MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed...

16
MICOPERI.COM MICOPERI THE ITALIAN EXPERIENCE TECHNOLOGICAL FRONTIER EXPERIENCES OMC 2017

Transcript of MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed...

Page 1: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

MICOPERI THE ITALIAN EXPERIENCE TECHNOLOGICAL FRONTIER EXPERIENCES OMC 2017

Page 2: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

Micoperi is an EPCI contractor that has been working in the Oil and Gas offshore industry for more than 70 years. Based in Ravenna, Italy, Micoperi has subsidiaries all across the Mediterranean, West Africa and Central America. With its versatile fleet and expertise it provides the offshore upstream with the following services:

• Jacket & Topside Installation • Subsea Structures Installation • Rigid Pipelaying • SURF • Diving Services • ROV Services • Decommissioning • Salvage

Since mid 90’s Micoperi has decommissioned and disposed of more than 20 offshore platforms in the Mediterranean Sea. It has a proven capability to undertake offshore platforms and subsea structures abandonment, including single lift solutions. The Company can carry out a complete decommissioning project, including preparation, separation, removal, transportation and recycling/disposal ashore. Rigorous safety and environmental standards comply with our integrated QHSE system and with international, regional and national regulatory requirements.

THE ITALIAN EXPERIENCE MICOPERI SPA - OVERVIEW

Page 3: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

THE ITALIAN EXPERIENCE

The offshore decommissioning encompasses the following: • Plug & Abandonment • Preparation, Separation & Removal • Transportation & Disposal ashore • Segregation & Recycling • Re-use • Site Remediation, Containment & Preservation

As leading installation contractor, Micoperi is mainly focused on the removal and disposal of offshore platforms and subsea structures which are very crucial tasks of the decommissioning process that requires:

• Engineering skills and constructability expertise • Knowledge of rigorous safety and environmental standards • HAZID, HAZOP and detailed risk assessment • Compliance with international, regional and national regulatory requirements

Because of the above the Decommissioning is much more than reverse installation.

THE OFFSHORE DECOMMISSIONING PROCESS

Page 4: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

DECOMMISSIONING OF PLATFORMS IN ITALY IN 1995-2000

1995 – Agip (eni) – Removal, transportation and onshore disposal of the following platforms located offshore Adriatic Sea:

- RMA - PCWA - PCWB - PC25

1997 – Agip (eni) – Removal of Narciso 2 monopod (jacket and topsides) located offshore Gela, transportation and onshore disposal.

THE ITALIAN EXPERIENCE

Page 5: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

DECOMMISSIONING OF PLATFORMS IN ITALY IN 1995-2000

THE ITALIAN EXPERIENCE

Page 6: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

Micoperi enjoys a significant experience in the re-use of the subsea part of obsolete platforms. 1999-2000 – Agip (eni) – #15 Offshore Platforms: Topsides removal & disposal ashore, jackets abandonment at Paguro, offshore Ravenna, of what follows:

PCA PCB PC1 BIS PC26 PC 27 PC 30 RMS 1 RMS 5 RM 4 RM 7 CERVIA 25 ANEMONE MEDE A MEDE B MEDE C

DECOMMISSIONING OF PLATFORMS IN ITALY IN 1995-2000

THE ITALIAN EXPERIENCE

Page 7: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

Such experience is an example of subsea structures abandonment by converting the platform infrastructure into in situ artificial reefs which support the marine life. The jackets were cut in two pieces, repositioned (vertically) and modified by making holes on the bracings to allow the fishes to have lairs inside, with following achievements:

• To avoid/reduce the platform removal costs • To contribute to the productivity of marine ecosystems • To the ecological benefit of increasing the biodiversity of the area • To a destination for sport divers, thanks to the exceptional richness of marine life developed around

the artificial reef • To potentially increase farming and fisheries

“Paguro” was officially defined as "Site of Community Interest " in the “EU Natura 2000 network” and classified as an official nature reserve area of the Italian State.

THE ITALIAN EXPERIENCE DECOMMISSIONING OF PLATFORMS IN ITALY IN 1995-2000

Page 8: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

THE ITALIAN EXPERIENCE DECOMMISSIONING OF PLATFORMS IN ITALY IN 1995-2000

Page 9: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

COSTA CONCORDIA SHIP WRECK REMOVAL

Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation of the maritime history, possible only thanks to the great engineering skills and cutting-edge technology available in the offshore O&G Industry.

THE ITALIAN EXPERIENCE

Chains secure the wreck

Hydraulic jacks pull on cables to tight the ship

Concrete bags

Main platforms

Ship towed away

Page 10: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

Client: Costa Crociere S.p.A. Contract Award: November 2014

THE ITALIAN EXPERIENCE

Isola del Giglio is: • part of the National Park of

Tuscan Archipelago • the greatest marine park of

Europe • one of the Specially Protected

Areas of Mediterranean Importance.

In such a delicate environment, Micoperi has develop further an environmental management approach focused on its continuous monitoring and preservation.

THE SITE REMEDIATION AT ISOLA DEL GIGLIO

Page 11: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

Removal and disposal ashore of the following: Mussels for a total of 4,000 sqm and 40 tonnes

#6 subsea platforms for a total of 5,100 tonnes

THE SITE REMEDIATION AT ISOLA DEL GIGLIO

THE ITALIAN EXPERIENCE

Page 12: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

#11 anchor blocks for a total of 440 tonnes Grout bags for a total of 10,000 sqm and 25,000 tonnes

THE SITE REMEDIATION AT ISOLA DEL GIGLIO

THE ITALIAN EXPERIENCE

Page 13: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

Debris for a total of 132,000 sqm and 4,000 tonnes

Sediment for a total of 42,000 sqm and 8,000 tonnes

THE SITE REMEDIATION AT ISOLA DEL GIGLIO

THE ITALIAN EXPERIENCE

Page 14: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

THE ITALIAN EXPERIENCE

Having worked in a national park forced Micoperi to be extremely sensitive to the marine environment and develop a complex project management system based on continuous monitoring, restoration and preservation. With so many Authorities involved in the project, such as:

• Osservatorio – Italian watchdog nominated by the Government • CIBM – Consorzio Interuniversitario di Biologia Marina • ISPRA – Istituto Superiore per la Protezione e la Ricerca Ambientale • ARPAT – Agenzia Regionale per la Protezione Ambientale della Toscana

Micoperi has become an expert of the safeguard of the marine environment and relevant regulatory compliance.

THE SITE REMEDIATION AT ISOLA DEL GIGLIO

Page 15: MICOPERI · 2018. 6. 7. · Client: Costa Crociere S.p.A. Period: May 2012 – July 2014 Executed in JV with Titan Salvage, it represents the biggest salvage and removal operation

MICOPERI.COM

DECOMMISSIONING OF OMBRINA PLATFORM IN OCTOBER 2017

THE ITALIAN EXPERIENCE

OMBRINA MARE Platform – Removal, Disposal, Segregation and Recycling Client: Rockhopper Italia SPA Location: Offshore Ortona Weight: 160 tonnes Height: 35 m Water Depth: 21 m