• Advanced memory RAS features MCA Recovery, Memory Chip RAS, Memory
patrol and scrubbing,…
• Predictive failure analysis & de-allocation
of CPU resource, ECC memory
• Redundant system resource Redundant clock source, core IO logic and
service processor.
• Max. 4 (60cores/120threads)
Intel Xeon Processor E7 v2 family
CPU
• Max. 4TB memory with 64 x64GB DIMM
• Max. 16 slots of PCI-Express 3.0 (Class No.1 rich IO slot)
High Scalability
High Operation-ability
High Availability
• CPU core capacity on demand feature for flexible resource optimization
• Memory riser card on-line addition
• I/O card on-line addition • 40℃ HTA supported
Speeds and Feeds
NEC Express5800/A2000 Series Scalable Enterprise Server….OR
CX (Core Xeon)
Page 3 © NEC Corporation 2014
Technology to Address Business Priorities
CIO PRIORITY *
Virtualization
Disaster Recovery
Cloud Computing
ERP
BI & Analytics
SOLUTION PLAYS
• Lower Operational Costs
• Consolidation: 9:1 conversion ratio
• Solution for DR
• Agility and Performance: COPT
• Availability and Reliability: Data Center RAS
• Instant Access to Data
• Business Decision in Minutes vs. Hours
Large Scale Virtualization
Heavy Transactional
Workloads
In-Memory Databases
*
Page 4 © NEC Corporation 2014
High Density for Large Scale Virtualization
▐ One NEC CX Server handled 8x more VMs than a single legacy server
▐ Consolidated NINE legacy servers into one NEC CX Server
>
One NEC
Express5800/A2040b
replaced nine legacy HP
servers
= VM
More virtual machines per server
Page 5 © NEC Corporation 2014
High Density for Large Scale Virtualization
Message:
CX Server is ideal platform for virtualization of mission critical applications
More virtual machines per server
Lab Validated Conversion Ratio of 9-to-1
Previous High Availability features on Unix or MF platforms now available on X86
COPT, Core De-allocation, Core Sparing, MCA, PFA, Resource Sparing
Supporting Collateral (www.necam.com/cxserver)
• Principled Technologies - Lab Validation: White Paper,
Video, Infographic
• Aberdeen Group: White Paper, Ebook, Infographic
Page 6 © NEC Corporation 2014
×2
future
# of Core
Initial Sizing 8
6
4
2
Initial Add Key
×2
Workload
Add Key
Enabled Core
Disabled Core
(spare)
6
COPT (Capacity OPTimization): Providing CPU Core Processing
Resources in accordance with workload requirements
Heavy Transactional Workloads
Page 7 © NEC Corporation 2014
Enable
Spare Core
Dynamic Core De-allocation & Enablement
CPU Core Sparing Dynamic replacement of CPU Core w/spare
COPT Model:
with Activation Key
7
• CPU Core Sparing
Dynamic Core Addition
Dynamic Core De-allocation
Advanced reliability features ensure continuous operation added
agility
De-allocate
CPU Core Enable
Spare Core
• Core Components
System Clock(s)
Service Processor(s)
Spare I/O Subsystem(s)
Redundant Core Components
Spare
Clock
Clock
Spare
SP
Service
Processor
Spare
I/O
Core
I/O
Heavy Transactional Workloads
Page 8 © NEC Corporation 2014
Heavy Transactional Workloads
Message:
Ideal for Large ERP systems (SAP) and large DB systems (SQL Server, Oracle)
2X performance over previous generation: 50% increase in core count, 2X
memory, and 16 I/O slots
Unique COPT features allows customers to pay-as-they grow
Lower up front hardware investment and option of enabling additional cores
as workloads increase
Supporting Collateral (www.necam.com/cxserver)
• Penton Media: SQL Server White Paper,
Video/Webcast Recording
• ESG: White Paper, Video (https://www.youtube.com/watch?v=4eUW22-
iABA&feature=youtu.be)
• Intel: SQL Server Appliance White Paper
• NEC: Reference Architecture with SQL Server
Appliance
Page 9 © NEC Corporation 2014
• Up to 4TB of Memory for Database
