Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase •...

31
Metro Highway Program ACEC ORANGE COUNTY AUGUST 2020

Transcript of Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase •...

Page 1: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Metro Highway Program

ACEC ORANGE COUNTY AUGUST 2020

Page 2: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Measure R Highway Projects

Subregional Allocations

$8B CompletedIn Progress

Page 3: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Transit Operating & Maintenance

27%

Transit, First/Last Mile (Capital)

37%

Highway, Active Transportation,

Complete Streets(Capital)

19%

Local Return* / Regional Rail

17%

Metro Rail Operations (5%) ADA Paratranist

Metro Discounts for Seniors and Disabled (2%)

State of Good Repair (2%)

System Connectivity (2%)

System Connectivity

(2%)

Active Transportation

(2%)

Formal Ordinance SubfundsAdministration/Local Return 1.5% off the top*

* 1% Administration to supplement Local Return, increasing the Local Return-Base to 17% of net revenues.

Regional Rail (1%)

Measure M Funding Categories by subfund through 2039

3

$22B

Page 4: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

The picture can't be displayed.

Measure M Projects

4

Page 5: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Measures M Major Highway Projects

Page 6: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Measure M Highway Projects - Subregional

Page 7: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Progress• I-5 HOV Lanes; SR-14 to Parker Road RTL• I-605/South Street Interchange Improvements RTL

• I-710 Early Action Projects (Soundwalls) PS&E & Construction

• SR-57/SR-60 Interchange Improvements PS&E• SR-138 Widening, Rancho Vista Blvd. to Palmdale Blvd. PS&E • SR-138/SR-14 10th Street West Interchange PS&E• SR-138 (Palmdale Blvd.), 5th St. to 10th Street East PS&E• SR-138/SR-14 Avenue M Interchange PS&E• SR-91 WB widening between Shoemaker and I-605 PS&E• SR-72, Whittier Blvd., @Painter and S.F. Springs Rd. PS&E

• SR-60/7th Avenue Interchange Improvements PAED + PS&E• SR-91 Widening, Eastbound, Atlantic to Cherry PAED + PS&E• SR-91/Central Avenue Improvements PAED + PS&E

Page 8: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Progress

• I-605/Beverly Blvd. Interchange Improvements PAED + PS&E• I-605/Valley Blvd. Interchange Improvements PAED + PS&E

• SR-138/SR-14 SB Ramps at Palmdale Blvd. PAED• SR-138/SR-14 Avenue G Interchange PAED• SR-138/SR-14 Avenue J Interchange PAED• SR-138/SR-14 Avenue K Interchange PAED• SR-138/SR-14 Avenue L Interchange PAED• SR-138/SR-14 Avenue N Overcrossing PAED• I-405 NB and SB Imp., I-405 to Artesia Blvd. PAED• I-605 Corridor Between I-105 and I-10 Improvements PAED • I-710/Shoemaker Bridge Replacement PAED• I-710 Corridor Improvements PAED

Page 9: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Upcoming

• Local Streets/Intersections Var. Phases• Freight Advanced Traveler Information System Study/Technology Implementation• SR-710 MIPs – San Gabriel Intersections Not started yet• I-710 Early Action Projects (Interchanges) Not started yet

Page 10: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

• 14 miles of HOV lanes in both directions• 2 miles of truck climbing lanes at the

south end • 7 bridge modifications at:

– Gavin Canyon– Calgrove Blvd.– Butte Canyon– Magic Mountain Pkwy.– Santa Clara OH– Rye Canyon– Castaic Creek Bridge

• 1 bridge replacement at Weldon Canyon• Soundwalls and retaining walls• Completion of design: Spring 2019• Construction start TBD

I-5 North HOV and Truck Lanes

Page 11: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

SR-57/SR-60 InterchangeMetro Measure M ProjectMetro Call For Projects – In ProgressMetro Call For Projects – In ProgressFuture Project

Construction: 2022

Page 12: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

• In Final Design phase • 2 segments:

• Mission to SR-60 – upgrade from expressway to freeway

• Mission to I-10 – upgrade including raising 2 bridges over the RR tracks

SR-71

• Construction of Mission to SR-60: Summer 2020• Construction of Mission to I-10: Summer 2023

Project Summary

Status Update

Page 13: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Project Summary

• Add auxiliary lanes NB & SB from I-105/I-405 to Artesia Blvd off-ramp

Status Update

• PSR completed Nov. 2018• PAED commenced in March 2019• Construction in 2023

I-405

Page 14: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

I-605

• Freeway widening/additional lanes, HOV/ExpressLanes, ramp reconfigurations, arterial intersection enhancements, signage, and safety features

• Estimated total cost of projects in the I-605 corridor between I-105 and I-10: $5+ billion

Project Summary

• Corridor environmental studies in progress –completion in 2021

• PIDs, environmental clearance, and final design in progress for various “Early Action” projects

Status Update

60

5

9191

405

Page 16: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

I-710

I-710 (South)

• In PAED phase • 18 miles between the Ports of Long Beach and Los

Angeles and the SR-60 • Locally-Preferred Alternative Selected:

• 5C: One lane + upgrading• Estimated Cost: $6-$11 billion • Includes “Early Action” Projects• $420 mil in Measure R and $500 mil. in Measure M

