    9. CLARIFICATION STATION

  • 7/27/2019 M&E spc 9 CS-R

    2/12

    Page 2 of 12 CS

    CS: Page 2 of 12

    9.1 Clarification Tank 1 Unit

    Arrangement : This tank receives crude oil from the crude oil pumps. Staticseparation of the lighter oil phase from the heavier sludge

    portion takes place in the tank.

    Type : Vertical cylindrical tank. The tank shall be supported by 8 steel

    structures evenly spaced.

    Capacity : 90 cu. meters.

    Construction : a) The tank shall be fabricated from 50% MS plate 8mm and

    the rest 6mm.b) The conical cone shall be joined to the bottom of the

    cylindrical shell with direct double butt welds with MSplate 8mm

    c) The clarifier oil inlet pipe shall be 100 mm N.B. API sch

    40. A rising stem hand wheel shall activate rising and

    lowering of the flow impingement plate. All pipe out/inlet

    connected to tank shall be API Sch 40 pipe.

    d. Skirt support made of MS plate 9mm thk stiffened with MSplate 6mm and base plate of 15mm thk

    e. Hinged inspection manhole with 50mm raised lip is to beprovided for access to the tank internal and for operating

    the oil skimmers. Monkey ladder MS bar 12 dia. Shall be

    installed.

    f. Safety handrails of 1067 high comprising of 38mm dia.pipe for the top rail & balusters and 32mm dia. N.B. formid rail. Toe board of 100 x 4.5mm thk ms flat rigidly

    welded.

    g. The top & bottom circular rim of the tank shall bestrengthened with fully welded 50 x 6mm flat stiffening

    ring respectively. 1 nos SS adjustable oil skimmer funnel

    c/w clamp support and hand wheels shall be provided.

    h. Top of the tank shall be braced with 200x80 RSC bracedwith 75x75 M.S. angle and cover with 4.5mm thick

    chequered plate all over.

    i. Access to the top shall be provided with staircase from thefloor and from sludge tank platform.

    Accessories : a) Stainless steel agitator mounted onto a SS shaft of

    dia.76mm SS sch 40 pipes driven by a 1.5 kW geared

    motor speed reducer to a final speed of 6 rpm, sf 1.5. The

    paddles shall be SUS 304 material.

    b) Level indicator.

    c) The tank shall be insulated with 50mm thick rockwool and

    covered with aluminium sheet of 22 SWG.

  • 7/27/2019 M&E spc 9 CS-R

    3/12

    Page 3 of 12 CS

    CS: Page 3 of 12

    b) Closed and open SUS sch 10 steam coil pipes. Hot waterpipe shall be sch 10 SUS pipe.

    c) 150 dia. face temperature gauges c/w S.S. pocket/cockrange 0-150 C install at suitable position.

    d) Interconnecting platform between tanks.e) A CI body ball valve with SS ball & PTFE seat and flange

    to ANSI 100 drain valve shall be installed for drainingpurpose.

    f) Thermostatic temperature control system of 50 dia. Cloriusmake shall be provided for the maintain the tank

    temperature.

    g) Steam Trap shall be of 25 mm diameter

    9.2 Sludge Holding Tank 1 Unit

    Arrangement : To receive sludge from the clarification tank.

    Type : Vertical cylindrical tank.

    Capacity : approx. 15 cu. meters.

    Construction : The tank shall be fabricated from 8mm thick steel plates. The

    conical section shall be of 8mm thick plate.

    An external level indicator c/w fabricated SS Float and M.S

    level gauge, pulleys etc shall Also be provided.

    Hinged inspection manhole with 50mm raised lip is to be

    provided for access to the tank internal and for operating the oil

    skimmers. Monkey ladder MS bar 12 dia. Shall be installed.

    All inlet/outlet pipes attached to the tank Shall be API Sch 40

    pipe.

    Open steam coils shall be sch 10 SUS pipes 75mm

    N.B. The opened coil shall be drilled with 2 rows 3mm diaholes at 150mm c/c staggered.

    The tank shall be insulated with 50mm thick Rock wool and

    covered with aluminium cladding sheet of 22 SWG.

    One 150 mm dia. dial 0-150 C SS Thermometer c/w SS pocket.

