www.marinba.org ◆ [email protected] November 5 , 2013 Vol. 57, Issue #42
VOTETODAY IS ELECTION
DAY
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 3
www.marinba.org ◆ [email protected]
12.12.13
01.31.14
05.02.14
09.22.14
SAVE THE DATES2013-2014 events
HOLIDAY OPEN HOUSE@ Marin Builders Association4:00 PM - 7:00 PM
ANNUAL CRAB FEED@ Margaret Todd CenterTime TBA
BOCCE BALL TOURNAMENTDetails TBA
ANNUAL GOLF TOURNAMENT@ Marin Country ClubTime TBA
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 4
SUPPORT OUR SCHOLARSHIP PROGRAM!
ENJOY A CLEAN CAR!!
Marin Builders Association in partnership with
Matt & Jeff’s Car Wash is providing an opportunity to get a top quality car wash
and support the MBA Scholarship Fund Matt & Jeff’s will donate 50% of car wash price to the Scholarship Fund
Purchase:
Packet of 4 for $100 or Individual car wash for $24.95
How: MBA Office, 660 Las Gallinas Avenue. San Rafael
Reserve tickets by calling Barbara at 462-1220 or send an email to [email protected]. We can bill your membership account!
You get: Full service car wash – takes approximately 15 minutes
Car wash tickets never expire! Offer is available 7 days a week
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 5
PROJECT OF THE WEEKNotice inviting bids for
McLaughlin Cottages919, 921, & 923 Bridgeway
Sausalito, CA 94965
Proposals may be e-mailed to [email protected] or sub-mitted by mail to 1 Blackfield Dr. #323, Tiburon, CA 94920.
Monday, November 18th, 2013 @ 10:00 AM
SCOPE: Demolish one single family home, site excavation & construction of three single family residences. There is no pre-bid conference or walk-through. Site is open.
Open to all trades. Breakdown bids by trade. Proposed start and end date of project is mid-November 2013 to mid-November 2014.
For more information e-mail Brad Tardy at [email protected] .
Plans and specifications may be viewed at the MBA and online by subscribers to the MBA Online Plan Service.
IN THIS ISSUE
________________________
GO VOTE 11.05.13 ........................1
RSVP MEMBER MIXER 11.13.13 .....2
Save The Date: MBA 2013/14 Events .....3
Project of the Week ........................5
Membership Manager’s Letter ............7
ANNUAL MBA GOVERNMENTAL RELATIONS
REPORT FOR 2013 pgs 8-23
The Capitol Connection ..................24
Obamacare & Small Business ........25-26
Safety : Demolition ......................28-29
REQUEST FOR BIDS ...................30
Permits ..............................................31
Liens & Completions .....................36
Project Bid Schedule ........................39
Classifieds ..........................................50__________________________
CONTACT MBA660 Las Gallinas Avenue
San Rafael, CA 94903 ◆
Office: 415-462-1220Fax: 415-462-1225
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 6
www.marinba.org ◆ [email protected]
north bayh a p t e rC
North Bay NARI
Holiday CelebrationConnect with Friends and Associates
Enjoy Great Food, Drink, and a Fun-Filled Auction
G
E
I
A
M The North Bay chapter of NARI (the National Association of the Remodeling Industry) and Golden State Lumber are co-hosting this cheery holiday mixer. Proceeds from the auction go to fund the Construction Technology program, based at Redwood High School for the past 18 years.
This accredited course teaches students real-world construction skills, and the positive effects of this exceptional program can be seen in the students’ growing confidence and sense of pride as they complete their finished projects. North Bay NARI’s annual auction is this program’s main source of funding.
• A Full Celebration Menu with Fresh, Local Food
• Beer, Wine, & Non-Alcoholic Beverages
Come enjoy the fun, celebrate the end of 2013, and make a difference for our teens!
H
When
Tuesday, December 3, 2013
5:30-8:30 pm
Location Golden State Lumber
1100 Anderson Dr. San Rafael, CA 94901
Cost $50 at the door $40 advance
Online registration: www.northbaynari.org
(Deadline 11/28)
North Bay NARI PO Box 1313
Novato, CA 94948
Email membership@
northbaynari.org
Website www.northbaynari.org
A great big Thank You to our host and sponsor, Golden State Lumber and our meeting sponsor,
High Tech Screens and ShadesG
H
I
I
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 7
www.marinba.org ◆ [email protected]
2013-2014 MBA DIRECTORS & OFFICERS
Presidentjim Schalich - Schalich Bros.
Construction
Vice PresidentTyler Doherty - Cal-West Rentals, Inc.
Chief Financial Officer Tom Barr - Ghilotti Bros., Inc.
SECRETARYJohn Busick - Bob Kunst Painting
Past PresidentJeff Mertel - Mertel Carpets
Executive DirectorKLIF KNOLES
Aimi Dutra - The Dutra GroupOliver Dibble - Dibble & Company
Keith Dotto - Dotto Glass, Inc.Clayton Fraser - West Bay Builders
Dave Garbarino - Marin Sanitary Service, IncJeff Grady - California Mortgage Advisors
Diane Henderson - DMH Land Use PlanningDan McLennon - McLennon Law Corporation
Herb Moran - Insurance ConsultantRob Scerri - Golden State LumberDave Trahan - Patriot Mechanical
Michelle Whiteside - Whiteside Construction
STAFFPaula Krause - Office Manager
Barbara Jones - Membership ManagerKellie Buono - Administrative Assistant/Reception
CONSULTANTSCasey Mazzoni - Legislative Analyst
Terrence Knoles - Publications
The weekly bulletin is owned by MBA. Archive available at www.marinba.org
660 Las Gallinas Avenue, San Rafael, CA 94903Publisher: Klif Knoles
MBA MEMBER
FROM OUR MEMBERSHIP MANAGERDear Members,
We value each of our MBA members and thank you for your continued support. Together we are part of the greater picture that brings individual businesses together to “provide the foundation for a well-built community”.
Each member is unique and brings their own expertise and experiences to the table. In the coming year we will be developing additional programs to enrich your membership and deliver more value to your business. You can look forward to increased networking opportunities, greater access to jobs, and new referrals. OUR FALL PROGRAM FEATURES A MIXER HOSTED BY ITALICS TILE ON NOVEMBER 13TH and we look forward to having you join us.
Stay tuned!
Regards,Barbara
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 8
REPORT ON THE ACTIVITIES OF THE CALIFORNIA STATE
LEGISLATUREFOR THE YEAR 2013
(pgs 8-23)
PRESENTED TO:THE MARIN BUILDERS ASSOCIATION (MBA)
BY: PHILIP M. VERMEULEN,LEGISLATIVE ADVOCATE
NOVEMBER 2013
www.marinba.org ◆ [email protected] ◆ [email protected]
ANNUAL MARIN BUILDERS ASSOCIATION GOVERNMENTAL RELATIONS REPORTby Phil Vermeulen, Legislative Advocate
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 9
www.marinba.org ◆ [email protected] ◆ [email protected]
2
California’s State Legislature – Are We Finally on the Right Track for the Future?
Let me begin this year’s report on a note of optimism and hope for the future. The Capitol was a changed place for the better this year. Literally from January 3rd when I walked through the halls to begin the New Year, there was a very evident feel of optimism both in the air and in my introductory meetings with the myriad new legislators. And myriad they were indeed! The Assembly started the year with 38 new members (which will shortly grow to 41!). These “newbies” within the halls of the Capitol constituted the most freshmen since 1934! With a total population of 80 members in the Assembly, having almost half as new members IS significant.
In the Senate, things were a bit different in terms of numbers, but the feel of optimism was still evident. There were 10 new members starting this year, but 9 of the 10 “moved-up” from the Assembly, thus there was only 1 new member (which also has since changed with the election of another new freshman from the Central Valley and two additional moves from the Assembly). I should also add, since the Senate “only” has 40 members, this meant there was a 25% change of faces (which has now expanded to almost 33%).
So, what made for this feeling of optimism, particularly since both of the houses have a 2/3rds Democratic majority which in large part was due to “the help” provided by labor unions’ sizeable PACS? Simply, you can thank the voter-enacted reforms for the difference. To wit:
For the first time, California had an open primary system in which the top two candidates, regardless of party, advanced to November. Thus under the new "top two" open primary system, many runoff candidates last November were forced to compete for votes among a wider spectrum of the electorate. No longer could they depend on just the party core (whether it be liberal or conservative). Instead they had to appeal to independents and members of the other party – and that was particularly true of the 20 legislative contests in which two members of the same party had to run against each other. The result was CLEAR that more moderate candidates won in many more seats under this new primary system.
Candidates ran in districts drawn by a nonpartisan commission instead of by lawmakers protecting their own safe seats (called gerrymandering). Again, this was another factor that produced more moderation in who was elected.
Looser term limits. Allowed to serve 12 years in one house, new legislators aren't arriving in the Capitol searching for their next job.
Given the fact that suddenly these 38 freshmen didn’t have to start running for their next office beginning on January 3rd meant they could “smell the roses!” In other words, many told me in my introductory meetings that they had no interest in introducing bills in their first year! And, for many others, they explained that while they would introduce “some” bills, they too were
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 10
www.marinba.org ◆ [email protected] ◆ [email protected]
3
going to keep their “loads” to a minimum. While this may sound “sacrilegious” for elected officials to espouse, their reasoning was very valid thanks to the aforementioned voter-enacted changes. Why not “learn the ropes” for a year or so by being active in their respective committee assignments before even attempting to author bills?
There was also something else that was different that day which continued to play out throughout this year (and will hopefully carry on henceforth) – no budget deficit to battle over from day one. This can be credited to past cutting, a recovering economy and Gov. Jerry Brown's tax increase of last year for the elimination of this fight. Again, without this catalyst, “battle lines” were not drawn from the outset. So, what was the outcome of this year’s optimism and reduced load of bill introductions? Certainly there were “bad” bills introduced, but there weren’t nearly as many as years past and most didn’t even make it through the legislative process! And for the ones that did make it to the governor, he pared them down even more! What is particularly noteworthy was that while the labor unions’ hold on Sacramento is substantial, it was remarkable that the governor “held the line” as much as he did. While I will not include the bills that the governor vetoed, suffice to say there were many. Finally, while CEQA reform was attempted this year, it will be at least next year before we will see any meaningful reform. Following are highlights of key bills that were signed into law which affect YOUR business, sorted by topic:
Architects & Engineers
AB 630 (Holden) - Chapter 453, Statutes of 2013. - Architects. Current law defines what constitutes an architect’s professional services. This bill will provide that no person may use an architect's instruments of service without the consent of the architect in a written contract, written agreement, or written license specifically authorizing that use. The bill will prohibit an architect from unreasonably withholding consent to use his or her instruments of service from a person for whom the architect provided the services, except as specified. The bill will provide that this act is a clarification of existing law and does not take away any right otherwise granted by law. SB 679 (Berryhill) - Chapter 471, Statutes of 2013. – Professional Engineers & Land Surveyors: reporting requirements. Current law prohibits, in order to safeguard life, health, property, and public welfare, any person from practicing civil, electrical, or mechanical engineering, or land surveying unless appropriately licensed or specifically exempted from licensure, as specified. This bill will revise provisions to instead require a licensee to report to the Board for Professional Engineers and Land Surveyors the occurrence of any civil action settlement or administrative action resulting in a settlement against the licensee, as specified, if the amount or value of the settlement is greater
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 11
www.marinba.org ◆ [email protected] ◆ [email protected]
4
than $50,000, and any civil action judgment or binding arbitration award or administrative action resulting in a judgment or binding arbitration award against the licensee, as specified, if the amount or value is $25,000 or greater.
Building Standards
AB 56 (Weber) - Chapter 475, Statutes of 2013 - School facilities: carbon monoxide devices. Will require, by July 1, 2015, the State Fire Marshal to propose for adoption by the California Building Standards Commission, appropriate standards for the installation of carbon monoxide devices in public and private school buildings. AB 127 (Skinner) - Chapter 579, Statutes of 2013 - Fire safety: fire retardants: building insulation. Will require the State Fire Marshal, in consultation with the Bureau of Electronic and Appliance Repair, Home Furnishings, and Thermal Insulation, to review the flammability standards for building insulation materials, including whether the flammability standards for some insulation materials can only be met with the addition of chemical flame retardants. The bill will require, if deemed appropriate by the State Fire Marshal based on this review, the State Fire Marshal to, by July 1, 2015, propose for consideration by the commission updated insulation flammability standards that accomplish certain things, including maintaining overall building fire safety. AB 221 (Quirk-Silva) Chapter 154, Statutes of 2013. - Recycled concrete. Current law defines the term recycled concrete as including mix designs or aggregate gradations that are in accordance with certain specifications. This bill will revise the definition of recycled concrete for purposes of these provisions to additionally include, as one of those specifications, the California Green Building Standards Code. AB 341 (Dickinson) - Chapter 585, Statutes of 2013 - Green building standards. Will require the California Building Standards Commission and state agencies that propose green building standards to allow for input by other state agencies that have expertise in green building subject areas. The bill will require the process by which these other state agencies shall submit suggested changes for consideration to be adopted as administrative regulations that include certain elements. This bill contains other related provisions and other existing laws. AB 1092 (Levine) - Chapter 410, Statutes of 2013 - Building standards: electric vehicle charging infrastructure. Will require the California Building Standards Commission, commencing with the next triennial edition of the California Building Standards Code adopted after January 1, 2014, to adopt, approve, codify, and publish mandatory building standards for the installation of future electric vehicle charging infrastructure for parking spaces in multifamily dwellings and nonresidential development. The bill will require the Department of Housing and Community Development to propose mandatory building standards for the installation of future electric vehicle charging
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 12
www.marinba.org ◆ [email protected] ◆ [email protected]
5
infrastructure for parking spaces in multifamily dwellings and submit the proposed mandatory building standards to the commission for consideration.
Construction Defect
SB 652 (DeSaulnier) - Chapter 431, Statutes of 2013. - Real property disclosures: construction defect litigation. There is presently no statutory requirement that a homeowner notify a potential buyer of a construction defect within the home. For example, if a homeowner receives a cash settlement based on an alleged defect, the homeowner does not need to disclose the nature of the defect to the prospective purchaser or whether a repair was made. A potential buyer should be aware of this fact and know whether or not that defect has subsequently been repaired.
Contractors’ License Board/ Contractors AB 433 (Gordon) – Chapter 377, Statutes of 2013 – Plumbers Installing Residential Fire Sprinklers Authorizes licensed plumbing contractors to install residential fire protection systems for single- and two-family homes through January 1, 2017 AB 1057 (Medina) - Chapter 693, Statutes of 2013. - Professions and vocations: licenses: military service. Current law authorizes a licensee or registrant whose license expired while the licensee or registrant was on active duty as a member of the California National Guard or the United States Armed Forces to, upon application, reinstate his or her license without penalty and without examination, if certain requirements are satisfied, unless the licensing agency determines that the applicant has not actively engaged in the practice of his or her profession while on active duty, as specified. This bill will require each board (including CSLB), commencing January 1, 2015, to inquire in every application for licensure if the individual applying for licensure is serving in, or has previously served in, the military. AB 1236 (Hagman) - Chapter 114, Statutes of 2013 - Contractors: limited liability companies. One of the problems that contractors desiring to become licensed as a limited liability company have had is to obtain a $100,000 surety bond and a minimum $1 million general liability insurance policy for up to five employees, with an additional $100,000 of limited liability insurance coverage per additional employee not to exceed a total of $5 million. These policies had to be written by an insurer or insurers duly licensed by this state. This bill will additionally permit those policies to be written by an eligible surplus line insurer which should make the policies easier to obtain. SB 261 (Monning) – Chapter 163 of 2013 Statutes – Fraudulent Use of License This bill expands the Contractors’ License Board’s administrative authority to encompass additional instances when a licensed or unlicensed contractor has improperly or fraudulently
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 13
www.marinba.org ◆ [email protected] ◆ [email protected]
6
used a contractor’s license. This would permit the CSLB to punish the violation of general restrictions on license usage with warning letters, citations or fines, or even suspension or revocation of a contractor's license, without having to rely on local law enforcement. SB 262 /(Monning) – Chapter 180 of 2013 Statutes – RMO – Qualifying Individuals This bill requires the Responsible Managing Officer (RMO) qualifying on behalf of a firm to be responsible for exercising direct supervision and control as defined in CSLB regulations to secure compliance with the Contractors Law. It provides that a qualifier's failure to exercise direct supervision and control shall constitute a cause for disciplinary action and shall be punishable as a misdemeanor by imprisonment in a county jail not to exceed six months, by a fine of not less than $3,000, but not more than $5,000, or by both a fine and imprisonment.