• Advanced Memory Resiliency
• Dynamic Memory Page De-allocation
• PFA (Predictive Failure Analysis)
• More memory = greater chances for errors
• Hot-Add Memory
• Upgrade without Downtime
Accessing Data on Disk
Accessing Data in Memory
148x Faster
Providing large amount of reliable memory for In-Memory DB workload
requirements
In-Memory Databases
Page 10 © NEC Corporation 2014
In-Memory Databases
Message:
In-Memory DBs enable customers to manage and analyze Big Data in near real
time
The CX provides up to 4TB of reliable memory for In-Memory DB Workloads
Advanced RAS features ensures system uptime and data integrity
Dynamic Memory Page De-allocation, PFA, Hot-Add Memory
Supporting Collateral (www.necam.com/cxserver)
• SAP HANA Data Sheet
• IDC: Technology Spotlight
• ESG: Best of Breed Cloud Solutions (NEC & Iron
Mountain)
Page 11 © NEC Corporation 2014
SAP HANA Appliance
Innovation of the
hardware
Innovation of the
software
Partitioning and parallel
query
Data compression
Row and Colum store
+ •Multi core
•Huge parallel
scale out
•64-bit
address
space
•2TB main
memory
100GB/s
through put
Innovation and fusion with HW and SW Advantage of HANA
All data is in main memory to avoid bottle neck. Thus HANA run extremely fast.
Load data fast by Partitioning and parallel query.
Fast response due to the efficiency of analysis by data compression and column store.
Table Join is no longer needed thus we can reduce development efforts.
Automated DB replication realize reduction development and maintenance effort.
HW&SW
SW
SW
SW
+
Copy right SAP AG
SAP HANA is an appliance server which combines SW(In-
memory computing engine) and HW (standardized and
validated).
SAP HANA appliance to be delivered as an installed and
preconfigured system to customer site for
Page 12 © NEC Corporation 2014
HANA Model
Scale-up Scale-out (Up to 16 nodes)
Up to 512GB 1TB 2TB
Release Plan Jun-2014 Jun-2014 Q3/CY2014
(Target)
Late Q4/CY2014
(Target)
Base Server A2040b A2040b A2040b A2040b
CPU
2 x E7-4890 v2
or
2 x E7-4880 v2
(30C)
4 x E7-4890 v2
or
4 x E7-4880 v2
(60C)
4 x E7-4890 v2
or
4 x E7-4880 v2
(60C)
4 x E7-4890 v2
or
4 x E7-4880 v2
(60C)
Memory 128/256/512GB 1TB 2TB 1TB
OS SUSE Linux Enterprise Server for SAP Application SP3
Or
Red Hat Enterprise Linux for SAP6.5
Server
Management EXPRESSSCOPE® Engine & NEC ESMPRO/Server Manager
Remarks For BW on HANA, DataMart and
Business Suite on HANA
Only for
Business Suite
on HANA
Only for
BW on HANA
and DataMart
Express5800/A2040b based SAP HANA
Page 13 © NEC Corporation 2014
NECAM Case Study
▌NEC Corporation of America
Corporate IT Service Division adopted SAP HANA for their IT platform
(SAP BW OLAP).
4 Mona based SAP HANA systems were delivered in early May.
Now in system development phase.
4 x Express5800/A2040b 512GB appliances on SuSE SLES 11 SP3
Development system for BW Sandbox system for BW Development system for SCM Sandbox system for SCM
Quality Assurance System for BW Quality Assurance System for SCM
Production System for BW
Production System for SCM
Multi instance installation (Optional configuration)
Multi instance installation (Optional configuration)
Page 14 © NEC Corporation 2014
SQL Server Appliance
▌System bottleneck from
performance gap between in-box
memory / storage and external
disks Performance tuning is getting more
complicated, needs a lot of external
storage and Host Bus Adapters to
provide enough IO bandwidth for a
high-performance DWH/BI system
▌Balanced CPU-IO configuration
restricted by the latest QPI
architecture-based processors The architecture requires extra CPU
sockets, even if customer just wants
to have more IO slots (or memory).