  • 7/27/2019 M&E spc 9 CS-R

    4/12

    Page 4 of 12 CS

    CS: Page 4 of 12

    One CI body with SS 304 Ball & PTFE seat flange to ANSI 75

    makes Drain valve shall be Installed for draining purpose

    Mild Steel RSC Support for Vibrating Screen to be

    installed at the top of the tank. Waste chute from V.S. tobottom floor shall Be provided.

    All nozzle openings to cut and suit at site. All nozzles shall be

    API Sch 40 Pipe.

    9.3 Pure Oil Tank 1 Unit

    Arrangement : To receive the oil fraction from the clarification tank.

    Type : Vertical cylindrical tank.

    Capacity : approx. 30 cu. meters.

    Construction : The tank shall be fabricated from 6mm thick mild steel plates.

    The conical section shall be of 6mm thick mild steel plate.

    An external level indicator c/w fabricated SS Float and M.S.

    level gauge, pulleys etc shall Also be provided.

    Hinged inspection manhole with 50mm raised lip is to beprovided for access to the tank internal and for operating the oil

    skimmers. Monkey ladder MS bar 12 dia. Shall be installed.

    Closed steam coils shall be sch 10 SUS pipes 75mm N.B. All

    inlet/outlet pipes Attached to the tank shall be API Sch 40

    Pipe.

    The tank shall be insulated with 50mm thick Rock wool and

    covered with aluminium cladding Sheet of 22 SWG.

    One 150 mm dia. dial 0-150 C SS Thermometer c/w SS pocket.

    Thermostatic temperature control system of 50mm dia.

    One CI body with SS ball/PTFE seat Flange to ANSI 75 Drain

    valve shall be installed for draining Purpose.

    A 65 NB oil outlet pipe shall immerged inside the tank &

    connected to outlet nozzle to allow clean oil inlet to oil

    purifiers.

  • 7/27/2019 M&E spc 9 CS-R

    5/12

    Page 5 of 12 CS

    CS: Page 5 of 12

    9.4 Sludge Buffer Tank Pump/Sand Cyclone Pump 1 Unit

    Arrangement : To pump the sludge from sludge tank to desander cyclone #1

    Type : Centrifugal type, material CA15/CA15/SS

    KEW SEL40

    Capacity : 15 m3/hr at 25 meter head

    Drive : Aprox speed of pumps 1450 rpm, via pulley and belts. 7.5 kw

    motor

    Mechanical Seal : Mechanical seal to be of hard material to withstand abrasion.

    9.5 Sludge Buffer Tank 1 Unit

    Arrangement : The tank is to receive the desanding sludge and act as Sludge

    distribution/feed tank and deliver to sludge separators.

    Type : MS tank 1.5m x1.5m x 1.5m(to suit)

    Capacity : Approximate 3m3.

    Construction : The tank shall be fabricated from 6mm thick MS suitablystiffened by angles stiffener. It shall have a 3 mm cover

    Accessories : a) Open SS sch 10S steam coils. 38mm

    c) Inlet, outlet, overflow and drain pipes attached to the tankshall be API sch 40 pipe.

    d) Level indicator.

    f) 100 dia. temperature gauge range 0-150C.

    9.6 Reclaimed Oil Tank 1 Unit

    Arrangement : To receive condensate from sludge/pure oil tank/clarifier tank

    etc, Condensate from pits and Separators etc.

    Type : MS tank 1.5m x1.5m x 1.5m(to suit)

    Capacity : Approximate 3m3.

  • 7/27/2019 M&E spc 9 CS-R

    6/12

    Page 6 of 12 CS

    CS: Page 6 of 12

    Construction : The tank shall be fabricated from 6mm thick MS suitably

    stiffened by angles stiffener. It shall have a 3mm cover.

    Accessories : a) Open SS sch 10S steam coils. 38mm

    c) Inlet, outlet, overflow and drain pipes attached to the tankshall be API sch 40 pipe.

    9.7 Reclaimed Oil Tank Pumps 1 Unit

    Arrangement : To pump the reclaimed oil from the reclaimed oil tank back toclarification tank/sludge tank.

    Type : Centrifugal type, CA15/CA15/SS construction.

