Project Manager: Paul Holt Approx Value: £350,000
Client: Sony Broadcasting and Middlesex University In Association With: LCC Lighting
Completion Date: August 2011 PG Stage Overall Schedule: 12 weeks
Studio House, Ryecroft Street, Ashton-Under-Lyne, Lancashire, OL7 0BY
Tel: 0161 830 0303 web: www.pgstage.co.uk email: [email protected] case study
In association with LCC Lighting and Sony Broadcast, PG Stage worked
with Middlesex University in developing an ambitious project to deliver
state-of-the-art media facilities to its Film, Media and TV Students. This
covered the design and installation of two TV studios – a main TV studio
with bespoke lighting hoists and a second smaller studio with fixed
lighting grid and chromakey infinity area.
There were various demands to fulfil for the main television studio: The
first requirement was that it needed to maximise the floor space
available, which was 150 square metres. It also needed to be dynamic
and flexible to allow for the quick and easy set-up and de-rig of studio
lighting.
The studio has been built to the highest quality of design, equipment and
technology and is set to provide the university with a full range of first
class facilities for its students. Middlesex University Television Production
course leader Roddy Gibson commented on the project, “The studio will
give students a much greater understanding of how real-life production
facilities work, enhancing their prospects of a rewarding career in the
creative media sector,”
For this project PG Stage:
Worked closely with LCC Lighting, Sony Broadcasting and the
University to produce technical drawings to meet the course’s
complex needs as well as the overall budget for the project.
Designed power distribution and DMX systems to meet the
University’s requirements.
Installed electrical containment system, state of the art lighting
grids, motorised hoists and pantographs.
Designed, specified and commissioned bespoke touch-screen
motorised hoist controls to minimise the space used for this
control. This also allowed ease of use as well as digitally
restricting the dynamic loading imposed by the movement of the
hoists.
Installed twin cyclorama track systems to both studios
comprising complete set of black wool serge drapes, Chromakey
cloth and filled cloth cyclorama to allow for a variety of uses for
studios
Live recording in the main TV Studio
Motorised Hoists in the main TV Studio
Middlesex University, Grove Campus
Television Recording Studios-
TV Show Recording Format in Main Studio
7/29/2019 Middlesex University Case Study
http://slidepdf.com/reader/full/middlesex-university-case-study 2/4
Studio House, Ryecroft Street, Ashton-Under-Lyne, Lancashire, OL7 0BY
Tel: 0161 830 0303 web: www.pgstage.co.uk email: [email protected] case study
Middlesex University, Grove Campus
Television Recording Studios
Overall studio view mid-commissioning
-
Motorised hoists and lanterns at high level
7/29/2019 Middlesex University Case Study
http://slidepdf.com/reader/full/middlesex-university-case-study 3/4
Studio House, Ryecroft Street, Ashton-Under-Lyne, Lancashire, OL7 0BY
Tel: 0161 830 0303 web: www.pgstage.co.uk email: [email protected] case study
Hoist at high level with drop suspension from ceiling coordinating with both lighting
and ventilation system
Bespoke motorised hoist control
7/29/2019 Middlesex University Case Study
http://slidepdf.com/reader/full/middlesex-university-case-study 4/4
Studio House, Ryecroft Street, Ashton-Under-Lyne, Lancashire, OL7 0BY
Tel: 0161 830 0303 web: www.pgstage.co.uk email: [email protected] case study
Fixed internally wired grid
Strand Wall Rack 24 Dimmers