Design/Build AB 195 (Hall) – Chapter 121, 2013 Statutes – Extension of Design/Build Authority This bill extends, from July 1, 2014 to July 1, 2016, the date on which the statutes authorizing counties to use the design-build contracting method expire.
Employer/Employee AB 10 (Alejo) - Chapter 351, Statutes of 2013 - Minimum wage: annual adjustment. This bill will increase the minimum wage, on and after July 1, 2014, to not less than $9 per hour. The bill would further increase the minimum wage, on and after January 1, 2016, to not less than $10 per hour. AB 263 (Hernández, Roger ) Chapter 732, Statutes of 2013 - Employment: retaliation: immigration-related practices. This bill will prohibit an employer from retaliating or taking adverse action against any employee or applicant for immigrant-related practices. The bill will provide that an employee who was retaliated against or otherwise was subjected to an adverse action is entitled to reinstatement and reimbursement for lost wages. The bill will subject a person who violates these provisions to a civil penalty of up to $10,000 per violation. AB 442 (Nazarian) – Chapter 735 Statutes of 2013 – Employee Wages This bill authorizes the Labor Commissioner to collect liquidated damages from an employer who pays an employee less than minimum wage. SB 288 (Lieu) – Chapter 756 of 2013 Statutes – Employment Protections: Time Off This bill provides that an employer may not discharge or in any manner discriminate or retaliate against an employee who is a victim for taking time off from work, upon the victim's request, to appear in court to be heard at any proceeding for the following offenses:
Vehicular manslaughter while intoxicated.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 14
www.marinba.org ◆ [email protected] ◆ [email protected]
7
Felony child abuse likely to produce great bodily harm or a death. Assault resulting in the death of a child under eight years of age. Felony domestic violence. Felony physical abuse of an elder or dependent adult. Felony stalking. Solicitation for murder. A serious felony, such as kidnapping, rape, or assault. Hit and run causing death or injury. Felony driving under the influence causing injury.
For the purposes of this law, a proceeding includes any delinquency proceeding, involving a post-arrest release decision, plea, sentencing, post-conviction release decision, or any proceeding in which a right of the victim is at issue. It defines a victim as any person who suffers direct or threatened physical, psychological, or financial harm as a result of the commission or attempted commission of a crime or delinquent act. The term "victim" also includes the person’s spouse, parent, child, sibling, or guardian. SB 292 (Corbett) - Chapter 88, Statutes of 2013 - Employment: sexual harassment. Clarifies that, with respect to an employment-related sexual harassment claim made under the Fair Employment and Housing Act (FEHA), sexually harassing conduct need not be motivated by sexual desire. SB 390 (Wright) – Chapter 718 of 2013 Statutes – Failure to Remit Employee Wage Withholdings This bill provides that it is illegal for an employer to willfully or with the intent to defraud fail to remit withholdings from an employee's wages pursuant to local, state or federal law to the proper agency, and also provides that if an employer fails to remit $500 or more in wage withholdings, the employer's violation is a misdemeanor and shall be punishable by imprisonment in a county jail for a period of not more than one year, by a fine of not more than $1,000, or both. SB 435 (Padilla) – Chapter 719 of 2013 Statutes – Compensation: Meal and Rest or Heat Recovery Periods Sponsored by several unions, this measure will clarify how paid rest breaks and recovery periods (to comply with heat illness regulations) are to be compensated by employers when employees are paid on a piece-rate basis. Proponents argue that piece-rate workers, unlike their hourly or salaried counterparts, are often induced to work through their rest or recovery periods because they suffer a loss of income. They believe this bill is necessary to increase incentives for piece-rate workers to actually take their rest and heat stress recovery periods rather than "willingly" working through them to avoid losing money. SB 462 (Monning) – Chapter 142 of 2013 Statutes – Employment: Compensation Makes the award of attorney's fees and costs where the prevailing party is not an employee contingent on a finding by the court that the employee brought the court action in bad faith. SB 666 (Steinberg) – Chapter 577 of 2013 Statutes – Employment: Retaliation
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 15
www.marinba.org ◆ [email protected] ◆ [email protected]
8
This bill provides for a suspension or revocation of an employer’s business license for retaliation against employees and others on the basis of citizenship and immigration status, and establishes a civil penalty up to $10,000 per violation. SB 770 (Jackson) – Chapter 350 of 2013 Statutes – Paid Family Leave This bill expands the type of family members for whom an employee may seek wage replacement benefits under the Paid Family Leave (PFL) and does not place any new mandates on employers. This legislation will not go into effect until July 1, 2014.
Excavation
AB 811 (Lowenthal ) - Chapter 250, Statutes of 2013 - Excavations: regional notification center system: contractor certification. You may recall that the Public Utilities Commission and several legislators have been pushing legislation over the past two years that would significantly increase the fines for not calling Dig Alert before excavating. We were able to amend these efforts instead into AB 811 which is a data collection bill. Starting in January 0f 2014, utilities, excavators and other affected parties will be able to go online and file a report about an incident (for a contractor, he will have the opportunity to document that it was a utility’s fault due to mismarking or not marking in the first place). I will discuss this more in a future update when more information is available.
Land Use AB 116 (Bocanegra) - Chapter 62, Statutes of 2013 - Land use: subdivision maps: expiration dates. This bill will extend by 24 months the expiration date of any approved tentative map or vesting tentative map that was approved on or after January 1, 2000.
Public Works/Prevailing Wage AB 44 (Buchanan) - Chapter 258, Statutes of 2013 - Subletting and Subcontracting Fair Practices Act: bidding practices Starting on July 1, 2014 all contractors submitting bids to public agencies will have to list the contractor’s license number of all subcontractors whose bids are over ½ of 1%. If an error is found in the license number that is listed, a contractor will have 24 hours after the bid is due to correct the mistake. AB 164 (Wieckowski) – Chapter 94 Statutes of 2013 – Payment & Performance Bonds For P3 Projects Requires the use of payment and performance bonds in local government infrastructure projects that are financed through public-private partnerships (P3s). AB 1336 (Frazier) – Chapter 792 of 2013 Statutes - Prevailing wages: payroll records.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 16
www.marinba.org ◆ [email protected] ◆ [email protected]
9
Existing law requires the Labor Commissioner, if the commissioner or his or her designee determines after an investigation that there has been a violation of the public works provisions, to issue a civil wage and penalty assessment to the contractor or subcontractor, or both. The assessment is required to be in writing, describe the nature of the violation and the amount of wages, penalties, and forfeitures due, and include the basis for the assessment. The assessment is required to be served not later than 180 days after the filing of a valid notice of completion in the office of the county recorder in each county in which the public work or some part thereof was performed, or not later than 180 days after acceptance of the public work, whichever occurs last. If the assessment is served after the expiration of the 180-day period, but before the expiration of an additional 180 days, and the awarding body has not yet made full payment to the contractor, the assessment is valid up to the amount of the funds retained. This bill will change the deadline for service of the assessment to not later than 18 months after the filing of a valid notice of completion in the office of the county recorder in each county in which the public work or some part thereof was performed, or not later than 18 months after acceptance of the public work, whichever occurs last. The bill will delete the provisions with regard to an assessment served after the expiration of the 180-day period. SB 54 (Hancock) - Chapter 795, Statutes of 2013 - Building Trades & Oil Refinery Work In a battle between the building trades and refinery workers’ union, the building trades won! This bill will extend prevailing wage requirements to private refinery construction, and also give union tradesmen first dibs on refinery jobs, elbowing aside members of the refinery workers union! SB 328 (Knight) – Chapter 517 of 2013 Statutes – Counties, public works contracts This bill, until January 1, 2018, allows a county, with the board of supervisors' approval, to use construction manager (CM) at-risk construction contracts for erecting, constructing, altering, repairing, or improving buildings owned or leased by the county. This bill provides that a county may use a CM at-risk construction contract only for projects in the county in excess of $1million, and allows a county to award the CM at-risk construction contract using either the lowest responsible bidder or best value method. Subcontractors are afforded the same protections they are provided in other provisions of the Public Contract Code. SB 377 (Lieu) – Chapter 780 of 2013 Statutes – Public Works – Project Determinations This bill requires the Director of the Department of Industrial Relations (DIR) to establish a new process to determine whether a project is a public work, upon the request of any party. It also provides that the period of service for assessments for prevailing wage violations shall be tolled for the period of time required by DIR to determine whether a project is a public work. The measure also provides that the period of service for assessments shall also be tolled for the period of time that a contractor or subcontractor fails to provide certified payroll records in a timely manner. It provides that these tolling provisions shall also apply to the period of time for commencing an action brought by a joint labor-management committee. It requires DIR to make
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 17
www.marinba.org ◆ [email protected] ◆ [email protected]
10
that determination within 60 days of receipt of the last notice of support or opposition from any interested party, but upon request for additional time can have an additional 60 days. SB 425 (DeSaulnier) – Chapter 252 of 2013 Statutes – Public Works Peer Review Act Allows a public agency that is principally charged with the administration, planning, development, and operation of a public works project (administering agency) to establish a peer review group of qualified persons to give expert advice on the scientific and technical aspects of the public works project. All peer review members will be required to provide a statement that authorizes a peer reviewer to conduct his or her duties under the charter impartially, without restriction or limitation, and in a manner the peer reviewer believes is necessary to appropriately review a proposed project; and, a statement that declares whether the members of the peer review group have signed a conflict of interest disclosure form that would identify real or perceived conflicts between a peer reviewer and the specified public works project. SB 776 (Corbett) – Chapter 169 of 2013 Statutes – Prevailing Wage Rates – Employer Payment Credits Establishes additional restrictions on credit granted against the obligation to pay prevailing wages for employer payments made to monitor and enforce public works laws. Specifically, it:
Prohibits credit from being granted for employer payments made to monitor and enforce law related to public works if those payments are not made to a program or committee established under the federal Labor Management Cooperation Act of 1978.
Provides that an employer may take credit for those specified employer payments, even if those payments are not made (or costs are not paid) during the same pay period for which credit is taken, if the employer regularly makes those payments on no less than a quarterly basis.
Tire Recycling
AB 513 (Frazier) - Chapter 499, Statutes of 2013. - Tire recycling program: rubberized asphalt. Will establish the Rubberized Asphalt Concrete Market Development Act and will require the Department of Resources Recycling and Recovery, in accordance with the tire recycling program, to award grants for certain public agency projects that utilize rubberized asphalt concrete.
Our Sponsored Bills For 2013 This session we sponsored four important construction industry-related bills - AB 536 (Wagner), AB 1212 (Levine), AB 1353 (Linder) and SB 399 (Wright). The first three are two-year bills, meaning that they are carried over until next year, while SB 399 was vetoed.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 18
www.marinba.org ◆ [email protected] ◆ [email protected]
11
Following is a brief description of each of our sponsored measures for 2013: AB 536 - (Wagner) – Two-Year Bill - The Prompt Pay statutes are turning into a mess of loopholes that prevent contractors from being paid what they are legitimately owed. They provide no relief to contractors against a sophisticated owner. Worse, they provide those owners with excuses for withholding more money due to a loophole within the existing statute. Section 7107 (e) of the Public Contract Code states: (e) The original contractor may withhold from a subcontractor its portion of the retention proceeds if a bona fide dispute exists between the subcontractor and the original contractor. The amount withheld from the retention payment shall not exceed 150 percent of the estimated value of the disputed amount. Unfortunately, "disputed amount" is not defined in the statute. How AB 536 Will Address the Problems AB 536 is intended to correct this major loophole in the current prompt pay statutes by defining three specific things which cannot be included in a disputed amount. This will ensure that the process is fair and equitable to all sides. The 3 specific things that the measure proposes are: 1). With respect to liquidated damages assessed by the owner, any amount in excess of the liquidated damages assessment. This provision addresses a problem construction attorneys have encountered in southern California: When a contractor protests against a liquidated damages assessment, some agencies have responded that the protest makes the amount of LDs a "disputed amount" for which the agency can withhold not just the amount of LDs, but 150% of the amount of LDs. The broad language of Martin Bros. appears to support this argument The first sentence in the pattern is designed to preclude such EXCESS withholding by saying that any withhold IN EXCESS OF the amount of LDs will NOT go into the safe harbor for protection against prompt payment penalties. Only the withhold for the actual amount of the LDs will go into the safe harbor. 2). With respect to mechanics liens and stop payment notices, any amount in excess of what the owner is permitted by law to withhold from the direct contractor on account of such mechanics lien or stop payment notices.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 19
www.marinba.org ◆ [email protected] ◆ [email protected]
12
This provision addresses what amounts to an affirmative claim by a subcontractor - either by a mechanics lien or a stop payment notice. By other statutes, the owner can withhold 125% of the lien/stop payment notice claim from the prime contractor. The prime contractor is, of course, entitled to withhold that same amount from the subcontractor - and to have that withhold go into the safe harbor. However, under Martin Bros., if the prime contractor disputes the mechanics lien or stop payment notice amount, then that claim amount becomes a "disputed amount" for which the prime contractor can withhold from the subcontractor 150% x 125% = 187.5% of the amount of the lien/stop payment notice claim. This provision is designed to preclude such EXCESS withholding by saying that any withhold IN EXCESS OF the amount withheld by the owner on account of the lien/stop payment notice will NOT go into the safe harbor for protection against prompt payment penalties. Only the withhold for the amount withheld by the owner will go into the safe harbor.
None of ECA’s proposed language will preclude general contractors from withholding funds from subcontractors who fail to pay their suppliers, fail to pay their insurance premiums, fail to pay civil judgments, fail to rectify defective work, etc.
Nothing in AB 536 has ever sought to define what constitutes a "disputed amount" - it
only seeks to identify 3 things that are NOT disputed amounts under the broad language of the statute and Martin Bros.
3). The amount of any claim for additional compensation by the direct contractor against the owner. This provision addresses the affirmative claim discussed in Martin Bros. Construction, Inc. v. Thompson Pacific Construction, Inc. (2009) 179 Cal. App. 4th 1401, 102 Cal. Rptr. 3d 419. See page 2, lines 31 to 34; page 3, lines 26 to 28; page 4, lines 24 to 26; page 5, lines 10 to 13 and lines 37 to 39; page 8, lines 3 to 6; page 9, lines 7 to 10. To the extent that a subcontractor may breach a subcontract by making affirmative claims for additional compensation, AB 536 does prevent the prime contractor from withholding, from payments otherwise due, 150% of the amount of those affirmative claims for additional compensation. To the extent that a subcontractor may breach a subcontract by pursuing a mechanics lien or stop payment notice remedy, AB 536 limits the withholding from the subcontractor to just the amount the owner withholds from the prime Contractor on account of that mechanics lien or stop payment notice. To the extent that a subcontractor may breach a subcontract by causing the owner to assess LDs against the prime Contractor, AB 536 limits the withholding from the subcontractor to just the amount of LDs the owner is withholding from the prime Contractor. Nothing in AB 536 precludes the prime Contractor from making its own claim for delay damages - separate from the LDs pass-through - AND withholding that amount from the subcontractor AND having that withhold go into the safe harbor for protection against prompt payment penalties.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 20
www.marinba.org ◆ [email protected] ◆ [email protected]
13
In conclusion, AB 536 will ensure that all parties in a dispute are protected without allowing for “gaming” of the system. AB 1212 - (Levine) – Two-Year Bill - Existing law encourages contractors and manufacturers bidding on public works contracts to submit a bid which utilizes an equal to or greater technique or product in lieu of that which has been specified in the original request for proposal by the public agency. Unfortunately, current law allows public agencies to require these “Or-equal” submittals prior to the actual bid day. This is a major disincentive to any contractor, because there is nothing preventing the agency from sharing the information with other competitors who in-turn can then underbid contractor’s innovation. Consequently, innovations and/or major cost savings that could be derived are often withheld by potential bidding contractors due to this requirement. In other words, what incentive does a prospective bidder have to provide a major cost savings or innovation to the public agency if it is going to be shared with his competitors prior to bid day? Indeed competition, which is driven both by price and by innovation, is truly the lifeblood of all public works contracts. This measure will serve to provide safeguards to prospective innovative bidders by simply stating: No data substantiating a request for a substitution of "an equal" item shall be disclosed to other potential bidders prior to the time when bids are received. AB 1353 - (Linder) – Two-Year Bill - This measure was introduced in an effort to define what a subcontractor is within the Public Contract Code. However, AB 44 (Buchanan) accomplished what we had intended. Hence, we will be amending this measure to fix another problem/issue in 2014 which hasn’t been decided as of this writing. SB 399 - (Wright) – VETOED - As background, John Malloy, a long time engineering contractor, was called by the LA Office of the California Department of General Services to perform an emergency sewer repair job at the State Building in LA back in the beginning of October, 2012. The problem was so bad that they had to close the building because of the unsanitary conditions!
