Chris White, STFC Daresbury LaboratoryMICE Collaboration Meeting CM32, RAL
MICE RF Power Supplies - Status Report - CM32 February 2012 2
MICE RF Power Supplies - Status Report - CM32 February 2012 3
20 kV PSU to ISIS design
140 uF
29 uF
TH116
20 kV Power Supply for 4616
MICE RF Power Supplies - Status Report - CM32 February 2012 4
Capacitor Charger 20 kV+
Control Crate
PLC Crate
Heater Controller
Grid PSU (300 Vdc)
Screen PSU (600 Vdc)
Screen Pulser(2000 Vdc)
RF solid state amplifier
RF Signal Generator (201 MHz)
4616 Tube
Heater Transformer
Crowbar (Ignitron)
Capacitor 29 uF
Dump Relay
HV Power Supply 20 kVAuxiliary Rack
Earth Switch
Water cooling circuits (4)
Compressed air coolingHV cable
0.95V500A
Grid cable
Screen cable
RF cable RF output (co-ax)
4616 Circuit Enclosure
Resistor bank
38 kV Power Supply for TH116
MICE RF Power Supplies - Status Report - CM32 February 2012
5
Capacitor Charger 40 kV+
Control Crate
PLC Crate
Heater Controller
450V DC Bias PSU
TH116 Tube
Heater Transform
er
Crowbar (Thyratron)
Capacitor 140 uF
Dump Relay
HV Power Supply 38 kVAuxiliary Rack
Earth Switch
Water cooling circuit
Compressed air cooling
HV cable
20V500A
RF input from 4616 (co-ax)
RF output (co-ax)
TH116 Circuit Enclosure
Cathode Modulator
Cooling Fans
Trigger pulse
Resistor bank
MICE RF Power Supplies - Status Report - CM32 February 2012
6
Daresbury Laboratory - Plant Room 1 - RF Test Area
MICE RF Power Supplies - Status Report - CM32 February 2012 7
Cooling Water Systems (DL)
• DL site cooling system decommissioned
• Ex-SRS twin-circuit chiller installed – Demin for amplifiers– Glycol for load
• Now fully operational
MICE RF Power Supplies - Status Report - CM32 February 2012
8
TH116 Circuit #1
• Mechanically complete• New fans fitted• Cathode modulator built• Motorised tuners• Electrical control panel• Heater controller• Safety interlocks • Tested to 1 MW RF output
MICE RF Power Supplies - Status Report - CM32 February 2012 9
Cathode Modulator
• IGBT switch• IGBT control board• Potential divider• Zener diode array
38 kV
Trigger
450Vdc15k
2R733R
From 4616
IGBT
TH116
TH116 CATHODE MODULATOR CIRCUIT
• Fully operational• Second unit now complete
MICE RF Power Supplies - Status Report - CM32 February 2012 10
Circuit tuning motors
MICE RF Power Supplies - Status Report - CM32 February 2012 11
TH116 Electrical Control Panel
• Fan control-gear• Heater controller (thyristor) • Circuit-breakers• Tuning control relays
MICE RF Power Supplies - Status Report - CM32 February 2012 12
TH116 38kV Power Supply
• 2 x 70 μF Capacitors• Crowbar (thyratron)• Control unit• Power module• Dump relay• Earth switch• Charger (40 kV)• Resistors
Crowbar (Thyratron)
HV Resistors HV Capacitors (140 uF) Power Supply Rack (Front)
Crowbar testing
MICE RF Power Supplies - Status Report - CM32 February 2012
13
RF HV Power Supplies - Components
Crowbar (38 kV Thyratron)
TH116 Circuit (lower part)
38 kV PSU – rear view20 kV PSU & Aux. rack – front
view
38 kV PSU – resistor bank
HV PSU Control Unit
38 kV PSU – 1 MW RF output
RF Control & Monitoring System
MICE RF Power Supplies - Status Report - CM32 February 2012
14
Network/ Controls
Rack
VME Crate
Canbus modules
DAC/ADC modules
EPICS Server
Heater Controller
(4616)
450V DC Bias PSU
Digital signals/serial link
4616 & TH116 Aux. Racks
PLC Crate (4616)
Grid PSU (4616)
Analog & digital signals
Heater Controller (TH116)
