP

Global SA• Daily Briefing Reports• HSIN-MD

• WebEOC / EMMA

Real-Time SA• Notification

Messaging• NAWAS

• EMnet• WebEOC / EMMA• SITREP / SPOTREP

Dam Break Averted in MarylandFRIDAY, MARCH 09, 2007

OAKLAND, Md. — Workers in this mountain town believed Friday they had averted the threat of a dam break by powering up two giant pumps to lower the reservoir.

Oakland Dam

Oakland Dam

• Problem Identified – Source Identification– Subject Matter Experts – MDE Dam Safety– Divers Deployed – Baltimore County, MD

– Transportation Needed – MDNG

Oakland Dam

• Source Identified – Resolution Needed– Pumps Leased (Pittsburgh)– LE Escort Arranged (MSP / Local LE)

– Helicopter Sling–Load Executed (MDNG)

Oakland Dam

• Maryland Joint Operations Center– (410) 517-3600– [email protected]

• James Hamilton– (410) 517-3646

[email protected]

Contact