It turned out that the lateral sewer line which traverses between the main trunk sewer line from the street into the building was broken. Fortunately, Mr. Malloy was able to successfully replace the broken pipe and sent the state a bill for the work when it was completed. Unfortunately, despite having enough urgency to have Mr. Malloy come out immediately to repair the sewer
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 21
www.marinba.org ◆ [email protected] ◆ [email protected]
14
problem, DGS totally ignored both his invoice and his phone calls inquiring about the money owed to him!!
I was contacted in early January, 2013 to see if I could “shake the money loose.” Even with my assistance and close working relationship with the executive offices of DGS, it took an additional 6 weeks before Mr. Malloy was finally paid!
SB 399 (Wright) would have narrowly expanded existing law. Simply, the legislation was written so that as long as state agencies did their jobs and made payments within the existing 45 day payment window, there absolutely would be no additional costs to the state resulting from SB 399. Once the contractor had provided all the required documentation (such as proof of workers’ compensation, general liability coverage, etc. that protects the interests of the state as well as the workers that were on the job), the prompt payment clock would start ticking. Once the 46th day had been reached and every day thereafter until the payment was made, contractors who performed work on an emergency basis would have qualified to receive interest under the existing provisions in the Government Code which certified small Businesses and others currently benefit from – namely an interest rate of 10 percent above the United States Prime Rate on June 30 of the prior fiscal year. This measure was not intended to enrich ANY contractor; rather, it was intended to serve as a bright light to state agency executives should they start to see interest penalty payments reflected in their accounting data. It would then be hoped (and expected), that remedies would be found quickly to ameliorate the problems. In (what we hope were) those rare instances that payment to a contractor exceeded 45 days , it was only appropriate that the contractor who successfully completed the project be fairly compensated, just as certified small businesses currently are under this section of the law. Our point to the governor was, “remember, despite not having received their payment from the state, contractors still have to keep their doors open which means ALL of their overhead costs (before ANY profits can be made!) must still be paid!”
Incredibly, despite passing through both Houses of the Legislature with a unanimous Aye vote, Governor Brown ignored the wisdom of the Legislature and instead listened to his bureaucrats in the Department of General Services and VETOED our sponsored bill! Following is Governor Brown’s veto message (which is in classic “bureaucratese” that could only be written by a bureaucrat for the governor to make “their” argument!
Governor's Veto Message
I am returning Senate Bill 399 without my signature. It is the policy of the state to provide for the timely payment of every state contract whether the work is completed on a standard or emergency basis. For the rare occasion when timely payment does not occur, current law provides specific safeguards. Recognizing the distinct struggles faced by small businesses and nonprofit organizations, increased safeguards are provided for these entities, including a higher late payment penalty. Extending the higher penalty rate to all contracts in a narrowly defined category regardless of the size of the contractor would be inconsistent with the state's policy of reserving this additional protection for those that need it most. Sincerely Edmund G. Brown Jr.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 22
www.marinba.org ◆ [email protected] ◆ [email protected]
15
2014 Activities Besides the aforementioned two-year bills that are carry-overs into 2014, there will be several other bills we will be looking at, including:
Disgorgement - Over the past three years, we have introduced two separate bills to address the draconian problem known as disgorgement. Indeed, Business and Professions Code Section 7031 governs civil actions brought (1) by contractors to recover compensation payable for work performed, and (2) by property owners or prime contractors to force contractors or subcontractors to disgorge compensation received for work performed when the contractor/subcontractor was unlicensed. If a person performing work requiring a contractor's license is not duly licensed during the entire project, or contracts for or performs work outside of the person’s license classification, that person is prohibited by Section 7031 from bringing a civil action against the property owner or prime contractor to recover ANY amount due under the contract. Even if the person had been previously licensed and performed the work to everyone’s satisfaction, a lapse of license for a single day could bar the contractor from bringing a civil lawsuit against the owner or prime contractor to recoup amounts due for labor and materials. In 2013, we teamed-up with the Contractors’ License Board to sponsor SB 263 (Monning) in hopes of resolving this serious problem. Again due to the complexity of the issue, it became a two-year bill. I am hopeful that 2014 will be the year when we finally are able to effect some major changes to this draconian provision within existing law. Legislation to Require Competitive Bidding on Public Works Not Now Requiring It - Require all public entities that are not mandated to competitively bid all construction work over $2,500 to do so unless bound by its charter, ordinance or statute. Now more than ever, ALL public entities should be required to competitively bid ALL construction work over $2,500! This is one of the bills we are considering for introduction in 2014 Reduce the Disincentive to Vindicate the Competitive Bidding Laws By Alleviating Some of the Cost of a Successful Bid Protest. When a bidder proves in court that he was illegally denied a contract, AND (2) the job no longer exists (because it has been partially or completely performed under the illegal contract), then the public agency should have to pay the SUCCESSFUL bid protestor's attorney fees. Require Public Agencies to Provide Job Site Storage Yard – I have already begun working with local agencies to see if something can be done about agencies not providing job site storage yards. Allow Four Day, Ten Hour Work Week This is a matter of great importance to every contractor and his employees and is something I have been working on for more than a decade. The question is why shouldn’t employers allow employees to work four, ten hour days if both parties agree? Unfortunately when dealing with
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 23
www.marinba.org ◆ [email protected] ◆ [email protected]
16
public works, the California State Constitution prevents this from happening! Written into the constitution back in the 1800s, there are only two ways that we will ever be able to change this requirement: 1). Introduce a bill that ultimately obtains a two thirds vote of the Legislature which is then signed by the governor. Next, it would have to be placed on the general election ballot and approved by a majority (plurality) of the voters (50% plus 1). 2). Qualify a ballot initiative for the general election ballot. Again, it would have to be approved by a majority of the voters. I am committed to making this a priority issue once again in 2014. Please bear in mind however, the odds are very much against us because it will require union support - but they will only want a bill that addresses signatory contractors. Again, despite these potential obstacles, I am committed to trying to make this happen. Be Prepared to Introduce Legislation Quickly on an As-Needed Basis It seems that virtually every year there always is a last-minute need to have a bill introduced to address an unforeseen problem or issue. As always, I stand ready to meet the challenge again in 2014. Private Infrastructure Besides legislation, I am moving ever closer to FINALLY obtaining a 100% privately owned and financed infrastructure project. I feel strongly that if I can obtain one successful project, it will truly open the gates to many more in the future. I will hopefully have more news to report on in the near future! Help With Obtaining a Contractor’s License, or Resolving A Problem In 2013, I assisted many members in helping them obtain a contractor’s license, add an additional license classification or to resolve a citation or potential citation. In addition, I have significant contacts with most other state and local agencies in case you need my assistance on another matter. Remember, with almost 41 years of experience and amazing contacts made, why not see what I can do to assist you! Call me at (916) 784-7055 or email me at [email protected] Wrap-Up I want to thank you for your continued support. 2014 marks the commencement of my 16th year of representing your interests in Sacramento and my 41st year “in the halls” of the Capitol. My passion and enthusiasm as your legislative advocate becomes stronger each year which I believe shows by my many successes on your behalf. There are still many challenges ahead, but with your continued support I will continue to give 1000% of my efforts!
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 24
The Capitol Connection Q&A for Contractors By Shauna Krause, Capitol Services, Inc.
An angry contractor shows there is a fine line between knowing something and actually proving it. We primarily serve contractor and industry licensing needs, but are also ready, willing and able to help consumers with questions. This also helps licensed contractors by exposing those unlicensed scam artists ‘un-leveling’ the playing field or driveway as the case may be…
Q: Real Estate offices in our town may knowingly refer out business to unlicensed contractors. Can they face penalties for doing this if reported? This is not a fair practice and undercuts the licensed contractor.
A: Thank you for contacting Capitol Services. While there is no way to know until the complaint is actually filed, it’s possible that the CSLB might consider that referral “aiding and abetting” and cause for a disciplinary action. B&P Code Section 7114 states “Aiding or abetting an unlicensed person to evade the provisions of this chapter or combining or conspiring with an unlicensed person, or allowing one’s license to be used by an unlicensed person with the intent to evade the provisions of this chapter constitutes a cause for disciplinary action.”
I agree that the agency is definitely out of line if they are referring work out they know amounts to over $500.00. You would need to provide
the CSLB with some sort of proof that the Real Estate agency is knowingly referring business to unlicensed contractors.
Q: I was given your name by my son, who said he found Capitol Services’ email on the Internet. He said you might be able to answer a question regarding hiring a contractor since this is what you deal with. Here’s my situation: A man came to my door saying he just happened to be in the neighborhood and had some left over materials. He told me he had just repaved a neighbor’s driveway and could also do mine for a “very low price”. After asking him some questions including the neighbor’s name, something sounded fishy so I sent him away.
However, my driveway does need repairs so what would you recommend to find someone to do this work. By the way, do you work for the State?
A: Thank you for the email. Just to be clear, we are not the State Contractors Board but from time to time receive calls and emails from people who think we are. In most cases my staff and I are happy to respond to these type of inquires if we can.
You were probably smart to send him away. Over the years, this type of door-to-door approach has been done by individuals who are unlicensed and do not carry the proper insurance and bonding. The best thing to do is contact at
least three contractors who have a valid State contractor’s license. By getting bids from several contractors you’ll be able to compare prices and likely get a better deal. Look for a contractor who holds a “C-12” (Earthwork and Paving) or “A” (General Engineering) classification. Ask neighbors and friends if they’ve needed this type of work or search the Internet for legitimate contractors.
To determine if a contractors license is in good standing, I recommend you visit the CSLB web site (http://www.cslb.ca.gov). For any construction project $500 or more a state license is required to legally do this type of work. Local police might also be interested in these types of ‘door to door’ contractors as previous victims come forward.
While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento, CA 95814. Research past columns at www.
cutredtape.com.
www.marinba.org ◆ [email protected] ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 25
SMALL EMPLOYERS: HEALTHCARE REFORM UPDATE
The health insurance marketplaces created by the Affordable Care Act will open on Oct. 1. Most small employers—those with 50 or fewer full-time employees—are not required to offer health insurance coverage under the Affordable Care Act. Even businesses with more than 50 full-time employees have received a one-year reprieve from penalties if they don’t offer insurance. But all companies, regardless of size, are required to notify their employees about the Obamacare marketplaces.There’s also another feature of the law that was supposed to help small businesses: a tax credit to help the smallest ones buy health insurance. It has been around since 2010 on a smaller scale, but starting in 2014, they’ll be able to get a credit for up to 50 percent of their health care premium costs if they buy insurance through one of the SHOP exchanges.It’s only for really small businesses, though — those that have fewer than 25 employees (or their “equivalents,” again), pay less than $50,000 a year in average wages and pay for at least half of the premiums themselves. And they only get the full credit if they have 10 or fewer full-time workers and their average wages are less than $25,000 a year.Smaller companies with fewer than 50
employees, while not required to provide health insurance, need to inform employees about the law and make sure new healthcare plans (if they offer them) comply with Obamacare.
Make sure you’ve addressed the requirements that went into effect in 2012 or earlier:• Provide your employees with a Summary
of Benefits and Coverage from your insurer, clearly explaining what their plan covers and what it costs.
• Make sure any health accounts you have set up for your employees, such as flexible spending accounts (FSAs), health reimbursement accounts (HRAs) or health savings accounts (HSAs), comply with new rules:
1. They can no longer be used to buy over-the-counter drugs (except insulin) without a prescription.
2. ◦Employees are limited to contributing no more than $2,500 to FSAs.
3. ◦Employees will pay higher penalties (20%) for withdrawing HSA funds for nonmedical expenses.
Prepare to comply with these requirements in 2013 and beyond:• If you have not been providing insurance,
investigate your options now. If you have fewer than the full-time equivalent (FTE) of 50 employees, you don’t have to provide coverage. But you may want to see if you can afford it. Beginning in 2014, you can buy coverage through insurance marketplaces
(exchanges). If you have fewer than 25 employees, you also may be eligible for tax credits.
www.marinba.org ◆ [email protected] ◆ [email protected]
OBAMACARE – SMALL BUSINESS – ARE YOU READY?by Mike Carlson, Marin Builders Association Health Plan – Program Manager
Email inquiries to: [email protected]
CONFUSED?The Patient Protection
and Affordable Care
Act (PPCA), or Affordable Care
Act (ACA) for short,
is the new health care
reform law in America
and is often called by
its nick-name Obamacare.
The Patient Protection and
Affordable Care Act
are made up of the
Affordable Health Care
for America Act and the
Patient Protection Act.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 26
www.marinba.org ◆ [email protected] ◆ [email protected]
• If you do provide insurance, make sure your health plan meets these new requirements:
• ◦Is adequate and affordable: Insurance is considered “inadequate” if it pays less than 60% of health care expenses for a typical population and “unaffordable” if employees have to pay more than 9.5% of their family income to buy it.*
1. Does not exclude people with pre-existing medical conditions.
2. Does not put annual or lifetime limits on coverage.
3. Does not allow coverage to be canceled solely because of an honest mistake an employee made on the insurance application.
4. Does not make new employees wait more than 60 days for coverage.
5. Provides coverage for employees’ adult children up to age 26.
6. Provides essential benefits,* including:◾Ambulatory patient services◾Emergency services◾Hospitalization◾Maternity and newborn care◾Mental health and substance use disorder services, including behavioral health treatment◾Prescription drugs◾Rehabilitative and habilitative services and devices◾Laboratory services
◾Preventive and wellness services and chronic disease management◾Pediatric services, including oral and vision care7. Allows children to use a pediatrician as their
primary care provider.*8. Allows women to use an ob-gyn as their
primary care provider.*9. Allows patients to receive emergency
care at a non-network hospital without preauthorization and without paying a higher copay or coinsurance.*
10. Limits annual cost sharing to the caps on the high-deductible plans that are linked to health savings accounts. Currently, those limits are $6,250 per year for individuals and $12,500 per year for families. In addition, small group plans must cap deductibles at $2,000 for individual coverage and $4,000 for family coverage.*
11. Provides required preventive care with no copay.*
• By Oct. 1, notify your employees about the availability of health insurance marketplace (exchange) plans and that they may be eligible for subsidies to help pay for coverage. Here is the template of information required for employers who offer coverage. Further guidance, and templates for
employers who will not be offering coverage, are available from the Department of Labor.
• Inform your high-wage employees ($200,000 for individuals; $250,000 for joint filers) of new Medicare payroll and investment income taxes — effective in 2013 — and adjust your payroll system accordingly.
• Report to the federal government on whether you offer health coverage, the total number and names of those receiving coverage, and the cost of the plan. The first report is due in 2015 for the year 2014.
• Decide whether you want to offer expanded wellness incentives. Starting in 2014, businesses can offer discounts of up to 30% off insurance premiums to employees who take part in employer-sponsored wellness programs. This is an increase from the 20% discount previously allowed.