Analog & digital signals
Analog & digital signals
Interlocks
Panel switches
Water flow
Compressed air pressure
Heater V and I
Heater V and I
Interlocks
Typical I/LPLC Crate (TH116)
Digital signals/serial link
Screen PSU (4616)
Analog signals
Analog signals Enable
Enable
Enable
Enable
Enable
Interlocks
MICE RF Power Supplies - Status Report - CM32 February 2012 15
RF Power Supplies - MICE Hall Layout
Layout of North Mezzanine
Air Conditioning Units
RF Amplifiers
RF Power Supply Racks
RF Network/Control Racks
MICE RF Power Supplies - Status Report - CM32 February 2012 16
TimescaleCurrent work in progress:• RF testing of System #1 with new 4616 and TH116 tubes Nov 11 to
Mar 12
Future work (Step V): time-scales to be confirmed• Assembly of CERN TH116 amplifier (System #2) ---------------------- (July 2012) • Test CERN amplifier at Daresbury ----------------------------------------- (December
2012)• Develop RF Control Systems • Pack & ship complete system #1 to RAL --------------------------------- (January 2013)• Install RF System #1 in MICE Hall ----------------------------------------- (May 2013)• Test complete RF system #1 at RAL -------------------------------------- (September 2013)• Construct & test 4616 #2 amplifier, power supply & controls• Construct & test TH116 #2 power supply & controls• Test complete RF system #2 at DL• Pack & ship system #2 to RAL• Install RF System #2 in MICE Hall• Test complete RF system #2 at RAL
Tasks in red are required for TIARA (deadline in brackets)
MICE RF Power Supplies - Status Report - CM32 February 2012
17
Power Supplies – Construction Status - Step V
RF System #1 built and under test (manually controlled)Work required:• Control & monitoring upgrade for 4616 Screen Pulser (2 kV)• Interface to MICE control system
– Interface to PLC (Siemens S7-200)– Interface to Heater Controller (Eurotherm)
• Interface to Low Level RF and Timing System
RF System #2:• 4616 amplifer circuit refurbishment has started• 20 kV Power Supply rack to be built (some components available, some
ordered)• 4616 Auxiliary rack to be built (components to be ordered)• CERN amplifier at DL – to be assembled when required• Cathode modulator virtually complete• 38 kV Power Supply rack to be built (components to be ordered)• TH116 Auxiliary rack to be built (components to be ordered)• Second dummy load to be procured for use with CERN amplifier (twin output)
4616 Tube & Connections
MICE RF Power Supplies - Status Report - CM32 February 2012 18
Power Supplies – Construction Status - Step VI
RF Systems #3 and #4:
• TH116 amplifier circuit (ex-LBNL): – Mechanical refurbishment complete, tuning motors fitted
– Electrical control panel to be built
• Second CERN amplifier at DL – to be assembled when required
• Cathode modulators to be built
• 4616 amplifer circuit (ex-LBNL) refurbishment has started
• Fourth 4616 amplifier circuit to be purchased
• 20 kV Power Supply racks to be built (some components available)
• 4616 Auxiliary racks to be built (components to be ordered)
• 38 kV Power Supply racks to be built (components to be ordered)
• TH116 Auxiliary racks to be built (components to be ordered)
20 kV PSU and Aux. Rack
MICE RF Power Supplies - Status Report - CM32 February 2012 19
RF Power Supplies
Questions ?
20 kV PSU (front)
38 kV PSU - rear view38 kV PSU Dump Relay & Voltage divider
38 kV PSU – Charger (rear)