The extra CPU sockets contribute to
increased power consumption and
system cost
PC
Ie s
lot
DIMM DIMM DIMM DIMM
DIMM DIMM DIMM DIMM
DIMM DIMM DIMM DIMM
DIMM DIMM DIMM DIMM
PC
Ie s
lot
PC
Ie s
lot
Me
mo
ry
Con
tro
lle
r
Me
mo
ry
Con
tro
lle
r
IO Controller
CPU QPI
QPI
QPI
QPI based CPU
* QPI = Quick Path Interconnect
(Interconnect between CPUs)
1TB
10TB
100TB
1PB
<ns <1us <150us ~2ms ~8ms ~20ms
SATA
Disk
Array SAS
Disk
Array SAS
SSD PCIe
SSD
CPU Cache
(Access latency)
(Storage Capacity)
Huge Performance gap
DRAM
“PCIe SSD (server-mounted flash storage)” and
“Rich IO slots (per CPU)” are the keys to solve those issues
Page 15 © NEC Corporation 2014
Optimized performance combining fast clock CPU (E7-8893 v2:6C, 3.4GHz) and
high-performance HGST FlashMAX II PCIe server-mounted flash storage (FM2)
No data loss by utilizing software-mirrored storage pool feature of Windows OS
Balanced CPU-IO performance depending on number of FM2 (i.e., data size )
Express5800 Scalable Enterprise Server
Internal Drive
QPI
128GB
RAM
FlashMAX II
FlashMAX II
E7-
8893
v2 SW Mirroring
128GB
RAM
FlashMAX II
FlashMAX II
E7-
8893
v2 SW Mirroring
• 2CPU (3.4GHz, 6C)
• 256GB RAM
• 4x FM2 in mirrored storage pool
• 3CPU (3.4GHz, 6C)
• 384GB RAM
• 6x FM2 in mirrored storage pool
Scale Up
• 4CPU (3.4GHz, 6C)
• 512GB RAM
• 8x FM2 in mirrored storage pool
Scale
Up
SW Mirroring
128GB
RAM
FlashMAX II
FlashMAX II
E7-
8893
v2
128GB
RAM
E7-
8893
v2 SW Mirroring
FlashMAX II
FlashMAX II
NEC PCIe SSD Appliance for Microsoft SQL Server
- Reference configuration per node -
DW Benefits:
69% less rack space
27% less power
173% better performance
OLTP Benefits:
178% better performance
53% less impact on IO
Page 16 © NEC Corporation 2014
Benefits of Appliance for Microsoft SQL Server
Balanced and Predictable
Performance Easy to Introduce TCO Reduction
Initial Cost
Operating Cost
Time to introduction
Down
• Balanced and proven CPU-IO
performance depending
on customer data size.
• Consistent high-performance
even under heavy IO load.
• Customer can choose best
practice configuration
depending on data size.
• Configuration guide,
including best parameter
setting will be available in
CQ3/2014*
• Less platform integration cost
• Less rack apace
• Less power consumption
Express5800
Scalable Enterprise Server
High-performance
PCIe server-mounted flash storage
X
* NEC is capable to
Pre-install depends
on demand.
Best fit for High-Performance & Scalable DWH/BI system
Page 18 © NEC Corporation 2014
Iron Mountain Technology Escrow SaaSProtect w/NEC
▌Servers, Storage &
Networking
▌Remote Managed
Services
▌IRM Data Center
▌Disaster Recovery
▌All provided as a
Service
By offering IaaS with NEC, Iron Mountain’s Technology Escrow Services enriches
the offering by incorporating IRM Data Centers and new services. The
combination of NEC’s Nblock infrastructure, services, and OpEx model allows
technology escrow clients to be hosted in Iron Mountain Data Centers and rented
to Escrow clients as private cloud environments.
