MillerCoors Golden MillerCoors Golden Brewery Brewery Sustainability Sustainability Improvement Improvement . Energy Water Waste to Landfill Julie Smith, PE, MS Plant Optimization Engineer Utilities/Technical Services

Transcript of MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability...

Page 1: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

MillerCoors Golden MillerCoors Golden BreweryBrewery

Sustainability ImprovementSustainability Improvement.

EnergyWater

Waste to Landfill

Julie Smith, PE, MSPlant Optimization EngineerUtilities/Technical Services

Page 2: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Agenda• Corporate Goals/Leadership• Brewery Processes • Brewery Utilities• Opportunities• Waste to Landfill• Culture

Brewery Sustainability ImprovementBrewery Sustainability Improvement

Page 3: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Corporate Sustainability GoalsCorporate Sustainability Goals

Energy Usage of 120 MJ/HL by 2015 Electricity Steam Vehicle Fuel

Water Usage of 3.18 HL/HL by 2012 Zero Waste to Landfill by 2015 CO2 Self-Sufficiency of 85% by 2015 50% Reduction in Green House Gas by 2020

Why Sustainability?• Customer Demand• Continue our Business• Save Money• Marketing• Responsibility for Future Generations!

Page 4: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Monthly Indicator*

Mthly ActualMthly Stretch

TargetMthly Budget

TargetActual YTD

2012YTD Stretch Goal YTD Budget STPY % Change

People/Process

Tech

MillerCoors 155 165 173 145 143 154 154 -5.7%

Milwaukee 138 154 156 133 138 140 147 -9.5%

Fort Worth 126 103 105 113 104 105 111 1.9%

Eden 162 175 165 141 156 163 170 -17.1%

Albany 134 142 156 130 132 145 140 -7.5%

Irwindale 118 115 124 123 122 131 130 -5.2%

Trenton 137 160 184 145 143 164 156 -7.1%

Golden 252 288 307 226 215 229 234 -3.5%

Shenandoah 128 109 116 106 99 106 106 -0.3%

Monthly Indicator*

Mthly ActualMthly Stretch

TargetMthly Budget

TargetActual YTD

2012YTD Stretch Goal YTD Budget STPY % Change

People/Process

Tech

MillerCoors 3.86 3.92 4.01 3.82 3.83 3.92 4.07 -6.0%

Milwaukee 3.63 3.68 3.75 4.07 3.85 3.92 4.77 -14.8%

Fort Worth 3.59 3.31 3.38 3.47 3.41 3.48 3.53 -1.8%

Eden 3.46 3.97 4.05 3.34 3.77 3.85 3.91 -14.6%

Albany 3.53 3.54 3.62 3.67 3.60 3.68 3.81 -3.6%

Irwindale 3.36 3.53 3.60 3.69 3.66 3.73 3.73 -1.1%

Trenton 3.56 3.98 4.16 3.56 3.55 3.71 3.76 -5.2%

Golden 5.35 4.85 5.01 4.63 4.56 4.71 4.82 -3.9% NP

Shenandoah 3.82 4.09 4.15 3.86 3.91 3.97 4.09 -5.8%

High Usage

Typical Usage

Reduced Usage

60- 80%

Stretch Reduction >80%

Water (hl/hl) FEWER

Monthly Indicator Monthly/YTD/Budget KPI FEWER - People/ Process & Technology

*Monthly Indicator relative to 2009-2011 usage rates. Linear regression model factors include brewed, packed, weather, rainfall, electrical generation.

Above Upper Target

Nothing Planned - NP

< 60%

Between Stretch &Upper Target

December 2012

Total Energy (MJ/hl) FEWER

SIT Goals

2011 2012 2013 2014 2015

Water 4.07 3.83 3.57 3.38 3.18

Energy 154 143 136 128 120

Page 5: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Brewery Process OverviewBrewery Process Overview

Malting

Brewing

Fermenting

Conditioning

Packaging

Warehousing

Page 6: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Golden Brewery MapGolden Brewery Map

Page 7: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Golden Brewery LayoutGolden Brewery Layout

Aging Cellars, Hop Storage

Malting/Kilns

Packaging/Warehouse/Gov. Cellar

Fermenting

Conditioning

Page 8: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Brewing ProcessBrewing Process

• Mash In• Filter/Lauter• Boil Wort• Chill• Ferment

Page 9: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

FermentingFermenting

• Yeast + Wort = Beer• Maintain

Temperature• Residence Time• CO2• Yeast• To Aging

Page 10: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

ConditioningConditioning• Aging• Filter• Blend• To Packaging

Page 11: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

PackagingPackaging• Bottles, Cans and Kegs• Rinse• Fill• Label• Package• Palletize• To Warehouse

Page 12: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

WarehouseWarehouse

• Store Product• Move Product• Temperature• Docks

Page 13: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Utilities for Brewery OperationsUtilities for Brewery Operations

Power Plant – Co-Generation Coal and Natural Gas Fired Boilers

• 800 LB Steam1) Electricity2) 400 LB Steam3) 50 LB Steam

Ammonia• Steam• Electricity

Plant Air• Steam• Electricity

Water Treatment• Electricity

Wastewater Treatment• Electricity

CO2 Recovery• Electricity

Page 14: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Utilities – Map of Valley

Page 15: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Utilities – Where does the Steam Go?