*Requirements don’t apply to grandfathered plans — those that were in effect on March 23, 2010, and that have not changed substantially. For information on grandfathered plans, see this federal website. Mike CarlsonBuilders Exchange Health Plan – Program ManagerEmail inquiries to: [email protected]
The Marin Builders Association has simplified the selection and
enrollment process of Medical Insurance.
By combining the purchasing power of several Exchanges we’ve created a
single source offering of Medical, Dental, Vision and Life Insurance.
Included are 10 Medical plans which offer PPO and HMO delivery
systems and the full complement of administrative services.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 27
www.marinba.org ◆ [email protected] ◆ [email protected]
New Workers’ Comp & Insurance Program for the:
George Petersen Insurance Agency
George Petersen Insurance Agency175 W. College AvenueSanta Rosa, CA 95401
1.800.236.9046 | 707.525.4150Fax 1.888.579.2843 | 707.525.4175
License #0603247www.gpins.com
Brought to you by:
Endorsed Broker of the
1.
2.
3.
4.
5.
6.
For more information, please contact:
Bruce Okrepkie: 707.360.4117 or [email protected] Walters: 707.525.4168 or [email protected] Parsons: 707.525.2715 or [email protected]
Reasons to Enroll in the New MBA Insurance Program:
MBA members receive preferred pricing and benefit from group buying power through exclusive carrier
Access to George Petersen’s exclusive online Human Resources and Safety & Loss Control portal
Work with one of three highly knowledgeable agents from George Petersen Insurance Agency who specialize in construction, and have access to their dedicated support team
Access to the George Petersen Insurance Agency Newsletter
Outstanding customer service
Continued access to MBA’s safety programs
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 28
Construction Safety - Demolition 1
Required preparations prior to starting:
• Site study: Before beginning the actual work of demolition, a careful study should be made of the structure that is to be torn down, as well as its surroundings. A definite plan or procedure should then be mapped out, and thereafter followed as closely as possible. The following rules should be incorporated as part of this plan.
• Shoring of other buildings: This is often necessary, and plans should be made to carry out all operations of this kind promptly.
• Structures wrecked by fire, flood, explosion or other catastrophe: It may be necessary to shore up or brace some of the walls of the building that are to be taken down, before the wrecking operations can be safely started.
• Notify and protect the public: Before the wrecking operations begin, protection of the public against falling objects should be provided when the building stands close to a street or to a much frequented roadway of any kind. The entire sidewalk adjoining the building should be fenced off, and sidewalk sheds constructed where necessary. Sidewalk sheds should be capable of supporting a load of 150 pounds per square foot. If material is to be piled on the sheds, they should be able to support 300 pounds per square foot.
• Utilities: All gas, electricity and water should be shut off at the outset, and all windows, glass doors and other fragile fixtures removed before proceeding with any other work. The lath and plaster then should be stripped off throughout the entire building.
• Personal protective equipment: Employees should use hard hats, safety goggles, safety shoes and gloves are particularly recommended. All floor openings should be kept covered, except where in actual use for lowering materials. If this is not feasible, toe-boards and hand rails should be installed around the openings.
• Proceed systematically: Proceed story by story, and the work on the upper floors should be completed before any of the supporting members on the lower floors are disturbed.
• Material removal: Material should never be thrown to the ground. It should be lowered to the ground or to the top of the sidewalk shed by means of rope and suitable tackle. Debris should be removed by means of wooden or metal chutes.
• Projective nails: All projecting nails in boards, planks and timber should be carefully removed, hammered in or bent in a safe way. Good housekeeping is of extreme importance.
This form documents that the training specified above was presented to the listed
participants. By signing below, each participant acknowledges receiving this training. Organization: Trainer: Trainer’s Signature: Class Participants:
SAFETY Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 29
Seguridad en la construcción – Demolición 1
Preparaciones necesarias antes de comenzar:
• Estudio del lugar: Antes de comenzar la tarea específica de demolición, se debe realizar un estudio cuidadoso de la estructura que será demolida, así como también de sus alrededores. Luego se deberá establecer un plan o procedimiento definitivo, que deberá seguirse posteriormente intentando apegarse a él lo más posible. Las siguientes reglas se deben incorporar como parte del plan.
• Apuntalamiento de los demás edificios: Esto suele ser necesario, y se deben hacer planes para llevar a cabo rápidamente todas las operaciones de este tipo.
• Estructuras dañadas por fuego, inundación, explosión u otras catástrofes: Puede ser necesario apuntalar o reforzar algunas de las paredes del edificio que habrá de demolerse, antes de que puedan comenzar las operaciones de demolición de forma segura.
• Avise y proteja al público: Antes de comenzar las operaciones de demolición, se deberá brindar protección al público contra la caída de objetos, en caso de que el edificio se ubique cerca de una calle o en una vía de comunicación concurrida de cualquier tipo. Se deberá colocar una valla a lo largo de toda la acerca colindante al edificio y, si fuera necesario deberá de construirse un cobertizo sobre la misma. Esta protección deberá ser capaz de soportar 150 libras por pie cuadrado. Si se va a acumular material sobre los cobertizos, deberán soportar 300 libras por pie cuadrado.
• Servicios: Todos los servicios de gas, agua y electricidad deberán ser suspendidos antes de la demolición, y además deberán retirarse todas las ventanas y puertas así como otras instalaciones frágiles antes de proceder con cualquier otra tarea. Todas las tablas delgadas y placas de yeso deben retirarse del edificio.
• Equipamiento de protección personal: Los empleados deberán usar cascos, anteojos, calzado de seguridad y guantes, como recomendación especial. Cualquier abertura en los pisos deberá mantenerse cubierta, salvo cuando estén en uso para el descenso de materiales. Si esto no fuera posible, se deberán instalar zócalos y pasamanos alrededor de estas aberturas.
• Proceder de modo sistemático: Avance paso a paso, y el trabajo de los pisos superiores deberá terminarse antes de que cualquier integrante del equipo de apoyo en los pisos inferiores sea molestado.
• Retiro de material: El material nunca deberá ser arrojado al piso. Deberá ser descendido al terreno o al techo del cobertizo de la acera por medio de cables y aparejos apropiados. Los desperdicios deben ser retirados a través de conductos de madera o metálicos.
• Clavos salientes: Todos los clavos salientes en tablas, planchas y madera deberán ser retirados con cuidado, martillados o doblados de algún modo seguro. Una buena limpieza es de extrema importancia.
SAFETY Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 30
LICENSED CONTRACTORS FOR QUALIFIED BIDDERS FOR THE WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
On June 3, 2009, the Board of Education of the West Contra Costa Unified School District approved Resolution 90-0809. The resolution places the District under the Uniform Public Construction Cost Accounting Act. Under Section 22036/of the act, the District is inviting all licensed contractors to submit the name of their firm to the District for inclusion on its list of qualified bidders for the following calendar year (2014). Contractor’s must provide the name and address to which a Notice to Contractors or Proposal should be mailed, a phone number at which the contractor may be reached, the type of work in which the contractor is interested and currently licensed to execute (earthwork, pipelines, electrical, painting, general building, etc.) together with the class of contractor’s license (s) held and the contractor license number (s). This information should be submitted to:
Davillier-Sloan, Inc. 1630 12th Street
Oakland, CA 94607
If you have any additional questions, please contact: Jake Sloan at (510) 385-1242 or email [email protected] or
Emilija Besic at (510) 385-1261 or email [email protected]
REQUEST FOR BIDS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 31
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
Owner Contractor Address Parcel # Construction ValueOronzi Marilyn M /Tr/ DE MELLO ROOFING 141 S Ridgewood Rd Kentfield 075-031-09 (53) Tear Off & R $16,700 Dixon Alexander T /Tr/ & OWNER 408 Oak Crest Rd San Anselmo 177-140-02 (24-0/1), (23)(13 $52,700 Spoerry Juerg B & MR ROOFING INC 124 Upland Rd Kentfield 075-012-16 (53) Reroof $39,820 Skywalker Properties Ltd ALTERNATIVE ROOFING SOLUT 5858 Lucas Valley Rd Nicasio 121-130-22 (53) Reroof Inn $36,140 Development Solutions Pc BEACH STREET BUILDERS 241 Trinidad Dr Tiburon 038-460-13 (11) Ret Wall $20,000 Kennedy Oak Knoll Llc OWNER/BUILDER 67 Oak Knoll Dr San Anselmo 176-260-60 (11) Retaining Wa $50,000 Hollis Robert L /Tr/ & ABLE ROOFING 822 Greenberry Ln San Rafael 164-013-25 (53) Reroof $12,500 Hansbury Gioia L /Tr/ Eta ABRIL ROOFING CO 75 El Capitan Dr San Rafael 164-403-04 (53) Roof Overlay $17,500 Martin Dikran J Tr & DE MELLO ROOFING 110 Terrace Ave Kentfield 071-151-06 (53) Reroof E-Ins $11,895 Point Reyes Livery Stable OWNER/BUILDER 65 Third St Point Reyes Statio 119-224-09 (56,93) Repair Sh $15,000 Goldbeck John C CALIFORNIA ROOF SAVERS 5725 Chileno Valley Rd Petalum 106-130-11 (53) Reroof $17,000 Banakus Daniel J & CLOUGH, JAMES S ENTERPRIS 1 Palomino Cir Novato 146-292-09 (13) Replace Exis $75,000 Hale Steve R MIRANDA’S ROOFING 20 Ichabod Ct San Anselmo 176-182-08 (53) Reroof $18,000 Denn Cindy M AMERICAN SOLAR CORPORATIO 26 Madrone Ave Inverness 112-171-11 (60) Rf Mtd P V S $12,500 Mirchandani Indru H /Tr/ SUN FIRST CONST 21 Fawn Ct San Anselmo 177-081-10 ( 60) Rf Mtd P V $16,700 Bolinas Fire Protection D VINCULUMS SERVICES INC 100 Mesa Rd Bolinas 193-020-57 (12,50) Repl 1 Ba $49,000 Zatto Michael D /Tr/ & Et KRUETZFELDT CONSTRUCTION 70 Dolphin Isle Novato 157-560-16 (60) Rf Mtd P V S $16,000 Maffei James J /Tr/ & Eta KRUETZFELDT CONSTRUCTION 1037 Bel Marin Keys Blvd Novat 157-301-03 (60) Rf Mtd P V S $14,000 Rire Workwear Llc LEON CONSTRUCTION 396 Pinehill Rd #30 Mill Valle 050-151-33 (23) Remodel Bath $18,000 Burton Lindsay WEDGE ROOFING, INC 728 Bay Rd Mill Valley 049-134-14 (53) Re-Roof $12,650 Johnston John E & CAPSTONE ROOFING 425 Wellesley Ave Mill Valley 050-081-36 (53) Re-Roof $15,000 Strucel Maria E Tr CAPSTONE ROOFING 625 Vendola Dr San Rafael 180-061-06 (53) Re-Roof $11,300 Grossman Daniel J /Tr/ ALTERNATIVE ROOFING SOLUT 515 Pineo Ave Mill Valley 049-101-64 (53) Re-Roof $11,295 Peltz Family Trust Etal CREATIVE BUILDERS 110 Fawn Dr San Anselmo 177-052-07 (12) (22) (59) In $100,000 Green Graham /Tr/ & Eta NARROWBACK CONSTRUCTION C 28 Crescente Ave Bolinas 193-092-21 (21) Addn, Expnd $544,200 Walker Stanley L OWNER 345 Oceana Dr Dillon Beach 100-281-09 (21)(23)(12) Remo $64,550 Abecassis Ricardo F & SOLARCITY CORP 440 Goodhill Rd Kentfield 074-151-07 (60) Install Phot $39,200
COUNTY OF MARIN PERMITS ISSUED
COUNTY OF MARIN PERMITS RECEIVEDAddress Owner Work Value75 Rock Rd Kentfield Goshay Catherine /Tr/ (62) Demolish House $50,0001502 Old Rancheria Rd Nicasio Brody Jeffrey & Mc Cormick Susan Rev (21) (23) Addition; Reconfigur $160,000125 Nadina Way Greenbrae Streeter Hector & Clara /Tr/ & Etal (23) Convert (E) Storage Space $18,0005 Friars Ln Mill Valley Rangachary Sudarshana & Tyers Paul (21) (23) Convert Attic Space $20,0001 Fay Dr Kentfield G & J 888 Inc (13,21,23) Addition, Remodel, $380,508110 Fawn Dr San Anselmo Peltz Family Trust Etal (60) Rf Mtd P V Sys 7.85 K W $33,0003125 Sir Francis Drake Blvd Fairfax Girl Scout Council (13,31,33) Add Deck, Remdl A D $42,50027 Eagle Rock Rd Mill Valley Randolph Katherine V (23)(13)Rmdl Kit And Add New D $50,000229 Cleveland Ave Mill Valley Hicks Jonathan & Weissensee Courtney (12) (13) (20) Demo (E) Home D $600,00020 Blue Ridge Rd Kentfield Wilson Peter H /Tr/ & Etal (11) Slope Stabilization/Slide $40,000139 Belvedere Dr Mill Valley 139 Belvedere Drive Llc (21) (22) (12) Whole House Rem $378,000120 Vista Grande Greenbrae Shamsavari Shaheen J & (11) Retaining Wall $30,00026 Madrone Ave Inverness Denn Cindy M (60) Rf Mtd P V Sys 4.48 K W - $12,50021 Fawn Ct San Anselmo Mirchandani Indru H /Tr/ & (60) Rf Mtd P V Sys 4.25 K W $16,70070 Dolphin Isle Novato Zatto Michael D /Tr/ & Etal (60) Rf Mtd P V Sys 4.41 K W - $16,0001037 Bel Marin Keys Blvd Novato Maffei James J /Tr/ & Etal (60) Rf Mtd P V Sys 3.43 K W - $14,000
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 32
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
CITY & TOWN PERMITS ISSUED
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Corte Madera 10/21 Walters Jason & Helene
Stader Construction 5 Ash Ave Remodel Kitchen & Bathroom
$65,000
Corte Madera 10/22 Tarantino John T & Camille A
Solarcity Corp 56 Staghound Psge Solar $17,000
Corte Madera 10/22 Paoletti Eliana Details Of Sonoma 6 Mariner Green Dr Replace Deck In-Kind
$18,000
Corte Madera 10/23 Marinoni James B One Hour Heating & A/C
29 Mariner Green Dr Replace Funace And Duct
$12,260
Corte Madera 10/24 Terrill Valerie & Craig Jaffa
Tamco Construction Inc.
101 Madera Del Presidio Dr
Remodel Kitchen & 2 Bathrooms
$100,000
Novato 10/21 Theodore M Brooks 2008 Revocab
D & R Construction 290 Marin Oaks Dr Minor Construction $15,000
Novato 10/21 Carmen Kelly S G K Home Solutions Inc
45 Eagle Gap Ct Window $17,500
Novato 10/21 Reyes Ralph J & Solarcraft Services, Inc.
34 Greenham Ct Solar $20,381
Novato 10/21 Mendoza Genaro Lic.Contract.Hired By Owner
195 Los Robles Rd Construction $25,000
Novato 10/21 Bonardi Paul /Tr/ & Alan R Taylor General Contract
24 Leslie Ct Construction $98,000
Novato 10/22 Sharpley Suzan B California Energy Corp.
1605 Center Rd Hvac $10,395
Novato 10/22 Wise Thomas Louis & Janet Lynn
T L W Electric-Tom Wise
5 Paradise Ct Solar $25,000
Novato 10/22 Powning George G & Solarcraft Services, Inc.
30 San Ramon Way Solar $29,450
Novato 10/22 Bill Kiriakis Rempe Construction (Steve Remp
14 Creekview Ct Construction $62,325
Novato 10/22 Hamilton Marin Llc Turner Construction Co.
9 Hamilton Landing Construction $450,000
Novato 10/23 Malone Joan V /Tr/ Save Energy Company (Maap Dba)
8 Kaden Ct Windows 9 Or More Ol
$12,803
Novato 10/23 Hall Judy A & Solarcraft Services, Inc.