    KEW SEK40

    Capacity : 15 m3/hr at 15 meter head

    Drive : Speed of pumps 1450 rpm, via pulley and belts. 3kw motor

    Mechanical Seal : Mechanical seal to be of hard material to withstand abrasion.

    9.8 Sludge Seperator 3 units

    High Capacity Star Bowl Separator

    Make : EMI

    Model : HSC8000

    Capacity : 8 m3/hr

    Nozzles : 12 nos x 1.9mm(Tungsten Carbide)

    Motor : 15kw / 415V/ 1450rpm

    Rotor speed : 1450rpm

    Rotor and parts : SS 304

    Fluid coupling : 11KSD via V belts

  • 7/27/2019 M&E spc 9 CS-R

    7/12

    Page 7 of 12 CS

    CS: Page 7 of 12

    9.10 Modular Single Stage Desanding cyclone 1 set

    Modular Single Stage Cyclone c/w Automation

    Make : Alfa Laval

    Model : SSC 301-100 c/w automation

    Type : Hydrocyclone type c/w Automation

    Capacity : 10-15 m3/hr

    Accessories : - Control panel for sequence automation control

    - Dirt receiver and emptying valves- Pneumatci actuators and solenoid control valves

    - Monometer with membrane protection- Metal parts contact with oil SS316

    - Cone material Abrasion resistance nylon oil

  • 7/27/2019 M&E spc 9 CS-R

    8/12

    Page 8 of 12 CS

    CS: Page 8 of 12

    9.11 Vacuum Dryer System- 1 set

    Arrangement : One unit vacuum dryer shall be supplied and installed to receive oil exit

    from purifiers and to remove moisture in the oil by mean of a vacuum

    pump.

    Type : Vacuum Dryer System or equiv.

    Capacity : 6 tons oil per hour each

    Complete with : -Dryer chamber

    -2 sight glass and illumination

    -1 ball float control valve

    -1 vacuum meter

    -All necessary oil, water and vacuum piping-SPECK Liquid Ring vacuum Pump

    -SPECK Oil Transfer Pump- Float tank system

    Vacuum Pump 1 Unit

    Brand/Model : Speck / VH180.

    Capacity : 180m3/hr @-0.1mbar(-3 Hg)

    140m3/hr @ -0.9 mbar(-27 Hg)

    Speed of Pump : Maximum speed 1450 rpm.

    Mechanical Seal : Mechanical seal to be of hard material to withstand abrasion.

    Motor : 7.5 kW.

    Accessories : Anti cavitation valve and auto draining valve

    Production Oil Pump 1 Unit

    Brand/Model : KEW-SEK40

    Capacity : 6 tons/hr @ 30m H

    Speed of Pump : Maximum speed 1450 rpm.

    Mechanical Seal : Mechanical seal to be of hard material to withstand abrasion.

    Motor : 5.5 kW.

  • 7/27/2019 M&E spc 9 CS-R

    9/12

    Page 9 of 12 CS

    CS: Page 9 of 12

    9.12 Hydrocyclone Waste Water Pump 1 Unit

    Arrangement : To pump wastewater from hydrocyclone pit to sludge oil

    recovery tank

    Capacity : 5 m3/hr at 15m head

    Make : KEW SEP40

    Material : CA15/CA15/SS

    Sealing: Mechanical sealWet end opened impeller & mechanical seal

    Driven : Electric motor via V-belts at 3 kw.

    Note: 1. all pump sets c/w motors are to be mounted on a common rigidm.s. base plate and belt driven via pulleys to the required rpm.

    9.13 Sludge Pit Recovery Pump 1 Unit

    Arrangement : To pump recovered oil from sludge pit to reclaimed oil tank.

    Capacity : 5 m3/hr at 15m head.

    Make : KEW SEP40

    Drive : 3KW. Electric motor through V-belts.

    Material: CA15/CA15/SS. Mechanical seal.

  • 7/27/2019 M&E spc 9 CS-R

    10/12

    Page 10 of 12 CS

    CS: Page 10 of 12

    9.14 Oil Recovery Tank 1 Unit

    Arrangement : To recover oil from the sterilizer condensate/sludge

    Type : Mild steel cylindrical top section & conical bottom supportedby steel section, elevated from ground level.

    Capacity : Approximate 100m3.

