Mike Dudding [email protected] ph 9248 3375 Rob Molloy ...southeastwater.com.au ›...
Transcript of Mike Dudding [email protected] ph 9248 3375 Rob Molloy ...southeastwater.com.au ›...
![Page 1: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/1.jpg)
Managed Aquifer Recharge
1
Mike Dudding [email protected] ph 9248 3375
Rob Molloy [email protected] ph 9248 3467
![Page 2: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/2.jpg)
Applications for MAR
> 1. Water storage
> 2. Reduce evaporation
> 3. Water treatment (mainly micro-biological contaminants)
> 4. Reduce stormwater runoff (WSUD)
> 5. Increase stream baseflow (WSUD)
2
![Page 3: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/3.jpg)
3
Injection wells (ASR)
-70
-60
-50
-40
-30
-20
-10
0
10
20
30
-500 -400 -300 -200 -100 0 100 200 300 400 500
Distance from middle injection bore normal to wellfield axis (m)
Dep
th (m
)
Initial groundwater pressure
Injection bore
Groundwater pressure at end of injection period
Shallow aquifer
Aquitard
Target aquifer system
Ground surface
Mixed injected water and native groundwater too salty for re-use
100% injected water
Decreasing potential for upward leakageInterface between native groundwater and the injected
water/native groundwater mixture
Mixed injected water and native groundwater OK
for re-use
![Page 4: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/4.jpg)
MAR Systems(1)
![Page 5: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/5.jpg)
MAR Systems (2)
![Page 6: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/6.jpg)
MAR in urban water management
urban planning
water supplywastewater
management
Storm water management
MAR
![Page 7: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/7.jpg)
7
Gold Coast ASR
Upper Nepean ASRParamatta Rail Link AR
Yarram ASR
Broken Hill ASR
Alice Spring SAT
Beenyup ASR
Melb ASR MapRossdale ASRMernda ASRMelbourne Water ASRKoo Wee Rup Waste Injection
Neuarper - Apsley ASR
Barwon Downs ASRAnglesea ASRBlack Rock ASR
Warnambool ASR
Angas - Bremer ASRTorrens Linear Park ASRAdelaide Botanical GardensMcLaren Vale ASRCity of Salisbury ASR
SKM Australian MAR ProjectsGold Coast ASR
![Page 8: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/8.jpg)
Three Principles for Successful MAR
> 1. Must have a demand for the water
> 2. Must have a water source
> 3. Must have a suitable aquifer
8
![Page 9: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/9.jpg)
Hydrogeological provinces
![Page 10: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/10.jpg)
10
Cross Section – Essendon to Western Port
Melbourne City
![Page 11: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/11.jpg)
ASR Broad Scale Map – ASR potential
11
Annual Usage
>200 ML
100 to 200 ML
20 to 100 ML
10 to 20 ML
![Page 12: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/12.jpg)
ASR Broad Scale Map
12
![Page 13: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/13.jpg)
MAR for SE Water
> Best Region in Melb for MARo Good availability of source water (stormwater or treated)o Aquifers relatively shallow
> MAR Strategyo Multiple Small to Med scale schemes (<100 ML/year)o Limited capacity for large schemes
• Options include KWR area, and SETP/Frankston area
13
![Page 14: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/14.jpg)
Rossdale ASR
> Demonstration project
> Injection trials completed
> Currently operating under temporary licence
> 10 ML/year scheme
14
![Page 15: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/15.jpg)
15
![Page 16: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/16.jpg)
ASR Investigations at Rossdale GC, Melbourne
16
![Page 17: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/17.jpg)
Rossdale Control Panel and Headworks
17
![Page 18: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/18.jpg)
MAR Project Stages
Stage 0 – Opportunity Assessment» Where is MAR needed (ie sites of supply and demand)?
Stage 1 - Feasibility Assessment» Desk top and/or limited field investigation
Stage 2 – Investigation» Aquifer Exploration, Hydraulic Testing, Sampling,
Environmental Assessment, Regulatory Issues
Stage 3 – Conceptual Design» Numerical Modelling (usually large scheme only)
Stage 4 – Functional Design» Injection and Recovery Trials
Stage 5 – Detailed Design
For small schemes there usually less stages
18
![Page 19: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/19.jpg)
Typical Investigation for Small Scale Scheme> Stage 1: Feasibility and nvestigation
• Identify water source and volumes (opportunity assessment)• Search for bore data from nearby bores (often not available)• Drill one investigation bore (suitable for injection trial)• Short flow test (24 hrs) and water quality sampling• Scope out and cost injection and recovery trial• Commence regulatory approvals• Preliminary design and cost estimate
> Stage 2: Design• Detailed design of connection to water source and demand• Connect site to source water and demand• Conduct injection and recovery trial (up to 1 week if possible)• Finalise design• Submit design for regulatory approval
> Stage 3: Commission Site
19
![Page 20: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/20.jpg)
Typical Costs for Small Schemes (<100 ML/y)
> Stage 1: Feasibility and Investigation• ~$150k
> Stage 2: Design• ~$150k for small scale schemes (<100 ML/year)
> Stage 3: Commission Site• $50k to $100k
20
![Page 21: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/21.jpg)
MAR Economics
21
![Page 22: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/22.jpg)
Cost for alternatives
> Water Cartageo $30 to $40/kL
> Underground Storage Tankso $20 to $40/kL
22
![Page 23: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/23.jpg)
Risk v Cost
23
Ris
k
Cost
Underground storage tanks
Water cartage
MAR
![Page 24: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/24.jpg)
Typical ASR bore layout
24
![Page 25: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/25.jpg)
Key Benefits
> MAR provides storage where land costs are high or is not available (ideal in urban setting)
> Meets challenge of climate change (ie need for urban storages)
> Compatible with Water Sensitive Urban Design
> Costs are comparable with current urban supply
25
![Page 26: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/26.jpg)
ASR Investigations on Gold Coast
26
![Page 27: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/27.jpg)
ASR Investigations on Gold Coast
27
![Page 28: Mike Dudding mdudding@skm.com.au ph 9248 3375 Rob Molloy ...southeastwater.com.au › SiteCollectionDocuments › Business › ... › M… · Managed Aquifer Recharge 1 Mike Dudding](https://reader034.fdocuments.in/reader034/viewer/2022042321/5f0b73cd7e708231d4309693/html5/thumbnails/28.jpg)
Guidelines
28
Victorian technical guidelines for MARwww.smartwater.com.au
National Guidelines have just been released for commentwww.ephc.gov.au/ephc/water_recycling.html