1471 Pastel Ln Solar $35,756
Novato 10/24 Carlson Brian C /Tr/ & Mark Scott Construction Inc
24 Wentworth Ln Construction $11,533
Novato 10/24 Jennifer Barden I M H General Construction
1158 Mcclelland Dr Window $14,000
Novato 10/24 Louraine Joel & Maureen
Re-Bath By Schicker 43 Pizarro Ave Minor Construction $17,010
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 33
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Novato 10/24 Figone Christopher & Aaero Htg. & Sheet Metal Inc.
140 Montura Way Furnace Ac Hvac Ol
$18,779
Novato 10/24 Brandes James L /Tr/ &
A1 Solar Power Inc 93 Laurelwood Dr Solar $42,798
Novato 10/24 Novato Development Llc
Tim Grogan Builders Inc.
5 Zandra Pl New Sfd $400,000
Novato 10/24 Novato Development Llc
Tim Grogan Builders Inc.
8 Zandra Pl New Sfd $400,000
Novato 10/28 Michael Phillips Owner-Builder 1424 Donna St Minor Construction $10,000 Novato 10/28 Webb Gloria A /Tr/ Giovacchini
Construction18 Columbine Ln Construction $10,603
Novato 10/28 Mc Murdo John Home Depot At Home Services
140 San Marin Dr Window $13,746
Novato 10/28 Mukai Craig D & Sally Contreras Roofing 5 Caddy Ct Reroof $16,000 Novato 10/28 Collum Paul Owner-Builder 7 Adams Ct Construction $100,000 Novato 10/28 Bayview Ignacio Llc Novo Construction,
Inc105 Digital Dr Tenant
Improvement $300,000
Novato 10/29 Ken Goodrich Ken Cooper Roofing 616 Andale Ave Reroof $17,279 Novato 10/29 Saville Randall Sears Home
Improvement446 Estado Way Minor Construction $23,430
Novato 10/29 Ghilotti Properties Thermal Roof Systems
20 Pimentel Ct C Reroof $56,993
Novato 10/30 Thaeler Charles S Iii Solarcraft Services, Inc.
2126 Feliz Dr Solar $22,234
Novato 10/30 Glikman Karen D Tr Solarcraft Services, Inc.
7 Nassau Ct Solar $36,682
Novato 10/31 Eliaser Family Trust Etal
Moran Roofing And Inspection C
26 Robinhood Dr Reroof $13,360
Novato 10/31 Slaughter Thomas M &
Wedge Roofing, Inc. 70 Summers Ave Reroof $19,730
Novato 10/31 Dougherty Leonard A Iii &
Form To Finish Construction
105 Bryan Dr Construction $20,000
Novato 10/31 San Marin Valley Hoa Community Reconstruction Solut
46 Aronia Ln Minor Construction $21,350
San Rafael 10/22 Able Roofing Company
De Alencar Mauro Q 144 Robinhood Dr Alter-Sfd $10,850
San Rafael 10/22 Clark John C & Schalich Brothers Const
4 Snowberry Ct Alter-Sfd $17,500
San Rafael 10/22 Alioto Judy Revoc Trust
Francisco Santoyo 43 Mahogany Dr Alter-Sfd $21,000
San Rafael 10/23 Thrasher Thomas K & Thrasher Thomas K & 534 Tarragon Dr Alter-Sfd $15,000 San Rafael 10/23 Finley Harold J Yorkshire Roofing Of
No Ca123 Belle Ave Alter-Sfd $23,842
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 34
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
San Rafael 10/23 Azur Vineyards Llc Bbc Construction Inc 4300 Redwood Hwy Ste 100
Alter-Commercial $25,000
San Rafael 10/24 Sergio Lopez Roofing 155
Bauman Angela M 3 Corrillo Dr Alter-Sfd $10,250
San Rafael 10/24 Martin Sheila R 24 Cabrillo Ct Alter-Sfd $15,000 San Rafael 10/24 Wilkinson Pavil Wilkinson Pavil 72 Clayton St Alter-Sfd $15,000 San Rafael 10/24 Gilleran Amy & O’Connell Landscape 3 Rollingwood Dr Alter-Sfd $28,000 San Rafael 10/24 Pasquan Stephen L
& E1735 Lincoln Ave New Sfd $230,000
San Rafael 10/24 Zamlich Steve G & Zamlich Steve G & 46 Scenic Ave New Sfd $620,710 San Rafael 10/28 Quesnoy Louette 1150 Mission Ave Alter-Sfd $11,000 San Rafael 10/28 Elevated Design Llc 118 Tamal Vista Dr Alter-Sfd $77,000 San Rafael 10/29 Kirk 1972 Family Trust 67 Partridge Dr Alter-Sfd $20,000 Tiburon 10/21 Steve Akram Wall Construction 45 Meadowhill Drive New And Replace
Concrete Driveway And Endtry Stair Sidewalk
$20,000
Tiburon 10/21 Om & Laura Rawal Redican Homes 120 Hacienda Drive Sunroom Repair And Remodel
$60,000
Tiburon 10/21 David Holden Owner-Builder 231 Blackfield Drive Expand Kitchen On First Floor And Master Bath
$98,725
Tiburon 10/22 Shannon Stolte The Home Doctors, Inc.
330 Karen Way Install Skylights $11,950
Tiburon 10/23 Carl Martin Able Roofing Company
303 Trestle Glen Blvd
Reroof $13,345
Tiburon 10/23 Troy And Kimberly Pewitt
Ahlboarn Fence & Steel Inc
3 Burrell Ct Replace Fence And Replace Front Patio
$25,000
Tiburon 10/23 Linda Emberson M2 Design And Construction
686 Hawthorne Drive
Remodel Kitchen $100,000
Tiburon 10/24 Richard & Christy Mcelreath
Owner-Builder 515 Hilary Drive Door And Window Replacement
$15,000
Tiburon 10/24 Phillip And Young Allan
Romco Construction 1 Greenwood Ct Increasing Family Room
$325,000
Tiburon 10/28 Chase Bank Mesa Energy Systems, Inc.
1535 Tiburon Blvd Replace A/C $105,640
Tiburon 10/29 John Stolte Cascade Roofing Company
330 Karen Way Reroof $11,900
Tiburon 10/29 West Shorte Heights Llc
Carefree Toland Pools Inc
23 Circle Drive New Pool $20,000
Tiburon 10/29 Westmore Properties Jsco, Inc. 19 Sutter Court Excavate Next To Foundations. Install New French Drains And Membrane
$20,000
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 35
PERMITS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date
Owner Contractor Site Address Type Valuation
Tiburon 10/29 Robert Fox Solarcraft Services, Inc.
26 Sutter Court Solar $20,488
Tiburon 10/29 Steve Lamar Apache Pools, Inc 3 Santa Ana Court Add Swimming Pool
$42,000
Tiburon 10/30 Ritch Viola Owner-Builder 116 Howard Drive Remodel Hall Bathroom
$10,000
Tiburon 10/30 Ken Dara Creative Roofing Of Northern California
23 Sutter Court Reroof $11,406
Tiburon 10/30 Kevin & Paula Pitcher Bon Terra Landscapes 140 Rancho Drive Solar $22,000 Tiburon 10/31 James Dignan Luminalt Energy
Corporation80 Reedland Woods Way
Solar $67,535
Tiburon 10/31 John Cello Pennypacker/Drake Home Building Inc
54 Lower North Terrace
Remodel Baths And Change Floors In Kitchen And Dining Room
$88,000
Tiburon 10/31 Ginny & Anselm Leung
J Volin Warner Construction
10 Baccharis Place Replace Cedar Siding
$100,000
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 36
TAX LIENS & COMPLETIONS
www.marinba.org ◆ [email protected]
COMPLETIONSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
11/1 COUNTY OF MARIN (I) (none) COMPLETION 2013-006811511/1 LAUREL FOREST DEVELOPMENT
LLC (I)(none) COMPLETION 2013-0068076
11/1 MARIN COUNTY (I) (none) COMPLETION 2013-006811511/1 OAK GROVE CONSTRUCTION (I) (none) COMPLETION 2013-0068115
LIENSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
10/29 AHERN RENTALS INC (E) DONNELLY CHRISTOPHER JAMES (O)
LIEN 2013-0067414
10/29 AHERN RENTALS INC (E) DONNELLY LINSLY MARGUERITE (O)
LIEN 2013-0067414
10/29 NEW MARBLE CO INC (E) SIAS SPENCER (O) LIEN 2013-006757110/29 NEW MARBLE CO INC (E) SIAS STACY (O) LIEN 2013-006757110/30 ECONOMY TRUCKING SERVICES
INC (E)HAWKINS DEVELOPMENT COR-PORATION (O)
LIEN 2013-0067625
10/31 SEASCAPE VILLAGE HOMEOWN-ERS ASSOCIATION (E)
VILORIA EMMANUEL (O) LIEN 2013-0067853
10/31 SEASCAPE VILLAGE HOMEOWN-ERS ASSOCIATION (E)
VILORIA MARIA (O) LIEN 2013-0067853
11/1 POOLE ROB (E) NASRA JOHN (O) LIEN 2013-006813111/1 REDWOOD ENGINEERING (E) NASRA JOHN (O) LIEN 2013-006813111/2 CADE CORPORATION (E) SAVOY CORP (O) LIEN 2013-006828311/2 MARY E TREMBLAY 1997 REVO-
CABLE TRUST (O)VILLAGE WEST HOME OWNERS ASSOCIATION INC (E)
LIEN 2013-0068379
11/2 SCHNEIDER BARRY (E) LAGERLING CHRISTIAN (O) LIEN 2013-006835711/2 VILLAGE WEST HOME OWNERS
ASSOCIATION INC (E)MARY E TREMBLAY 1997 REVO-CABLE TRUST (O)
LIEN 2013-0068379
11/2 VILLAGE WEST HOME OWNERS ASSOCIATION INC (E)
TREMBLAY MARY E /TR/ (O) LIEN 2013-0068379
RELEASE OF LIENRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
10/29 HAMAMI IBRAHIM MAHMOUD (E) STATE BOARD OF EQUALIZA-TION (O)
RELEASE OF LIEN 2013-0067561
10/29 LAVINE BRUCE (E) CONSOLIDATED ELECTRICAL DISTRIBUTORS INC (O)
RELEASE OF LIEN 2013-0067568
10/29 LAVINE BRUCE (E) ROYAL WHOLESALE ELECTRIC (O)
RELEASE OF LIEN 2013-0067568
10/29 MARINO CHRIS (E) JFK & ASSOCIATES MARBLE GRANITE (O)
RELEASE OF LIEN 2013-0067584
10/29 MARINO CHRIS (E) KREMLACEK JOSEF (O) RELEASE OF LIEN 2013-0067584
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 37
TAX LIENS & COMPLETIONS
www.marinba.org ◆ [email protected]
RELEASE OF LIENS (Continued)Recording Date
Grantors/Grantees Grantees/Grantors Title Document Number
10/29 MARINO SYLVIA (E) JFK & ASSOCIATES MARBLE GRANITE (O)
RELEASE OF LIEN 2013-0067584
10/29 MARINO SYLVIA (E) KREMLACEK JOSEF (O) RELEASE OF LIEN 2013-006758410/29 MEYER THOMAS G (E) SONOMA COUNTY DEPARTMENT
OF CHILD SUPPORT SERVICES (O)
RELEASE OF LIEN 2013-0067522
10/29 ROSENBAUM ARIEH (E) JFK & ASSOCIATES MARBLE GRANITE (O)
RELEASE OF LIEN 2013-0067583
10/29 ROSENBAUM ARIEH (E) KREMLACEK JOSEF (O) RELEASE OF LIEN 2013-006758310/29 SHANDS BARBARA (E) JFK & ASSOCIATES MARBLE
GRANITE (O)RELEASE OF LIEN 2013-0067583
10/29 SHANDS BARBARA (E) KREMLACEK JOSEF (O) RELEASE OF LIEN 2013-006758310/29 STAR RESTAURANT (E) STATE BOARD OF EQUALIZA-
TION (O)RELEASE OF LIEN 2013-0067561
10/30 SHANNON CHRISTINE (E) MARIN COUNTY DEPARTMENT OF CHILD SUPPORT SERVICES (O)
RELEASE OF LIEN 2013-0067759
11/2 EDWARDS JUANITA J (E) MARIN COUNTY DEPARTMENT OF CHILD SUPPORT SERVICES (O)
RELEASE OF LIEN 2013-0068478
11/2 SWEENEY MARILYN A (E) MATTHEW LAWRENCE CON-STRUCTION INC (O)
RELEASE OF LIEN 2013-0068471
TAX LIENSRecording Date
Grantors/Grantees Grantees/Grantors Title Document Number
10/29 FRANCHISE TAX BOARD (E) ALLEN CHRISTINA C (O) TAX LIEN 2013-006751510/29 FRANCHISE TAX BOARD (E) AZARDOUST CYRUS (O) TAX LIEN 2013-006751610/29 FRANCHISE TAX BOARD (E) COLE AMANDA H (O) TAX LIEN 2013-006751710/29 FRANCHISE TAX BOARD (E) JORDAN ERIC P (O) TAX LIEN 2013-006751810/29 FRANCHISE TAX BOARD (E) HARRIS CINDY E (O) TAX LIEN 2013-006751910/29 FRANCHISE TAX BOARD (E) FAIRBANKS MARK (O) TAX LIEN 2013-006752010/29 FRANCHISE TAX BOARD (E) VALLEJO GERARDO (O) TAX LIEN 2013-006752110/29 INTERNAL REVENUE SERVICE (E) MADERA ADOBE INC (O) TAX LIEN 2013-006747810/29 INTERNAL REVENUE SERVICE (E) SAMOUN DAISY S (O) TAX LIEN 2013-006747910/29 INTERNAL REVENUE SERVICE (E) BIERER JOEL D (O) TAX LIEN 2013-006748010/29 INTERNAL REVENUE SERVICE (E) BIERER KAREN (O) TAX LIEN 2013-006748010/29 INTERNAL REVENUE SERVICE (E) OLSEN JAMES L (O) TAX LIEN 2013-006748110/29 INTERNAL REVENUE SERVICE (E) OLSEN MARY M (O) TAX LIEN 2013-006748110/29 INTERNAL REVENUE SERVICE (E) IFE LEASING INC (O) TAX LIEN 2013-006748210/29 INTERNAL REVENUE SERVICE (E) INTERNATIONAL FIRE EQUIP-
MENT CO (O)TAX LIEN 2013-0067482
10/29 INTERNAL REVENUE SERVICE (E) TABUSSI ELIZABETH R (O) TAX LIEN 2013-0067483
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 38
TAX LIENS & COMPLETIONS
www.marinba.org ◆ [email protected]
TAX LIENS (continued)Recording Date
Grantors/Grantees Grantees/Grantors Title Document Number
10/29 INTERNAL REVENUE SERVICE (E) BATCHELDER LISA M (O) TAX LIEN 2013-006748410/29 INTERNAL REVENUE SERVICE (E) BATCHELDER THOMAS G (O) TAX LIEN 2013-006748410/29 INTERNAL REVENUE SERVICE (E) DUDITCH LESLIE K (O) TAX LIEN 2013-006748510/29 INTERNAL REVENUE SERVICE (E) DUDITCH STEVEN C (O) TAX LIEN 2013-006748510/29 INTERNAL REVENUE SERVICE (E) AUGUSTO CHRISTOPHER J (O) TAX LIEN 2013-006748610/29 INTERNAL REVENUE SERVICE (E) KAVRELL HARMON D (O) TAX LIEN 2013-006748710/31 FRANCHISE TAX BOARD (E) GLOBAL DEVELOPMENT PART-
NERS LLC (O)TAX LIEN 2013-0067928
10/31 FRANCHISE TAX BOARD (E) CHINABLUE INC (O) TAX LIEN 2013-006792910/31 FRANCHISE TAX BOARD (E) BRIDGE THE GAP (O) TAX LIEN 2013-006793010/31 FRANCHISE TAX BOARD (E) MARSHALL PATRICK CHARLES (O) TAX LIEN 2013-006794010/31 FRANCHISE TAX BOARD (E) TRUEMAN ANA (O) TAX LIEN 2013-006794110/31 FRANCHISE TAX BOARD (E) BRAMSWIG CHRISTIAN D (O) TAX LIEN 2013-006794210/31 FRANCHISE TAX BOARD (E) MEREDITH JENNIFER D (O) TAX LIEN 2013-006794510/31 FRANCHISE TAX BOARD (E) CIAFREI TERRY (O) TAX LIEN 2013-006794610/31 FRANCHISE TAX BOARD (E) ROBERT HORKY (O) TAX LIEN 2013-006794710/31 FRANCHISE TAX BOARD (E) RICHTER MARY J (O) TAX LIEN 2013-006794810/31 FRANCHISE TAX BOARD (E) JUDGE GREGORY A (O) TAX LIEN 2013-006794910/31 FRANCHISE TAX BOARD (E) OLIVA RICHARD G (O) TAX LIEN 2013-006795011/2 FRANCHISE TAX BOARD (E) MOLNAR RONALD L (O) TAX LIEN 2013-006842511/2 FRANCHISE TAX BOARD (E) MAASARANI TAREK (O) TAX LIEN 2013-006842611/2 FRANCHISE TAX BOARD (E) CAHN PAUL J (O) TAX LIEN 2013-006842711/2 FRANCHISE TAX BOARD (E) AHERN LORRAINE M (O) TAX LIEN 2013-006842811/2 FRANCHISE TAX BOARD (E) WALTER VICTORIA M (O) TAX LIEN 2013-006842911/2 FRANCHISE TAX BOARD (E) HEAGY CARA A (O) TAX LIEN 2013-006843011/2 FRANCHISE TAX BOARD (E) MAESTRI JOHN R JR (O) TAX LIEN 2013-006843111/2 FRANCHISE TAX BOARD (E) VELASCO JAMES (O) TAX LIEN 2013-006843211/2 FRANCHISE TAX BOARD (E) SHERMER ROBERT A (O) TAX LIEN 2013-006843311/2 FRANCHISE TAX BOARD (E) BARRETT TRACY L (O) TAX LIEN 2013-006843411/2 FRANCHISE TAX BOARD (E) WHITNEY SCOTT M (O) TAX LIEN 2013-006843511/2 FRANCHISE TAX BOARD (E) MOORE GREGORY T (O) TAX LIEN 2013-006843611/2 FRANCHISE TAX BOARD (E) TERRITO JAMES D (O) TAX LIEN 2013-006843711/2 FRANCHISE TAX BOARD (E) ERDOGAN AHMET (O) TAX LIEN 2013-006843811/2 FRANCHISE TAX BOARD (E) TITOV ANTON (O) TAX LIEN 2013-006843911/2 FRANCHISE TAX BOARD (E) ORTIZ CATHERINE A (O) TAX LIEN 2013-006844011/2 INTERNAL REVENUE SERVICE (E) SAMOUN DAISY S (O) TAX LIEN 2013-006850011/2 INTERNAL REVENUE SERVICE (E) LE GALL LAURENT (O) TAX LIEN 2013-006850111/2 INTERNAL REVENUE SERVICE (E) COAST CAFE (O) TAX LIEN 2013-006850211/2 INTERNAL REVENUE SERVICE (E) ROSANNE Y DAVID INC (O) TAX LIEN 2013-006850211/2 INTERNAL REVENUE SERVICE (E) ADLER HOWARD (O) TAX LIEN 2013-006850311/2 INTERNAL REVENUE SERVICE (E) SALVAGE ANDRE (O) TAX LIEN 2013-0068504