    Construction : The construction & specification of the tank as shown in the

    drawing. The tank is to be fabricated from 6mm thk MS plate

    c/w 100 x 50 x 9.36 kg/m RSC stiffener ring. The conical

    section is to be fabricated from 6mm thk MS.

    Hinged inspection manhole with 50mm raised lip is to beprovided for access to the tank internal and for operating the oil

    skimmers. Monkey ladder MS bar 12 dia. Shall be installed.

    An external level indicator c/w fabricated S steel float, S steel

    flexible cable, level gauge, pulley etc shall be provided.

    Steam coil shall be constructed from 75mm Sch 10 SS steel

    pipe and with the coil end blanked off. The finish coil shall be

    drilled with 2 row of 3mm dia. Holes @ 150 c/c staggered.

    The completed tank is to be supported by 6 nos 150 x 150 UC

    fully welded to 10mm thk ms plate which is fully welded to the

    circumferential plate of the tank. The column base plate shall

    be of 20mm thk ms plate fully welded to the column. Eachcolumn is to be rigidly braced by 75x75x6 RSA.

    Top roofing shall be 4.5 thk chequered plate c/w 40mm N.B.

    handrailing & kicking plate c/w monkey access ladder

    9.15 Vibrating Screen x 1 unit

    Arrangement : To screen the sludge before feed into sludge tank

    Make : WATERMECH

    Model : DDCS 48/1 - 48 single deck

    Bottom Stainless Steel 304 wire Mesh 40

    Construction : SUS 304 for all wetted parts

    Drive : 2 kw Hp, 415/3 phase/50 Hz. Italy Vibras

    Capacity : Min. 20 T FFB/Hr.

  • 7/27/2019 M&E spc 9 CS-R

    11/12

    Page 11 of 12 CS

    CS: Page 11 of 12

    9.16 Sludge Holding Tank 1 Unit

    Arrangement : The tank is to receive the effluent from sludge recovery tank

    before pumping to effluent ponds.

    Type : MS tank 1.5m x1.5m x 1.5m(to suit)

    Capacity : Approximate 3m3.

    Construction : The tank shall be fabricated from 6mm thick MS suitably

    stiffened by angles stiffener. It shall have a 3mm.

    9.17 Sludge Holding Tank pump/Effluent Pump 1 Unit

    Arrangement : To pump the effluent from to effluent cooling ponds

    Type : Centrifugal type, CA15/CA15/SS construction.

    KEW SEK40

    Capacity : 20 m3/hr at 15 meter head

    Drive : Maximum speed of pumps 1450 rpm, via pulley and belts

    5.5kw motor

    Mechanical Seal : Mechanical seal to be of hard material to withstand abrasion.

  • 7/27/2019 M&E spc 9 CS-R

    12/12

    Page 12 of 12 CS

    CS: Page 12 of 12

    10.15 Air Compressor 1 Unit

    Arrangement : To supply pressurised air to activate the actuators of the engine

    room/de-sander/Purifier/separator valves etc.

    Capacity : a) Suitable and sufficient to cope with the actuators min. of

    50 liters/s.

    b) motor rating (to suite the required spc.).c) Working pressure 7 bar @ 10 hp

    Make : Swan.

    Air Receiver : Capacity: 1.5m3.Safe WP 7 bar./Design Code: BS5500

    Air Dryer : Type: Air Cooled, refrigerant type.

    Capacity: 50 l/s.

    Safe WP: 6 bar

    Accessories :a) All other necessary fittings and tubing.

    b.)H.T. certificate and certificate of fitness from DOSH.

    c) Safety release valve/pressure gauge.

    9.16 Clarification Station Structural Platform 1 lot

    Arrangement : To Support All Clarification Equipments etc mild steel bolted

    connection.

    Construction All structural steel shall in accordance with BS4360 &

    fabricated to conform to BS 5950 Part 2:1985 specifications.

    All platform decking shall be 4.5 mm thick on the plain

    chequered plate. Mild steel angles, channels, I beam plates asshown in the drawings.

    Mild steel staircases provided as shown with 4.5mm thick

    chequred plate and bent with 25 mm lip, all handrails shall be

    38mm NB pipe for the top rail (SS tube) and balusters and

    32mm NB pipe for the intermediate rail, and interconnecting

    walkway to press structure digester platform.