Memo on Prjects (2)

2
7/24/2019 Memo on Prjects (2) http://slidepdf.com/reader/full/memo-on-prjects-2 1/2 PADCOM TONDOMINIUM (ORPORATION ,,-il,Tlii xTl,;-'flxiHiliiil xlffi ,,, Fox No {63?)Iit }&JiT i*l, iiillili;11i50@g*u,t ,o, October 23,2012 TO ALL UNIT OWNERS PADCOM Condominium Corporotion Podillo Bldg., Emerold Ave., Ortigos Center Posig City Sir / Mqdom: This is in connection with the requirements of the City Government of Posig ond the Bureou of Fire Deportment with respect to the instollotion of the Sewer Treotment Plont (STP) ond the Woter Sprinklers which hove been fully presented, discussed ond opproved in o meeting of the Unit Owners. (those ottended representedS6.9% of the stokeholders) held on October 16,2012. These projects ore required in securing the Business Permits of our tenonts/occuponts. These required projects hove been discussed thoroughly by the officers of PADCOM, over o long period of time so thot we con hove the leost possible cost without compromising the quolity or the function of the projects. Attoched with this letter is the totol cost/budget of oll these required projects ond the shore of eoch unit owner. The contribution will be divided into six monthly poyments which will stort this November 2012.For this purpose, o speciolossessment/billing willbe given to you. We sholl furnish you reports on the stotuslupdote of the project os well os the poyment/contribution of the unit owners through e-moil. For yourinformotion ond guidonce. Noted by: Eng,

Transcript of Memo on Prjects (2)

Page 1: Memo on Prjects (2)

7/24/2019 Memo on Prjects (2)

http://slidepdf.com/reader/full/memo-on-prjects-2 1/2

PADCOM

TONDOMINIUM

(ORPORATION

,,-il,Tlii

xTl,;-'flxiHiliiil

xlffi

,,,

Fox No

{63?)Iit

}&JiT i*l,

iiillili;11i50@g*u,t

,o,

October

23,2012

TO ALL UNIT OWNERS

PADCOM

Condominium Corporotion

Podillo

Bldg., Emerold

Ave., Ortigos

Center

Posig City

Sir

/

Mqdom:

This is

in

connection with the

requirements

of the

City Government

of

Posig

ond

the

Bureou

of

Fire Deportment

with

respect

to the

instollotion

of

the

Sewer Treotment

Plont

(STP)

ond

the

Woter

Sprinklers

which hove been

fully

presented,

discussed ond opproved

in

o

meeting of

the

Unit

Owners.

(those

ottended

representedS6.9%

of

the

stokeholders) held

on October

16,2012.

These

projects

ore required

in

securing

the

Business

Permits

of our

tenonts/occuponts.

These

required

projects

hove

been

discussed

thoroughly by the officers of

PADCOM,

over

o long

period

of

time

so

thot we con

hove the

leost

possible

cost

without compromising

the

quolity

or

the function

of

the

projects.

Attoched

with

this

letter is the totol

cost/budget

of oll

these

required

projects

ond

the

shore of

eoch unit

owner.

The

contribution

will

be divided

into

six

monthly

poyments

which

will stort

this

November

2012.For

this

purpose,

o

speciolossessment/billing

willbe

given

to

you.

We

sholl

furnish

you

reports

on

the

stotuslupdote

of the

project

os

well

os

the

poyment/contribution

of

the

unit

owners

through

e-moil.

For

yourinformotion

ond

guidonce.

Noted

by:

Eng,

Page 2: Memo on Prjects (2)

7/24/2019 Memo on Prjects (2)

http://slidepdf.com/reader/full/memo-on-prjects-2 2/2

Total

Costs/Budget

for

All

tlre Required

Pdects

Y*ge

Sharewner

Fire Deot. Reouirements

CENRO

TOTAL

COSTS

Monthly Cost

(Six

Months)

prinkler

Fire

Alarm Fire Door S'TP

TSPI 3.3037

159,720.21

10,1 t

1

.94 2.427.7

| 23,664.28

195,924.74

32,654.0

Manilabant 3.905 t

r

88,830.58

I

I.954.93

2.870.1

8

27.97'7.29 231,632.98

38,605.5

Z-Data 3.9057

188.830.58

n,954.93 2,870.18

27

977.29

231,632.98 38,605.5

Zarcon

Dew Corp 6.711%

324,517.81

20,54s.34 4.932.59

48.0tt0.83

398,076.56

66,346.0

RFCuervo,

Inc.

5.27s%

255.078.45

t6.r49.11

3,877.13

3',7.-/92.63

312,897.31

52,149.5

Abeio Really

2.\7411

105.126.17

6,655.57

r,597.8S r5.575.5{t 128.955.2

r

21,492.5

Leonila Reyes 2.26314

109.429.86

6.928.04 1,663.31

16.213.22 134,234.43

?2,372.4

IFAWPCA

s.0347,

243,424.63

15,411.30 3,699.99 16.065.99

298,60r.91

49,766.9

PCA 5.1237.

247.728.32

15,683.77 3.765.41

3

6.703.63

303,88

l.

r2

50,646.8

JA

Development

Com

14.1577,

491,152.94

3

1,095.07 7.465.44

72.769.62 602,483.03 100,413.8

RNFerrer

&

Associates

to.t57a

491,152.94

3

1,095.07 7,465.40 72 7

69.62 602,483.03 r00,413.8

Peiav Estates

s.07857 245,5',16.47

15.547.53 3,732.70

36.384.81 301,24

l.5l

50,206.9

PGGL

5.0785%

245,576.47

I

5,547.53 3,732.70

6.384.8

r 30

1.24 I

.51

54,206.9

FLRamos

Construction

2.6377.

27,515.05 8,073.02 938.20

8.ti92.73

1s6.419.00

26,069.8

Pacific Resins

2.637di

27 _515.05

8,073.02 938.20

8 892 73

156,4r9.00

26,069.8

Q-Star

Corp

2.174*

05.126.17 6,655.57 597.89

s

575

5R

r28,955.21

21,49?.5

Augusto

Galang

2.26vi

49,429.86 6,928 04

,663.31

6.213.22

134,234.43 22,372.4

FREstuar

&

Associates

11.4n

s48,454.93

34,722.88 8.336.37 ti

r.259.53 672,773.70 112,128.9

Winfred

Zosa

10.783?'

521.423.87

33,011.53 7.925.51

77.254.59 639,615.49 106,602.5

IOTAL

4,835,610.36 306.144.20 73-500.00

716.441i.0t)

5,931,702.56 988,617.0