▐ Contingency Planning Guidance
▐ Level Four Verification Testing
▐ Data Recovery Testing with NEC
▐ Neutral 3rd Party Administration
Page 19 © NEC Corporation 2014
Iron Mountain & NEC SaaSProtect Solution Framework
Escrow
Storage
3rd Party
Administration
Managed
Services
Infrastructure
Data
Center
Page 20 © NEC Corporation 2014
Escrow Standards to Support Contingency Plans
• Required Deposit Material
• Verification Testing Rights
• Release Conditions
• Objection Period
• Contrary Instructions
• Rights Following a Release
• Payment of Fees
• Notices
• Repeatable Process
Page 21 © NEC Corporation 2014
IaaS Proposal Framework
NEC Managed Services
Web
Servers
Proxi
Server
DB
Servers
Clover
Webapp
SFTP/SMTP
Server
Admin
Servers Storage
Servers
VMware Virtualization
NEC CX Enterprise Server
NEC CX Enterprise Server
NEC M-Series M300 Storage Array
Iron Mountain Data Center – Boyers, PA
Page 22 © NEC Corporation 2014
Data Center Partnership
NEC chose Iron Mountain’s Data Centers because of the deep industry
understanding of managing data and overall quality of the company in terms
of Stability, Efficiency, Security, Compliance, and Disaster Resilience.
▐ Natural disaster protection: Weather resistant location (220 ft. underground), ‘Zero’ Seismic Zone, Elevated priority from Federal government (due to customer base)
▐ Operational PUE under 1.3 (Natural & Geothermal cooling)
▐ Power (Multiple grids, among lowest Kw/$ in country)
▐ Networks (All Carriers & Dark Fiber to hubs)
▐ Site Security
Level IV security (defined by US Department of Justice)
24/7: Armed guards, facility monitoring via closed circuit cameras, critical facilities and NOC staffing
▐ Fire Detection & Suppression
Onsite OSHA-certified fire brigade
Designed to Class A, three-hour fire rating
InfoWorld Green Award
“Iron Mountain finds limestone a
natural fit for data center efficiency”
Page 23 © NEC Corporation 2014
ECM Market Forrester Wave (Q3 2013) http://www.project-consult.de/files/Forrester%20Wave%20ECM%202013.pdf
Page 24 © NEC Corporation 2014
• Market Place
• Private Cloud Client Base Data Center
(Emerging Biz)
• Alfresco Top Partner
• Cloud Expertise & ECM ProSVC
Enterprise Content
Management
• Nblock
• OpEx Financing Infrastructure
Project: Document Archive Project
Iron Mountain’s Datacenter team (Emerging Business) wishes to offer an Alfresco based alternative to
IRM’s (Legacy Business) DRCi (Digital Records Center, IBM based solution) to expand data center
private cloud document management solutions (in place of loosing content / customers). IRM’s DRCi
team (Legacy Business) is not interested in considering another application provider / solution at this time.
Partnership with Alfresco’s top partner Micro Strategies creates formation to address market need.
IBM Proprietary (License & iSeries)
Limited Workflow (Multi-Tenant)
Expensive to Operate & Support
Open System (Nblock & Open Source)
Extensive Workflow (Single-Tenant)
Inexpensive (Shared Ops. & Open Sys)
Legacy DRCi System Enterprise Content Mgmt.
Data Center Team
Page 25 © NEC Corporation 2014
ECM Framework Options
Document
Storage
Document
Retrieval &
Conversion
Content
Management
System
Computer
System
Data
Center
?
(Legacy Business)
(Legacy Business)
(Emerging Business)
Page 26 © NEC Corporation 2014