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 39
Bid Date Bid Time Project Name City BIN # Plan Issuer11/1/2013 5:00 PM Marin County ONLINE
Marin Housing Authority
Vacant Unit Interior Painting Services Blanket Contract
11/1/2013 2:00 PM Carmichael ONLINE
San Juan Unified School District
RFQ-Architectural/Engineering Services
11/1/2013 3:00 PM Visalia Online Visalia, City OfEnergy Effiency Measures (EEM) Retrofit Project
11/1/2013 12:00 PM San Jose ONLINE
RCH Construction, IncWaterworks Aquatics (No GC Openings)
11/1/2013 2:00 PM Visalia Online Visalia, City OfEngineering Design Services for Fairview Sanitary Sewer Project Phases 2-4
11/1/2013 10:00 AM Mather ONLINE
Building 650 Elevator Cab Replacement
11/1/2013 3:00 PM Santa Clara Online Santa Clara County Housing Authority
Remove and Replace Existing Concrete Parking Area
11/1/2013 3:00 PM Santa Clara Online Santa Clara County Housing Authority
Exterior Painting Project For John Burns Gardens and Life Service Alternatives (LSA)
11/1/2013 2:00 PM Newark ONLINE
Newark Unified School Dist
Asbestos Control Program Environmental and/or Industrial Hygiene Consultants
11/1/2013 3:00 PM Campbell Online Santa Clara County Housing Authority
Exterior Painting and Recoating Waterproof Decks Project
11/1/2013 3:00 PM San Jose Online Santa Clara County Housing Authority
Exterior Painting Project
11/1/2013 10:00 AM Fremon/Newark ONLINE
Ohlone Community College District
Swing Space Temporary Portables
11/1/2013 10:00 AM Mather ONLINE
Replace Roofing Buildung 720
11/2/2013 1:00 PM Crockett ONLINE
Crockett Community Services District
#13-XX.B1 Sewer Main Replacement
11/4/2013 2:00 PM Windsor ONLINE
Midstate ConstructionExchange Bank
11/4/2013 12:00 PM San Francisco ONLINE
Turner ConstructionM. Moser Office Renovation
11/4/2013 3:00 PM Sonora ONLINE
MACT Health Board, Inc. Boulder Plaza Medical Clinic Remodel
11/4/2013 2:00 PM Oakland ONLINE
Port Of OaklandRemoval & Disposal of Hazardous Waste, Universal Waste & Other Contaminated Materials
11/4/2013 12:00 PM Glendale ONLINE
Tri-North BuildersCoach Store Tenant Improvements
11/4/2013 4:00 PM Kings County ONLINE
Kings, County OfBridge Preventive Maintenance Program
11/4/2013 9:00 AM Rodeo ONLINE
Rodeo Sanitary DistrictRodeo Creek Bridge Force Main Realignment Project
11/4/2013 2:00 PM Fremont ONLINE
Ohlone Community College District
Ohlone College Lot Tree Removal Lots G, H & K
11/4/2013 3:00 PM Tulare ONLINE
Stout Building Contractors
Dollar General Store-Tulare
11/4/2013 10:00 AM Turlock ONLINE
Turlock, City ofColumbia Park Restrooms
11/4/2013 2:00 PM Berkeley ONLINE
University of California, Berkeley
East Campus Utility Improvements
11/4/2013 1:30 PM San Jose ONLINE
Sugimura Finney Architects
Educare of CA at Silicon Valley
11/5/2013 2:00 PM Oakland 062C/E301B
San Francisco Bay Area Rapid Transit District
Coliseum Station Security Fence
11/5/2013 2:00 PM San Francisco B130/029C
San Francisco County Transportation Authority
Interstate 80 Yerba Buena Island West Bound Ramps Improvement Project
11/5/2013 2:00 PM San Jose E315B
Santa Clara, County OfInstallation of New Curb & Gutter on Green Acres Court
www.marinba.org ◆ [email protected]
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 40
Bid Date Bid Time Project Name City BIN # Plan Issuer11/5/2013 4:00 PM San Francisco ONLINE
San Francisco, City & County of
Tenderloin Area Cleanup Program
11/5/2013 4:00 PM Los Gatos ONLINE
G.M. Northrup CorpSelect Medical -Los Gatos
11/5/2013 2:00 PM Sacramento ONLINE
CMC Building Contracting Project Mgmt
Cathay Bank - Tenant Improvements
11/5/2013 2:00 PM Daly City ONLINE
Daly City, City OfHillside Park Restoration
11/5/2013 2:00 PM Berkeley ONLINE
Berkeley, UCGolden Bear HVAC Upgrade
11/5/2013 2:00 PM Mountain View ONLINE
Mountain View, city ofRFQ - Shoreline Athletic Fields
11/5/2013 2:00 PM Fremont ONLINE
Ohlone Community College District
Ohlone College Parking Lots G, H & K Infill Project
11/5/2013 2:00 PM Union City ONLINE
Union City, city of2013-13 Sidewalk Repairs Project
11/5/2013 2:00 PM El Cerrito ONLINE
West Contra Costa Unified School District
El Cerrito High School Stadium
11/5/2013 2:00 PM Auburn ONLINE
Placer County Water Agency
Heritage Center Driveway Improvements
11/5/2013 3:00 PM Fresno ONLINE
Fresno, City ofHerndon Multi-Purpose Trail Between Valentine & Marks Avenues
11/5/2013 3:00 PM Palo Alto Online Palo Alto, City ofPalo Alto Bicycle Boulevards
11/5/2013 4:00 PM San Francisco ONLINE
San Francisco, City & County of
Architectural & Engineering Design Services for the Balboa Park Renovation Project
11/5/2013 2:00 PM Elk Grove Online Elk Grove, City ofElk Grove-Florin Road and East Stockton Boulevard Intersection Realignment Project
11/5/2013 1:00 PM Merced ONLINE
University of California, Merced
RFQ-Central Plant/Telecommunications Reliability Upgrade
11/5/2013 2:00 PM Novato ONLINE
Novato, City OfNovato Arts Center - Interior Renovations
11/5/2013 2:00 PM Union City ONLINE
Alameda County Water District
Appian Tank Seismic Upgrade Project
11/5/2013 1:30 PM Pleasanton ONLINE
Department of Motor Vehicles
Parking Lot Seal & Stripe Services for Pleasanton DMV Field Office
11/5/2013 2:00 PM Santa Rosa ONLINE
Santa Rosa, City ofVentura Avenue Improvements
11/5/2013 3:00 PM Santa Cruz ONLINE
Santa Cruz, UCTelecommunications Infractructure Upgrades Phase A Telecommunication Rooms Improvements
11/5/2013 4:00 PM Palo Alto ONLINE
McCarthy Building Co., Inc.
VA Palo Alto-Loop Road & Site Utilities, Radiology Consolidation
11/5/2013 2:00 PM Burlingame ONLINE
Burlingame, City ofWashington Park Grandstand Painting Project
11/5/2013 2:00 PM Oakland* T007/020C
460 Grand Apartments
11/6/2013 1:30 PM Alameda E304B
East Bay Municipal Utility District
Versailles Interceptor Rehabilitation
11/6/2013 1:30 PM Oakland E305B
East Bay Municipal Utility District
West End Property 12kV Electrical Service Connection
11/6/2013 2:00 PM Tracy ONLINE
Tracy, City ofFire Station 91 Quarters Modification
11/6/2013 3:00 PM San Francisco ONLINE
University of California, San Francisco
Health Science Instruction & Research (HSIR) Fire Smoke Damper Repair
11/6/2013 2:00 PM Manteca ONLINE
Manteca, City OfInfluent Pump Station Rehabilitation Project
11/6/2013 3:00 PM Modesto ONLINE
Timothy P. Huff & Associates, Inc
Covered Walkway Extension at Mary Lou Dieterich Elem School
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 41
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer11/6/2013 2:00 PM South Lake Tahoe ONLINE
South Lake Tahoe - PW
Recreation Center Gym Bituminous Roof Replacement
11/6/2013 2:00 PM Fremont ONLINE
Ohlone Community College District
Special Testing & Inspection Services at Ohlone College South Parking Structure
11/6/2013 2:00 PM West Sacramento ONLINE
West Sacramento, City of
West Sacramento Fire Department Station 44 Bathroom Upgrade
11/6/2013 3:00 PM Sunnyvale ONLINE
Sunnyvale, City ofDowntown Parking Lots - Evelyn Avenue and Francis Street
11/6/2013 2:00 PM Santa Clara ONLINE
SD Deacon General Contractors
Target Store T-2830
11/6/2013 3:00 PM San Francisco ONLINE
University of California, San Francisco
HSW 12 Immunology Remodel
11/6/2013 2:00 PM Oakland ONLINE
Port of OaklandMaintenance & Landscaping at Middle Harbor Shoreline Park
11/6/2013 2:00 PM San Francisco Online The Office of Community Investment and Infrastructure
Building 813 Stabilization
11/6/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
ESER 1 Fire Stations 2, 18 & 31 Exterior Envelope
11/6/2013 2:00 PM Sacramento ONLINE
Sacramento, city ofSacramento City College Pedestrian/Bicycle Bridge (Phase 3)
11/6/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
Broadway Tunnel Ventilation Upgrade
11/6/2013 2:00 PM Soquel ONLINE
Soquel Creek Water District
O'Neill Ranch Well & Water Treatment Plant
11/6/2013 4:00 PM Menlo Park ONLINE
Menlo Park, City ofEl Camino Real Lane Reconfiguration & Ravenswood Avenue Right Turn Lane Study
11/6/2013 2:00 PM Sacramento ONLINE
Seward L. Schreder Construction, Inc.
Hiram W. Johnson School Gymnasium Modernization (No GC Openings)
11/6/2013 2:30 PM San Rafael T006B
Marin, county of20 North San Pedro Building Renovation - REBID
11/7/2013 2:00 PM Sunol* CD San Francisco, City & County of
Town of Sunol Fire Suppression System
11/7/2013 2:00 PM San Francisco* N/A San Francisco, City & County of
AWSS - New Cistern C - This project will NOT be scanned
11/7/2013 3:00 PM San Luis Obispo ONLINE
San Luis Obispo, County Of
Sheriff-COC-Women's Jail Expansion
11/7/2013 2:00 PM Cupertino ONLINE
Cupertino Union School District
Cupertino Middle School Multipurpose Building
11/7/2013 2:00 PM Pittsburg ONLINE
Midstate ConstructionStoneman Village Alteration (No GC Openings)
11/7/2013 1:00 PM Palo Alto ONLINE
Palo Alto Unified School District
Henry M. Gunn High School Miranda Avenue Drop-off
11/7/2013 2:00 PM San Francisco ONLINE
San Francisco International Airport
As-Needed Architectural & Engineering Support Services at San Francisco Airport
11/7/2013 3:00 PM Placerville ONLINE
Los Rios Community College District
FLC El Dorado Center Student Services Expansion
11/7/2013 2:00 PM Sacramento ONLINE
Sacramento County Municipal Services Agency
Franklin Boulevard Streetscape Improvements
11/7/2013 2:00 PM Sacramento ONLINE
Los Rios Community College District
CRC Stadium Landscaping
11/7/2013 2:00 PM Alameda ONLINE
Alameda, City ofMarina Village Landscape & Lighting District - Landscape Maintenance
11/7/2013 1:00 PM Fresno ONLINE
First 5 Fresno CountyLighthouse For Children, Phase 1 - REBID
11/7/2013 2:00 PM Sacramento ONLINE
Department of General Services
Spandrel Panel Replacement
11/7/2013 5:00 PM Lathrop ONLINE
Lathrop, city ofCLSP Low Flow Sewer and Storm System Improvements
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 42
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer11/7/2013 12:00 PM Martinez ONLINE
Contra Costa, County of
Lab Building Roof Replacement
11/7/2013 2:00 PM Hollister Online San Benito, County ofCienega Road Realignment
11/7/2013 2:00 PM Sacramento ONLINE
California State University Sacramento
Sierra & Sutter Halls Fire Alarm Installation
11/7/2013 2:00 PM Chowchilla Online State of CaliforniaHVAC System Testing, Adjusting, and Balancing (TAB)
11/7/2013 3:00 PM San Jose ONLINE
San Jose, City ofTree Management and Maintenance Services Proposal
11/7/2013 3:00 PM San Francisco Online San Francisco, City & County of
Sunset Tunnel Trackway Improvement Project
11/7/2013 3:00 PM Merced, Winton ONLINE
Merced, County ofRe-Roofing of Three County Buildings at Three Separate Locations
11/7/2013 2:00 PM Sacramento ONLINE
Sacramento, County of, Internal Services
Greenback Lane at Walnut Avenue Sidewalk Infill
11/7/2013 4:00 PM Fresno ONLINE
Fresno, City ofSOQ - Friant, Nees, & Willow Avenue
11/8/2013 2:00 PM Sacramento ONLINE
Sacramento Area Flod Control Agency
South Sacramento Streams Group Morrison Creek Soundwall Repair
11/8/2013 3:00 PM Merced & Hilmar ONLINE
Merced , County ofMessage Board Signs at Three County Fire Stations & Mobile Message Board Sign
11/8/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
McCoppin Hub Plaza - REBID
11/8/2013 3:00 PM Hanford ONLINE
Kings, County OfElectrical Service to New Morgue Building
11/8/2013 2:00 PM Mendota ONLINE
Zumwalt Construction, Inc.