• Final EIR/EIS: TBD• Early Action projects final design

starting upon approval of the final ED and contingent upon no legal action preventing progress

Project Summary

Status Update

Page 17: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Alondra

I-405

SR-91

I-105

I-5 to SR-60

Florence

LB Blvd Pico-Anaheim

Rosecrans

Imperial

PCH WillowDel Amo

Slauson

Atlantic-Bandini Washington

Firestone

Shoreline/7th

Total Cost $6+ Billion

(2015 Dollars)

17

NI-710

Page 18: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Project prioritization through collaboration with the corridor cities/GCCOG

Page 19: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

State Route 710 (North)

• $780M in Measure R funds• $300+M in other funds• PAED Completed• Preferred Alternative selected:

Transportation System Management/Transportation Demand Management (TSM/TDM)

• Mobility improvement projects (MIP) identified for funding and implementation

Project Summary

Status Update

• FED and ROD approved/signed • Programming of approved TSM/TDM

and MIPs in 2019-20

Page 20: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

M.R. SR-14/138 Projects

Project Construction Date (Estimate)

Lanc

aste

r

SR-138/SR-14 Avenue K Interchange February 2022

SR-138/SR-14 Avenue G Interchange March 2021

SR-138/SR-14 Avenue J Interchange October 2020

SR-138/SR-14 Avenue L Interchange January 2022

SR-138/SR-14 Avenue M Interchange January 2022

Palm

dale

SR-138/Palmdale Blvd., 5th to 10th Street East October 2021

SR-138/Palmdale Blvd., SB SR-14 Ramps January 2021

SR-138, 10th Street West Interchange August 2022

SR-138 Widening, Rancho Vista Blvd. to Palmdale Blvd.

In Const. (11/2018)

SR-138, Avenue N Overcrossing May 2022

Construction contracts by Palmdale and Lancaster

Page 21: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

High Desert Corridor

• 63 miles - Highway, Expressway, Tollway, High Speed Rail, Bikeway, and energy production/transmission corridor concepts

• Connecting North Los Angeles County and San Bernardino County (Victorville) • Transit connection between the CHSR and the XpressWest• In Measure M for ROW and related services in 2019• More funds in later years• Final EIR/EIS completed in 2016

Status Update

Project Summary

• Multi-agency efforts in assessing other feasible alternatives

Page 22: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

SR-138, SR-14 to LA/SB County Line

Funding in progress as of March 2018. Construction by Caltrans

22

Page 23: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Soundwalls

Page 24: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

24

Countywide Soundwall ProgramProp C

Programmed Spent

$93,291,038 $85,981,932

• Retrofit” Soundwall Program• Metro’s responsibility after SB45• Phase I and Phase II

Page 25: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Soundwall Program Status

Phase/Package StatusPhase I, Priority 1, Packages 1-8 Completed

Phase I, Priority 2, Package 10 In Design

Phase I, Priority 2, Package 11 In Construction(Package 9 Scope included in Package 11)

Phase I, Priority 2, Packages 12-14 NBSSRs will be developed

Phase I, Priority 3 List not funded/not prioritized

Phase II List not funded/not prioritized

25

Page 26: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Priority 2

Pkg Route Miles12 210 1.7 Glendora13 405 9 Long Beach, Carson14 134 0.6 Eagle Rock

11.3 NET: 4.06 miles

Priority 3

57 7.8 Diamond Bar91 5.6 Bellflower118 13.8 Los Angeles134 0.6 Toluca Lake, Burbank405 0.7 Long Beach, Los Angeles

28.5 NET: 7.6 miles

Remaining Walls - Phase I

26Total Miles: 39.8 (NET: 11.66)

Page 27: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

27

Route Miles Jurisdiction2 9.2 Los Angeles5 10.2 Los Angeles

10 38.33 Santa Monica, LA, Alhambra, Monterey Park14 8.4 Los Angeles, Lancaster47 1.2 Los Angeles57 2.8 Pomona60 7.3 Los Angeles71 1.7 Pomona90 2.6 Los Angeles91 0.12 Cerritos

101 14.77 Los Angeles, SFV, Calabasas105 10.52 Los Angeles, Hawthorne, Lynwood, Willowbrook110 18.55 Los Angeles, San Pedro118 0.2 Los Angeles, Chatsworth134 1.29 Los Angeles, Burbank, Glendale210 42.6 Los Ángeles, Glendale, Pasadena, Arcadia, Glendora, 405 3.04 Los Angeles, Long Beach605 3.05 Lakewood, Pico Rivera, Whittier, Norwalk710 2.4 Bell, South Gate

178.27 (NET: 68.8 miles)

Remaining Walls - Phase II

Page 28: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Other Engagement

Adv. Traveler Info. Syst.

Integrated Transp. System

Truck Platooning

Page 29: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Bucket 1 – Work to Continue

Page 30: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Bucket 2 - Projects to be Delayed

Page 31: Metro Highway Programacec-oc.org/images/Presentations/Metro ACEC OC...• In Final Design phase • 2 segments: • Mission to SR-60 – upgrade from expressway to freeway • Mission

Discussions