Materials: Steps towards 700°C power plantfiles.messe.de/cmsdb/001/14491.pdf · ·...
Transcript of Materials: Steps towards 700°C power plantfiles.messe.de/cmsdb/001/14491.pdf · ·...
Materials:
Steps towards 700°C power plant
C. Stolzenberger
VGB PowerTech e.V.
User Forum
of the
Power Plant Technology, 21.-25.4.2008
24. April 2008 Power Plants - Technology in Dialogue 2
• Motivation
• Actual high efficient Power Plants
• Activities towards 700°C Ultra Super
Critical Coal Generation
• 700°C-Demonstration Power Plant
• Summary
24. April 2008 Power Plants - Technology in Dialogue 3
30%
35%
40%
45%
50%
55%
1950 1970 1990 2010 2030
Efficiency Development (Hard Coal Power Station)N
et
Eff
icie
ncy
Nickel basis material
(350 bar, > 700°C)
Austenites(290 bar, 600°C)
Ferrites und Martensites(260 bar, 545°C)
CCS needsEfficiency Increase
1950 1970 1990 2010 2030
24. April 2008 Power Plants - Technology in Dialogue 4
• Motivation
• Actual high efficient Power Plants
• Activities towards 700°C Ultra Super
Critical Coal Generation
• 700°C-Demonstration Power Plant
• Summary
24. April 2008 Power Plants - Technology in Dialogue 5
New Power Plant
Total capacity 3 x 660 MW ~2000 MW
Live-steam 604°C / 250 bar / 1915 t/h
Reheater-steam 612°C / 56 bar / 1591 t/h
Efficiency increased more than 10% 44,7%
Boiler Material
- Martensite: P91, P92,
- Austenite: Super 304 (shot blasted)
Emissions (mg/Nm3)
Design values European limits
- NOx 100 200
- SO2 100 200
- Particulate 15 30
Commercial operationend 2008/ mid 2009 / end 2009
Actual high efficient Power Plants (Hard Coal)
ENEL’s conversion project
Torrevaldaliga Nord from oil to coal
Before conversion
After conversion
24. April 2008 Power Plants - Technology in Dialogue 6
• Motivation
• Actual high efficient Power Plants
• Activities towards 700°C Ultra Super
Critical Coal Generation
• 700°C-Demonstration Power Plant
• Summary
24. April 2008 Power Plants - Technology in Dialogue 7
700°C - Boiler Test Programme
COMTES700 –
Component Test Facility for a 700°C Power Plant
Objectives
- Manufacturing, bending and welding of the components in real plant dimensions for a power plant with efficiency higher than50%,
- Operational behaviour of all components especially operational testing of Ni-based alloys for tubes, pipes and valves,
- Flue gas corrosion and steam oxidation behaviour of the materials and erosion effects due to sootblowing,
- Operation started in summer 2005
- Approximately min. 20.000 operation hours, end expected 2009/11
24. April 2008 Power Plants - Technology in Dialogue 8
Membrane
Wall
Superheater
Host Plant - Scholven F, Germany, E.ON
► Net output
– 676 MW
► Live-steam
– 220 bar
– 540 °C
– 2,250 t/h
► Reheater-steam
– 44 bar
– 540 °C
– 2,044 t/h
► Fuel
– Hard coal
COMTES700 - Implementation into Host Boiler
24. April 2008 Power Plants - Technology in Dialogue 9
COMTES700 - Flow Diagram
M
Mass Flow ~ 12 kg/s
from SH1
Inlet Header
from
Injection
SuperheaterMembrane Wall
Safety Valve
Turbine
Valve
to SH4
Outlet
Header
to Reheater 1
Outlet Header
410°C
222 bar 610°C 705°C
536°C
210 bar
410°C
44 bar
HP-Bypass
24. April 2008 Power Plants - Technology in Dialogue 10
8,800 mm
43 x
48
=
2,0
46
mm
Outlet
44 parallel tubes
7 CrMoVTiB 10 10/T 24
13 CrMo44
P 92Alloy 617
Inlet
HCM 12
Membrane Wall
Tube diameter 33,7 x 7,1 mm
COMTES700 - Material Concepts
Superheater 1 & 2
Tube diameter 44,5 x 10 mm
1) 2)
24. April 2008 Power Plants - Technology in Dialogue 11
Project Budget: € 23.2mEmax Partners
– DONG Energy
– E.ON
– EdF
– Electrabel
– EnBW
– Enel
– PPC
– RWE
– Vattenfall Europe
– Vattenfall Nordic
Industrial Partners
– Alstom
– BWE
– HPE
– Siemens
Know-how Access
– EVN
– Evonik Energie
– GKM
26% - (EC) RFCS € 6.1m
3% - Know-howAccess € 0.7m
4% - IndustrialPartners € 0.8m
67% - Emax Partners € 15.6m
COMTES700 - Budget, Financing & Partner
24. April 2008 Power Plants - Technology in Dialogue 12
Steam
700°C - Turbine Test Programme
COMTES700 - Turbine Valve
Target
• Testing most critical components of a 700 °C turboset