RAD Projects - Mendota
11/8/2013 11:00 AM Visalia ONLINE
Visalia, City OfMobile Dewatering Unit (Water Conservation Plant)
11/8/2013 2:30 PM Visalia ONLINE
Tulare, City ofPackwood Creek Trail Thru Diamond Creek Estates Between Paradise Ave & College Ave
11/11/2013 2:00 PM Hawthorne ONLINE
Ed Grush General Contractor
Hawthorne Towne Center
11/11/2013 2:00 PM Monterey ONLINE
The Hatch GroupIt's Sugar Store
11/11/2013 5:00 PM Pasadena ONLINE
Gray-I.C.E. Builders, Inc
Athleta
11/11/2013 2:00 PM Carlsbad ONLINE
Prime Group Construction
Alps Innovation Staybridge Suites
11/11/2013 2:00 PM Soledad ONLINE
Midstate ConstructionCamphora Apartments
11/11/2013 2:00 PM Sacramento ONLINE
Sierra ContractingKids Footlocker/Fly Zone # 6730 TI (Specs On Plans)
11/12/2013 3:00 PM Fresno ONLINE
Fresno, City ofRequirements Contract Property Maintenance & Weed Control
11/12/2013 2:00 PM Modesto ONLINE
Modesto City SchoolsModesto City Schools Door Lock Hardware
11/12/2013 2:00 PM Modesto ONLINE
Modesto City SchoolsModesto City Schools Security Cameras
11/12/2013 11:00 AM Modesto ONLINE
Modesto, City of Asphalt and Concrete Saw Cutting Services
11/12/2013 2:00 PM Fairfield ONLINE
Fairfield, City OfLandscape Maintenance for Linear Bike Trail
11/12/2013 2:00 PM Fairfield ONLINE
Fairfield, City OfLandscape Maintenance District No. 5 Smith Ranch ( Rancho Solano)
11/12/2013 2:00 PM Fairfield ONLINE
Fairfield, City OfLandcape Maintenance for Rolling Hills-Kolob-Waterman Highlands Lighting & Landscape Maintenance Districts
11/12/2013 3:00 PM San Francisco ONLINE
San Francisco, City & County of
Bayview Opera House Improvement Project
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 43
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer11/12/2013 2:00 PM Salinas ONLINE
Midstate ConstructionHartnell Community College Science & Planetarium Building
11/12/2013 3:00 PM San Francisco ONLINE
University of California, San Francisco
San Francisco General Hospital Bldg 1 Rooms 127 & 129 Dept of Neurosurgery Lab Reconstruction
11/12/2013 3:00 PM Fresno ONLINE
Fresno, City ofTraffic Signal Installation at the Intersection of Champlain & Liberty Hill/Saybrook Avenues
11/12/2013 2:00 PM Fairfield ONLINE
Fairfield, City OfLandscape Maintenance for Airbase Parkway
11/12/2013 2:00 PM San Francisco ONLINE
San Francisco International Airport
Residential Airport Noise Insulation Program 2012-2014 Phase
11/12/2013 3:00 PM Roseville ONLINE
Roseville, City of2013 Wastewater Cured-In-Place Pipe Rehabilitation Project
11/12/2013 2:00 PM Tiburon ONLINE
Carollo EngineersSanitary District No. 5 of Marin Co-Entryway Addition & ADA Access Improvements
11/12/2013 3:00 PM Fresno ONLINE
Fresno, City ofMartin Ray Riley Park
11/12/2013 3:00 PM Fresno ONLINE
Fresno, City ofTraffic Signal Installation at the Intersection of Millbrook & Spruce Avenues
11/12/2013 10:00 AM San Jose ONLINE
Parkway ConstructionLDS Church Re-Roof & Voluntary Seismic Upgrade
11/12/2013 2:00 PM Fremont ONLINE
Fremont, City of2013 Base Repair & Overlay Project
11/12/2013 1:30 PM Ukiah ONLINE
Ukiah, City OfOrchard Stubstation T-1 Bushing Replacement Project
11/12/2013 2:00 PM Eldridge ONLINE
Department of General Services
Sediment Pond Replacement
11/12/2013 2:00 PM Sacramento ONLINE
Sacramento, city ofPainting of Traffic Signal Hardware
11/12/2013 2:00 PM Novato ONLINE
Novato, City OfCustodial Staff Relocation New Storage Building
11/13/2013 2:00 PM San Mateo E307B, 009
San Mateo, City of2014 Community Development Block Grant Sidewalk & Street Improvements Project
11/13/2013 2:00 PM Contra Costa Co. ONLINE
SR4/SR160 Ramp Connectors
11/13/2013 3:00 PM Chino ONLINE
California State University-Chico
RFQ-North Campus Utility and ADA Improvements, Phase I
11/13/2013 2:00 PM Aptos ONLINE
Cabrillo Community College District
Building 100 HVAC Renovation
11/13/2013 3:00 PM Santa Clara ONLINE
Santa Clara, City ofMonroe Street, Chromite Dirve, Machado Avenue,e and Nobili Avenue Sanitary Sewer Improvements Phase II
11/13/2013 4:00 PM Merced ONLINE
University of California, Merced
Solar Photovoltaic System(s) -UC Merced
11/13/2013 4:00 PM Merced ONLINE
Merced, City OfSweeping of Parking Lot at the Human Services Agency
11/13/2013 2:00 PM Capitola ONLINE
Barry Swenson BuilderRemodel/Addition to Harbor Lights Motel
11/13/2013 2:00 PM Oakland ONLINE
Port of OaklandFurnishing Labor, Equipment, and Materials for Repair and Minor Construction of Security Fencing for Port of Oakland Facilities for the Period Commencing January 1,2014 and Ending December 31, 2014, 2015, or 2016 Oakland, California
11/13/2013 2:00 PM San Jose ONLINE
Cartwright Architects & Engineers
LDS Church Noreen Meetinghouse Reroof & Voluntary Structural Improvements (Invited Bidders Only)
11/13/2013 1:00 PM Fairfield ONLINE
Cartwright Architects & Engineers
LDS Church Travis Meetinghouse Steeple Replacement (invited Bidders Only)
11/13/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
RFQ - As-Needed Special Inspection & Testing Services 2013
11/13/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
Mission Dolores Park Rehabilitation Project
11/13/2013 3:00 PM Union City ONLINE
D.A. Bentley Construction
Buffalo Wild Wings Tenant Improvement
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 44
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer11/14/2013 3:00 PM San Rafael 017C,
R005Marin, county ofChambers Audio Visual Technology Upgrade Project
11/14/2013 2:00 PM Larkspur D008, 008C
Marin, county ofCentral Marin Ferry Connection Multi-Use Pathway
11/14/2013 2:00 PM San Mateo E306B/016C
San Mateo, City of2013-2014 Sanitary Sewer Rehabilitation
11/14/2013 1:30 PM San Jose E312B/081C
Santa Clara Valley Transportation Authority
Gross & Holmes Building Abatement & Demolition Contract
11/14/2013 4:00 PM Solano County ONLINE
Solano, County OfRFQ - Facilities Condition Assessment Services for Solano County Division of Architectural Services - Cancelled
11/14/2013 3:00 PM San Jose ONLINE
San Jose Evergreen Community College Dist
RFQ - Lease-Leaseback Service for Physical Education Building
11/14/2013 2:00 PM Fair Oaks ONLINE
San Juan Unified School District
John Holst ES aka La Vista Center, Restroom Upgrades & Starr King K-8 School, Restroom Upgrades
11/14/2013 2:00 PM Stockton ONLINE
Stockton, City ofWater Well 25 & 26 Diesel Engine Conversion to Electric Motor
11/14/2013 2:00 PM Cerritos ONLINE
ARRIS Builders, Inc.Planet Fitness
11/14/2013 2:00 PM Elk Grove ONLINE
Elk Grove, City ofIsland Park Project
11/14/2013 2:00 PM Newcastle ONLINE
Placer County Water Agency
Foothill Tube Settler Replacement
11/14/2013 2:00 PM Concord ONLINE
Department of General Services
Concord DMV, Ceiling & Lighting Renovation
11/14/2013 2:00 PM Merced ONLINE
University of California, Merced
Science & Engineering Building 2 (0206)-Signage Bid Package
11/14/2013 2:00 PM Hayward ONLINE
Department of Motor Vehicles
Parking Lot Repair, Seal, & Stripe at the Hayward Field Office
11/14/2013 2:00 PM Turlock ONLINE
Stanislaus, UCSewer Lift Station Project
11/14/2013 2:00 PM Oakland ONLINE
Oakland, City ofSanitary Sewer Root Foaming FY 2013-14
11/14/2013 2:00 PM Sacramento ONLINE
Sacramento Area Sewer District
Anatolia Force Main Hydrogen Sulfide Mitigation Project
11/14/2013 2:00 PM Sacramento ONLINE
Sacramento Area Sewer District
Nacy Buildings Roof Repair
11/14/2013 3:00 PM Hanford ONLINE
Kings, County OfKings County Morgue
11/14/2013 2:00 PM Tracy ONLINE
Acme Construction Company, Inc.
AG Science CTE Modernization & E. Baumgardener Theater Modernization
11/14/2013 3:00 PM Modesto ONLINE
Timothy P. Huff & Associates, Inc
Outdoor Amphitheater at Stanislaus Elem School
11/14/2013 2:00 PM Vallejo ONLINE
Vallejo, City ofUrban Runoff Treatment Retrofits
11/14/2013 11:00 AM San Rafael ONLINE
Marin Municipal Water District
2013-2014 Los Ranchitos Tank Coating
11/14/2013 3:00 PM Various ONLINE
El Dorado Irrigation District
Security Systems Replacement
11/15/2013 3:00 PM San Jose ONLINE
San Jose, City ofTemporary Modular Living Facility
11/15/2013 11:00 AM San Francisco ONLINE
San Francisco Unified School District
State A.B. 211 Door Lockset Replacement at Various Sites-Bid Package 3
11/15/2013 10:00 AM Fresno ONLINE
Fresno Unified School District
Education Center Data Room HVAC Upgrade
11/15/2013 5:00 PM San Jose ONLINE
San Jose, City OfRFQ-Emergency Diesel Generator Package 2A
11/15/2013 2:00 PM Salinas ONLINE
SD Deacon General Contractors
Michael's Arts & Crafts
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 45
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer11/18/2013 2:00 PM Oakland* E316B/0
82CSkyline Ranch Equestrian Center Roof Replacement
11/18/2013 2:00 PM Rocklin ONLINE
Moorefield ConstructionRocklin Commons-Majors C (Ross) & D (Steinmart) & Shops E
11/18/2013 2:00 PM Sacramento ONLINE
San Juan Unified School District
Encina Prepatory HS Student Toilet Room Upgrades
11/19/2013 10:00 AM Concord E310B/019C
Contra Costa Water District
Bollman Water Treatment Plant Filter Valves Replacement Project
11/19/2013 2:00 PM Livermore E311B/021C
Alameda, County ofThe Adjustment of Traffic Signal Boxes on Tesla Road & Greenville Road
11/19/2013 3:00 PM Fresno ONLINE
Fresno, City ofFirst Avenue Wireless ITS Project
11/19/2013 2:00 PM Santa Rosa ONLINE
Santa Rosa, City ofIndustrial Drive to Piner Road Sewer Improvements
11/19/2013 2:00 PM Berkeley ONLINE
Berkeley, UCHellman Tennis Center Upgrades
11/19/2013 2:00 PM Bodega Bay ONLINE
Sonoma, County ofDoran Pak - Jetty Day Use Disabled Access Improvements
11/19/2013 2:00 PM Lakeport ONLINE
Department of Motor Vehicles
Janitorial Services for Lakeport DMV
11/19/2013 11:00 AM Long Beach ONLINE
Shames ConstructionSams Club # 6613-207
11/19/2013 11:00 AM Bakersfield ONLINE
Bakersfield, City ofBathroom Reconstruction at Fire Station # 1
11/19/2013 2:00 PM Clovis ONLINE
Clovis, City ofEnterprise Canal Trail from N. Temperance to Alluvial
11/19/2013 3:00 PM Antelope ONLINE
Tractor Supply Company
11/19/2013 2:00 PM Alameda Co & Contra Costa Co
S001/007C
Bay Area Rapid Trnsit District
Bart Earthquake Safety Program Site Restoration at Various Locations
11/20/2013 2:30 PM San Francisco ONLINE
San Francisco, City & County of
Various Locations Multilayer Micro-Surfacing FY 2013-2014
11/20/2013 3:00 PM Colusa ONLINE
Stout Building Contractors
Dollar General Store-Colusa
11/20/2013 2:00 PM Sacramento ONLINE
Sacramento, City OfParkway & Valley Hi Water Meter Retrofit
11/20/2013 11:00 AM Palo Alto ONLINE
Department of Veterans Affairs
Palo Alto Campus-Fire Sprinkler Repairs
11/20/2013 4:00 PM Belmont ONLINE
Belmont, city ofBelmont Pavement Reconstruction Project
11/20/2013 2:00 PM Various ONLINE
California Department of Corrections & Rehabilitation
Electrified Fence Project Statewide Bird Netting Replacement, Phase 3
11/20/2013 4:00 PM San Jose ONLINE
San Jose Evergreen Community College Dist
Evergreen Valley College Parking Lot & Street Mainenance
11/20/2013 11:00 AM Lodi ONLINE
Lodi, City ofWestern & Southern Plumes Monitoring Wells Installation Project
11/20/2013 4:00 PM Newark ONLINE
Ohlone Community College District
Parking Lot Improvements Project
11/20/2013 2:00 PM Arbuckle ONLINE
Stout Building Contractors
Dollar General Store-Arbuckle
11/21/2013 2:00 PM Fair Oaks ONLINE
San Juan Unified School District
Orangevale Open K-8 (Roberts) Student Toilet Room Upgrades
11/21/2013 2:00 PM Elk Grove ONLINE
Elk Grove, City ofElk Crest Drive Storm Drain Pipe Replacement Project
11/21/2013 2:00 PM Oakland ONLINE
Oakland, City of23rd Ave/ 29th Ave Rail Crossing Improvements - REBID
11/21/2013 3:00 PM San Jose ONLINE
San Jose, City Of7427-Public Works General Engineering Contract for Sewer Repairs 2013-15 (Contract II)
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 46
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer11/21/2013 2:00 PM Santa Clara ONLINE
Santa Clara Valley Transportation Authority
Civil and Station Improvements Contract Santa Clara-Alum Rock Bus Rapid Transit -Cancelled
11/21/2013 2:00 PM Davis ONLINE
Davis, city ofParks Meter Retrofit, Program No 7523
11/21/2013 2:00 PM Stockton ONLINE
Stockton, City ofPainting of the East Channel Street Parking Garage
11/21/2013 10:15 AM Sutter County ONLINE
Sutter, County OfFY2013-14 Crack Sealer Bid
11/21/2013 2:00 PM San Francisco ONLINE
University Of California, San Francisco Medical Center
RFQ - Long Hospital L-361/L-370 CT Replacement & Neuro Angio Equipment Replacement
11/21/2013 1:30 PM Stockton ONLINE
San Joaquin, County ofMiddlefield Avenue and Roselawn Avenue Resurfacing
11/21/2013 2:00 PM Elk Grove ONLINE
PMO-CMID Building
11/21/2013 4:00 PM Los Altos ONLINE
Foothill-De Anza Community College District
RFQ - De Anza College Library
11/21/2013 3:00 PM San Jose ONLINE
San Jose, City OfDel Monte Park
11/21/2013 3:00 PM Turlock ONLINE
Turlock, City ofHVAC Unit Replacements and Roofing at TRWQCF Oprerations Building
11/21/2013 2:00 PM San Francisco ONLINE
San Francisco, City & County of
Rutland Street and Schwerin Street Sewer System Improvements
11/21/2013 2:00 PM Salinas ONLINE
Monterey, County ofNatividad Medical Center Bulding 400 Third Floor Tenant Improvements
11/21/2013 2:00 PM Escalon ONLINE
C.T. Brayton and Sons, Inc.