Page 16: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Resource Savings Opportunities

Steam

Page 17: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 18: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 19: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 20: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Steam Savings Opportunities Steam Savings Opportunities “Low Hanging Fruit”

Leaks Traps Control Valves Pressure Relief Valves

Process Optimization/Team Work Compression Equipment Operation Problem Solving Metering - Short-Interval Control Set Points CIP Times Quality/Efficiency

Projects HVAC Plant Air Refrigeration Brew Kettles

Page 21: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 22: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Plant Air OpportunitiesPlant Air Opportunities Leaks Operations

Compression Equipment Set Points

Small Projects Cabinet Cooling/Pressure Air Shut-Off on Equipment not Operating Low Pressure Uses Condensate Drains Pneumatic Valves and Equipment

Large Projects Decentralization Distribution Headers

Page 23: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

CondensateCondensate

Return Benefits Cost Energy Waste Treatment Water Treatment

Where is it Going? Sewer Stack Steam Leaks

Page 24: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Utilities – Where does the Electricity Go?

Page 25: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Resource Savings Resource Savings OpportunitiesOpportunities

Electricity

Page 26: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Electricity Electricity Savings Savings OpportunitiesOpportunities

Culture Lights Office Equipment Phantom Energy

Process Optimization/Team Work Metering/Short Interval Control CIP Times Pump Control Hard Shut-Downs Operating Strategy Water Usage Quality/Efficiency

Projects Lights Pump VFD’s Controls Equipment Right-Sizing

Facilities Lights HVAC Insulation

No!

Yes!

Page 27: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Electricity Savings OpportunitiesElectricity Savings OpportunitiesMalting Lights ResultsMalting Lights Results

Page 28: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Electricity Savings OpportunitiesElectricity Savings OpportunitiesBOC HVAC Recommissioning ResultsBOC HVAC Recommissioning Results

Page 29: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Electricity Savings OpportunitiesElectricity Savings OpportunitiesPackaging Green Shut-DownPackaging Green Shut-Down

Page 30: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Utilities – Where Does the Water Go?Utilities – Where Does the Water Go?

Page 31: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Resource Savings Opportunities

Water and WastewaterWater and Wastewater

Page 32: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 33: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Savings Opportunities – Water and WastewaterSavings Opportunities – Water and WastewaterSave Water = Save Energy!

“Low Hanging Fruit” Leaks Controls Nozzles

Team Work/Process Optimization Problem Solving Broom Not Hose CIP Times Cleaning Machines Dry Lube Seal Water Quality/Efficiency

Projects• Re-Use

Once-Through Cooling Water Empty Can Rinse Water Reject Can Conveyance

Page 34: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Waste to LandfillWaste to Landfill Currently ReUse or Recycle >98% of Total

Waste• Spent Grain• Yeast• Ethanol Still• Glass• Cans• Single Stream• Industrial (Paper, Cardboard, Stretch Wrap, Metal)

Still, 100 Ton/Month to Landfill (2010)• Goal – Zero Waste in 3 years (or pretty close)• Sort, Label, Color Code• Optimize Collection• Source Reduction

Page 35: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 36: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 37: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Co-Products Golden BreweryCo-Products Golden BreweryBill Coors: “Waste is Just a Resource Out of Place”• Yeast – 12 MM LBS/year• Fuel Grade Ethanol – 2.5 MM gal/year • Spent Grain – 400 MM LBS/year

• All sold locally• Grain Dust

• Malting• Malt Storage• Grain Load-Out• Brew House

Page 38: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Pavilion at Investment Recovery

Employee Sales / Beer Trailer

YOU’RE INVITED TO HELP US MAKE AN IMPACT!

As a first step to make the Golden Brewery “The Largest Zero-Waste-to-Landfill Brewery in the World”,

we need your help to:

•sort recyclables from the trash created at the brewery•paint examples of our new standardized color-coding system of lugers/dumpsters•draw up facts about trash and recycling at our brewery to create a great display

RSVP on the Volunteer Website (https://www.millercoorsvolunteers.com)

What:  Operation Zero Waste CARE & Volunteer Event

When:  Thursday, Sept. 15th  Sorting: 7am – 8:30am

8:30 am – 10am Visit and learn: 1pm – 4pm

Where:  Pavilion at Investment Recovery

What to bring: Pants, long sleeved shirt, PPE (bump-cap, steel-toes, safety-vest, and Kevlar gloves)

Page 39: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 40: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 41: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Culture and PeopleCulture and People

What is Culture?

Page 42: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Culture – What is Culture?Culture – What is Culture?

Definitions: 1.The quality in a person or society that arises from a concern for what is regarded as excellent in arts, letters, manners, scholarly pursuits, etc.2.That which is excellent in the arts, manners, etc.3.A particular form or stage of civilization, as that of a certain nation or period: Greek culture.4.Development or improvement of the mind by education or training.5.The behaviors and beliefs characteristic of a particular social, ethnic, or age group: the youth culture; the drug culture.

Page 43: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

CultureCultureElements for SuccessElements for Success

Leadership Green Teams Education Communication Recognition Projects Score Cards

Page 44: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,

Culture – Green TeamsCulture – Green Teams

Golden Green Team – CAREGolden Green Team – CARE““Committed to Active Responsibility for the Environment”Committed to Active Responsibility for the Environment”

• Established 2006• Lunch and Learn Education• Recycling• Brown Bag Movies• Movie Library• Volunteer Opportunities

• Clear Creek Watershed• Recycling Audit• Holiday Meal – Zero Waste Bin Stewards

Page 45: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,
Page 46: MillerCoors Golden Brewery Sustainability Improvement MillerCoors Golden Brewery Sustainability Improvement. Energy Water Waste to Landfill Julie Smith,