• Integration in COMTES700 and operation time > 20,000 h
• Evaluation of
- metal temperatures
- deformation and
- expansionSteam
24. April 2008 Power Plants - Technology in Dialogue 13
700°C - Material Test Programme
Esbjerg Test Rig (720°C), Esbjerg, Denmark
• Precursor of COMTES700 and maturity test of materials
• Materials tested over > 30,000 h
Austenite Ni-based Material
- Sanicro 25 - Alloy 740
- HR3C - Alloy 617
- TP347HFG
24. April 2008 Power Plants - Technology in Dialogue 14
MARCKO700 - Boiler
Material Qualification for the 700 / 720 °C Power Plant
Evaluation of long-term characteristics u. operation conditions
• 7CrMoVTiB 10-10
• T/P92
• 12CrCoMo
• Alloy 617
MARCKO III - Turbine
Optimized materials and material compounds behaviour
for 700 / 720 °C steam turbine components
• Development of models for the description of the thermal
cyclical behaviour
• Analytical and numeric assessment of dissimilar weldments
700°C - Material Test Programme
24. April 2008 Power Plants - Technology in Dialogue 15
COORETEC - Projects
• Fireside corrosion and steam side oxidation behaviour of
materials for the 700 °C power plant
• Characterisation of superheater materials for 700°C power
plant after cold deformation
• Characterisation of strength and deformation of pipes and
forgings made of Ni-base alloys
• Qualification of dissimilar weldings between 10 % Cr-steels
and Ni-based alloys
• Fracture mechanics approaches for life time assessment of
components operating in 700°C temperature regime
• Optimisation of non-destructive testing methods for thick
walled components made of Ni-base alloys
700°C - Material Test Programme
24. April 2008 Power Plants - Technology in Dialogue 16
AD700-1 Creep Tests
Targets
Creep rupture strength after 100,000 h (expected)
- Sanicro 25 for 700 °C 96 MPa
- Inconel 740 for 750 °C 107 MPa
- Nimonic 263 for 750 °C 89 MPa
Sanicro 25
Nimonic 263
Alloy 740
700°C - Material Test Programme
24. April 2008 Power Plants - Technology in Dialogue 17
• Live Steam Pressure 250/350 bar
• Live Steam Temperature 700°C
• Reheat Temperature 720°C
• Gross Power
Demo Plant ~ 500 MW
Full Scale Plant 700 – 1100 MW
• Fuel
Demo Plant Hard Coal
Full Scale Plant Hard Coal/Lignite
Specification NRW 700°C Power Plant (NRW PP700)
700°C - Power Plant Feasibility Study
24. April 2008 Power Plants - Technology in Dialogue 18
Defining BoundaryConditions
Basic DesignBoiler Variants
Scale-Up1,000 MW
Detailed Design
Boiler Turbine BoP
Transferto Lignite
Tim
e
Step by stepprocedure
Target (NRW PP700)
• Technical and economical viability of a 700 °C Power Plant
700°C - Power Plant Feasibility Study
24. April 2008 Power Plants - Technology in Dialogue 19
• Motivation
• Actual high efficient Power Plants
• Activities towards 700°C Ultra Super
Critical Coal Generation
• 700°C-Demonstration Power Plant
• Summary
24. April 2008 Power Plants - Technology in Dialogue 20
E.ON‘s Project
“….50plus“
Efficiency: ≥ 50 % LHV
Capacity: ≥ 500 MWbr
Investment: ≥ 1 bn. €
Location: Wilhelmshaven, E.ON, Germany
700°C - Demonstration Power Plant
until 2009 20152011
Pre-Engineeringsize and site
ErectionStart-up
Material issues, tenderorder, approval
24. April 2008 Power Plants - Technology in Dialogue 21
• Motivation
• Actual high efficient Power Plants
• Activities towards 700°C Ultra Super
Critical Coal Generation
• 700°C-Demonstration Power Plant
• Summary
24. April 2008 Power Plants - Technology in Dialogue 22
700°C-Material Tests . . . . . .
700°C-PP Feasibility Study .
700°C-Boiler- & Turbine
Component Tests . . .
700°C-Power Plant ≥ 50 % . .
600°C-Power Plant ~ 46 % . .
2008 2010 2012Year 2014 2016
Wilhelmshaven (DE)
Torrevaldaliga (IT), Datteln (DE), etc.
Pathway to 700°C-Power Plant
24. April 2008 Power Plants - Technology in Dialogue 23
Thank you for your attention !
COMTES700 is funded by the Research Fund for Coal and Steel of the European Commission (project number RFC-CP-04003),
European Power Plant Operators, Manufacturers andco-ordinated by VGB PowerTech e. V.