Campus Modernization Escalon High School (Lease-Leaseback Project)
11/21/2013 10:00 AM Sausalito Online Sausalito, City ofSausalito City Hall Parking Lot Improvements Project
11/22/2013 2:00 PM Visalia ONLINE
Visalia, City OfConstruction of Visalia Animal Control Facility
11/22/2013 3:00 PM Stockton ONLINE
Stockton, City ofStormwater Water Monitoring
11/22/2013 2:00 PM Santa Cruz ONLINE
Santa Cruz, County ofRFQ-Telephone System Replacement
11/22/2013 11:00 AM San Francisco ONLINE
San Francisco Unified School District
Nourse Auditorium Toilet Room Renovation
11/22/2013 3:00 PM Stockton ONLINE
Stockton, City ofStormwater Program Management
11/22/2013 2:00 PM Porterville ONLINE
Pacific West Builders, Inc
The Village at Henderson
11/22/2013 2:00 PM Orangevale ONLINE
San Juan Unified School District
Louis Pasteur MS Studennt Toilet Room Upgrades
11/22/2013 12:00 PM San Francisco ONLINE
Whiting-TurnerKaiser Permanente Medical Office
11/22/2013 2:00 PM Sab Francisco ONLINE
San Francisco International Airport
Runways 1-19s RSA Improvement
11/25/2013 4:30 PM Modesto ONLINE
Modesto, City of 1813 Aloha Way
11/25/2013 4:00 PM Oakland ONLINE
Bay Area Toll AuthorityRFQ-On-Call Construction Management & Design Services
11/25/2013 2:00 PM Mill Valley ONLINE
Mill Valley, City ofSycamore Avenue Pedestrian Improvement
11/25/2013 10:00 PM Sacramento ONLINE
Sacramento, city ofCM - Service - Scaramento City College Ped/BikeProject
11/25/2013 2:00 PM San Francisco ONLINE
Cahill Contractors, Inc.Hunter's Point Shipyard Phase 1-Block 56-57
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 47
PROJECT BID SCHEDULE
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Bid Date Bid Time Project Name City BIN # Plan Issuer11/26/2013 2:00 PM Various 022C Bay Area Rapid Trnsit
DistrictWayside Fence Refurbishment, R-Line
11/26/2013 2:00 PM San Mateo 023C/R023
San Mateo, City of25th Avenue Sanitary Sewer Relief Line Project
11/26/2013 2:00 PM Dublin/San Leandro ONLINE
Alameda, County ofRFQ-ACSO Sandy Turner II Educational Center & BHCS Villa Short Stay Facility
11/26/2013 2:00 PM Sacramento ONLINE
California State University Sacramento
American River Courtyard Domestic Hot Water Controls Modifications
11/26/2013 2:00 PM Sacramento ONLINE
San Juan Unified School District
Laurel Ruff Learning Center Student Toilet Upgrades
11/29/2013 2:00 PM Visalia ONLINE
Visalia, City OfAnnual Contract for Backflow Maintenance
12/2/2013 2:00 PM Sacramento ONLINE
Sacramento, City ofRFQ - Various On-Call Contractor Services
12/3/2013 2:00 PM Tulelake ONLINE
Department of Motor Vehicles
Tulelake HVAC Replacement
12/3/2013 2:00 PM San Francisco ONLINE
Nibbi Brothers General Contractors
Fransciscan Towers Demo & Abatement
12/3/2013 12:00 PM Bolinas ONLINE
Bolinas Community Public Utilities District
Replacement of Wastewater Treatment Plant Control Panels & Related Electrical & Piping Upgrades Bolinas Community Public Utilities District
12/4/2013 2:00 PM Milpitas ONLINE
Santa Clara Valley Water District
MIlpitas Pipeline Rehabilitation Project
12/4/2013 2:00 PM San Francisco ONLINE
San Francisco, City & County of
Point Lobos Avenue and Washington Street Pavement Renovation, Sewer Replacement and Watermain Installation
12/4/2013 9:00 AM Rancho Cordova ONLINE
California Technology Agency
Building Engineering Services
12/4/2013 3:00 PM Sunnyvale ONLINE
Sunnyvale, City ofSanitary Sewer Lift Stations Rebuild
12/5/2013 3:00 PM Santa Cruz ONLINE
Santa Cruz, UCMerrill College Renovation Phase 2 Plaza Building & Gatehouse
12/5/2013 2:00 PM Fremont ONLINE
Department of General Services
Re-Roof Building # 22 High School
12/5/2013 2:00 PM San Francisco ONLINE
San Francisco, City & County of
18th/25th/35th/47th/ Avenues & Delancey/Felton/Fern/Hawes/Madrid/Steiner Streets Sewer Replacement
12/5/2013 2:00 PM Fairfield ONLINE
Fairfield, City OfCity Parks Lighting Project-Phase 2 (Meadow Glen & Vintage Valley Neighborhood Parks)
12/6/2013 2:00 PM Concord ONLINE
Central Contra Costa Transit Authority
Replacement of HVAC Units
12/6/2013 11:00 AM Oakland ONLINE
Port Of OaklandBuilding Maintenance Services
12/6/2013 2:00 PM Madera ONLINE
Madera, County OfMadera County Government Center Third Floor Tenant Improvement
12/6/2013 11:00 AM Visalia ONLINE
Visalia, City OfProfessional Design Services for the Greenway Trail along SCE Power Lines from Cameron Creek to St. John's River Trail
12/9/2013 2:00 PM San Lorenzo ONLINE
Alameda, County ofSan Lorenzo Library Expansion
12/9/2013 2:00 PM Sacramento ONLINE
Sacramento City Unified School District
Marquee Sign - Installation & Site Work
12/12/2013 2:00 PM San Francisco ONLINE
San Francisco, City & County of
Alhambra/Bay/Beach Streets and Mallorca/Retiro/Toledo Way Sewer Replacement
12/17/2013 2:00 PM Oakland E309B/080C
San Francisco Bay Area Rapid Transit District
Procurement of 75KVA, 34.5kV/208Y-120V Control Transformers
12/26/2013 2:00 PM Alameda County ONLINE
Alameda, County ofRegional Renewable Energy Procurement
12/31/2013 4:00 PM San Ramon ONLINE
San Ramon Valley Unified School District
Inclusion Letter for Licensed Contractors, San Ramon Valley Unified School District
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 48
www.marinba.org ◆ [email protected] ◆ [email protected]
O
ne n
ight
a w
eek
for
18 w
eeks
----
---
Wed
nesd
ay, 5
p.m
. – 9
p.m
. Fu
ll C
redi
t --
--- 5
uni
ts
FR
EE
TO
MA
RIN
CO
UN
TY
HIG
H S
CH
OO
L ST
UD
EN
TS
$
65.0
0 m
ater
ial f
ee fo
r al
l non
-hig
h sc
hool
par
tici
pant
s
See
You
r Sc
hool
To
Car
eer
Cen
ter
or C
onta
ct t
he R
OP
off
ice
at 4
99-5
860
VIS
IT O
UR
WEB
SITE
: cla
ssro
om.y
hwdi
y.co
m O
pen
the
RO
P ta
b
Intr
oduc
tion
to
GR
EEN
Bui
ldin
g
Sp
onso
red
by
Mar
in C
ount
y R
egio
nal
Occ
upat
iona
l Pro
gram
M
arin
Cou
nty
Off
ice
of E
duc
atio
n M
arin
Bui
lder
s A
ssoc
iati
on
Nat
iona
l Ass
ocia
tion
of R
emod
elin
g In
dus
try
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 49
www.marinba.org ◆ [email protected] ◆ [email protected]
R
OP
CO
NST
RU
CT
ION
TE
CH
NO
LOG
Y
Red
woo
d H
igh
Scho
ol
Bu
ild a
Com
mun
ity
Pro
ject
from
the
Gro
und
Up
STU
DE
NT
S W
ILL
LEA
RN
:
G
RE
EN
BU
ILD
ING
PR
AC
TIC
ES
JOB
SIT
E &
TO
OL
SAFE
TY
FR
AM
ING
E
LEC
TR
ICA
L
PL
UM
BIN
G
WIN
DO
WS
& D
OO
RS
RO
OFI
NG
BL
UE
PR
INT
RE
AD
ING
BU
ILD
ING
FR
OM
LO
CA
L PR
OFE
SSIO
NA
LS
HA
ND
S-O
N T
RA
ININ
G
Hig
h Sc
hool
Stu
dent
s ca
n ea
rn c
redi
ts-u
p to
5 u
nits
Qua
lify
for
Sum
mer
Inte
rnsh
ip E
mpl
oym
ent w
ith
a C
onst
ruct
ion
Prof
essi
onal
Ear
n th
e M
arin
Cou
nty
RO
P W
ork
Rea
dine
ss C
erti
ficat
e
The
Mar
in C
ount
y O
ffice
of E
duca
tion
Regi
onal
Occ
upat
iona
l Pro
gram
doe
s not
dis
crim
inat
e on
the
basi
s of r
ace,
col
or, n
atio
nal o
rigi
n, se
x, d
isab
ility
, or a
ge in
an
y of
its p
olic
ies,
proc
edur
es, o
r pra
ctic
es in
com
plia
nce
with
Titl
e VI
of t
he C
ivil
Righ
ts A
ct, T
itle
IX o
f the
Edu
catio
n Am
endm
ents
of 1
972,
Sec
tion
504
of th
e Re
habi
litat
ion
Act o
f 197
3, a
nd th
e Ag
e D
iscr
imin
atio
n Ac
t of 1
975.
“Con
stru
ctio
n is
ver
y in
tere
stin
g. It
is fu
n to
bui
ld
and
lear
n to
man
age
thin
gs.”
Form
er S
tude
nt R
OP
“I le
arne
d w
hat a
n em
ploy
er
look
s fo
r in
hir
ing
an
empl
oyee
.” Fo
rmer
Stu
dent
RO
P
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 50
www.marinba.org ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
SEEKING A MECHANIC / TECHNICIAN
Cal-West Rentals is in search of a technician to work within our service department at our yard in Petaluma. They will be responsible for repairing and maintaining all types of equipment including small engines, heavy construction equipment, and delivery trucks.
The work is mostly in the shop, but also includes field service calls and deliveries of equipment. It is a full-time position, M-F, with full benefits. This person will be reporting to our service manager. Must possess knowledge and experience in the mechanical and construction field.
Please apply to [email protected] or call 707.763.5665.
SEEKING ESTIMATOR FOR RESIDENTIAL CONSTRUCTION
Seeking Estimator/Project Manager for a Marin based Residential General Contractor.Requirements:• Minimum 10 years experience in Residential
Construction. Field experience desired.• Offering Benefits• Salary DOE
Please reply to the email below with your resume if you are interested.
Lee Bonilla - Fontana Construction Inc. 1945 E. Francisco Blvd. Suite N., San Rafael ,CA 94901
415-457-1290 P | 415-457-1294 F | [email protected]
SEEKING EXPERIENCED ACCOUNTINGPROFESSIONAL WITH EXTENSIVE OFFICE
MANAGEMENT SKILLS
Must be highly motivated and organized with strong human resource skills. The primary duties of the position include:
• Direct and manage all accounting functions • Produce all monthly and yearend financial reports • Responsible for all human resource functions • Responsible for all payroll related activities including state and fed-
eral tax filings and reporting • Assist with all insurance activities, including auto, liability, personal
property and workers compensation
Experience – minimum of five years experience in increasingly complex accounting positions with a similar level of managerial responsibility. Experience with computers and accounting software is required, con-
struction accounting and software experience a plus.
Qualified applicants may reply with a resume, cover letter and salary requirements to [email protected]
SEEKING ESTIMATOR FOR CONCRETE CONTRACTOR
Concrete company seeks an experienced Estimator for residential/commercial projects. Must have experience in estimating concrete to apply.
Be able to prepare complete estimates for assigned project by doing a thorough and complete takeoff of the scope and quantities of work.Review proposal specifications, drawings, attend pre-bid meetings, etc. to determine scope of work and required contents of estimate.Prepare subcontracts, materials list once job is awarded..Prepare, RFI’s, change orders and all other construction related documentation.Interface with owners, vendors, subcontractors and lower tier employees.
Must have clean DMV and pass drug test.
Qualified applicants may reply with a resume, cover letter and salary requirements to [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 51
www.marinba.org ◆ [email protected] ◆ [email protected]
CLASSIFIED ADSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
CLAD MARVIN WINDOWS FOR SALE $9,500
Marvin aluminum clad windows/doors, Evergreen exterior with primed pine interior. Includes all window hardware and screens. All sizes listed below are the rough opening sizes.
Windows have not been installed, packaging only opened to verify hardware and screens.
1. Ultimate Casement CN3648 37” x 47 5/8”2. Ultimate Casement CN3648 37” x 47 5/8”3. Ultimate Casement CN3648 37” x 47 5/8”4. Ultimate Casement CN3648 37” x 47 5/8”5. Ultimate Casement CN3648 37” x 47 5/8”6. Ulitmate Sliding French Door CN6668 78” x 82 1/2”7. Ultimate Single Light Outswing Door CN3680 44 7/16” x 96”8. Ultimate Casement CN2436 25” x 35 5/8”9. Ultimate Casement CN3660 37” x 59 5/8”10. Ultimate Picture Window 90 1/4” x 59 5/8”11. Ultimate Casement CN3660 37” x 59 5/8”12. Ultimate Bay Window, Casement/Fixed/Casement 93 3/4” x 66 1/2”
Please call Jon to come see the windows.
415-250-4267
FLOYD CONSTRUCTION, INC.LICENSE #365653
714 C STREET #207SAN RAFAEL, CA 94901
(415) 485-0645FAX 485-9297
SEEKING ESTIMATOR/PROJECT MANAGER WHO WILL:
• Seek out projects to bid• Complete estimates and produces proposals• Create material list for the job and compares to bid• Review purchase orders from jobs and manages any
discrepancies• Participate in job scheduling • Review job site prior to start of job and throughout
project to completion for quality• Determine material and equipment schedule and assure
delivery to job• Visit job sites as needed throughout the project• Maintain contact and communication with client
representative on the job• Schedule subcontractors and follow up to assure work is
done as needed, on time, and to specifications• Assure job site inspections are occurring• Coordinate job payment schedule with Accounting
Dept.• Document job changes in writing with assistance from
Project Assistant
MINIMUM QUALIFICATIONS• 5 years experience in concrete construction estimating
and project management• 5 years construction field experience• College or other coursework in construction
management or estimating• Strong organizational, interpersonal skills• Proficient on MS Office • Clean DMV, drug free
Please forward resume and salary requirements to [email protected]
Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 52Marin Builders Association ◆ Weekly Bulletin ◆ Page 34
Publication rules for submission of articles to the MBA Weekly Bulletin
Members cornerLimited to 600 words and edited for length, grammar, spelling, clarity, style, libel and civility. We do not publish form
letters, petitions or consumer complaints. Please include writers name, address and phone number. All submissions become the property of Marin Builders Association and cannot be returned.
note: We would like a photo (jpeg) head shot and can offer ¼ page ad space to *fill out page for ½ the price.
*Ad space only available to fill out page if necessary.
www.marinba.org ◆ [email protected]
Page 34
Marin Builders Associationcirca 1962