Standard Guide for Materials Handling Equipment for Hot Cells C1554-11
Presenter: Steven Shaw P.E.
Merrick & Company
SCOPE AND APPLICABILITY
• Material Handling Equipment used in hot cells/shielded facilities.
• DOES NOT apply to equipment used in commercial power reactors.
• IS NOT a substitute for applied engineering skills, proven practices and experience.
Scope and Applicability (cont.)
• CRANES • HOISTS • MECHANICAL MASTER
SLAVE MANIPULATORS • ELECTRO-MECHANICAL
MASTER SLAVE MANIPULATORS
• CARTS • BOGIES • SPECIAL EQUIPMENT
• Design • Fabrication • Installation • Maintenance • Repair • Replacement • Decontamination and • Decommissioning
REFERENCES AND DEFINITIONS
SIGNIFICANCE AND USE
• Guide intended as a supplement to other standards, codes and criteria.
• Guide intended to be generic.
• Identifies considerations and recommendations for material handling equipment used in high radiation, remote work environments (surface finish, tolerances, decontamination provisions).
QUALITY ASSURANCE
Recommends Quality Assurance Programs compliant with: • ASME NQA-1 • ISO 9001 • Any legal authorities
having jurisdiction.
GENERAL REQUIREMENTS
• Minimize equipment in the cell. • Design for collision avoidance and damage. • Equipment Installation sequences should be
considered in the design to prevent handling over and around other installed equipment.
MATERIALS OF CONSTRUCTION
• GENERAL CONSIDERATIONS • REFERENCE TO MATERIALS GUIDE IN ASTM
C1533 FOR MATERIALS WITH LIMITED RADIATION TOLERANCE.
EQUIPMENT: MANIPULATORS
Reliance on manipulators to bring about safe operating conditions is not recommended.
The standard addresses design considerations and recommendations for • Mechanical
Master Slave • Powered • Fixed Powered • Carriage
Mounted
EQUIPMENT: CRANES & HOISTS CONSIDERATIONS: • REVIEW ASME NOG-1 TO
DETERMINE DESIREABLE REQUIREMENTS.
• REMOTE CABLE CUTTERS FOR RECOVERY
• SEISMIC DESIGN REQUIREMENTS
• CELL AND CRANE DESIGN TO ALLOW VERTICAL LIFTS ONLY.
• MAINTENANCE PROVISIONS
CRANES AND HOISTS: DRIVES
MAINTAIN FRONT WHEEL DRIVE CONFIGURATION REGARDLESS OF CRANE TRAVEL DIRECTION RECOVERY PROVISIONS • REDUNDANTCY • ALTERNATIVE POWER SOURCES (PNEUMATIC,
HYDRAULIC ETC) TO RECOVER FROM SEVERED ELECTRICAL SERVICE
• TETHERED • ADDITIONAL CRANE SUITABLE FOR RECOVERY
CRANES & HOISTS: HYDRAULICS
• SHOULD BE MINIMIZED. • TYPICALLY REQUIRE ROUTINE OPERATION TO
MAINTAIN SEALS. • WELDED SYSTEMS • NON-FLAMMABLE/NON-HAZARDOUS FLUID • RADIATION RESISTANCE OF SEALS AND HOSES
SHOULD BE CONSIDERED. • CRITICALITY CONCERNS FOR HYDROGENOUS
FLUIDS.
CRANES & HOISTS: AXLES & WHEELS
• SHOULD ALLOW FOR SHAFT REPLACEMENT
• WHEEL/AXLE DISASSEMBLY SHOULD NOT REQUIRE THE USE OF A HYDRAULIC PRESS.
• HARDENED WHEEL TREADS • DIMENSIONAL TOLERANCES OF DRIVE
WHEELS CONTROLLED TO PREVENT CRABBING/BINDING.
CRANES & HOISTS: TRUCKS
• WHEELS SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE, AND INCLUDE PROVSION FOR INDEPENDENT ALIGNMENT.
• JACK DOWN IDLER WHEELS, OR MULTIPLE WHEEL END TRUCKS TO ALLOW RECOVERY IN THE EVENT OF BEARING OR WHEEL FAILURE.
CRANES & HOISTS: TESTING PROOF TESTING • WHEN • HOW MUCH • METHODS • POST TEST INSPECTIONS OTHER CRANE TESTING • HOIST BRAKES • HOIST LIMIT DEVICES • TRAVEL LIMITS • OVERLOAD PROTECTION DEVICE
ELECTRICAL • WATERPROOF ENCLOSURES • BRUSHLESS MOTORS SHOULD BE
CONSIDERED (MAINTENANCE REDUCTION)
• CRANE WIRING SHOULD BE
TOTALLY ENCLOSED IN CONDUIT • WIRE INSULATION FUNCTIONAL TO
1 X 106 grays (1 x 108 rad).
• WIRING INSULATION SHOULD NOT RELEASE TOXIC OR CORROSIVE FUMES BELOW 230 °C.
• POWER SUPPLY AND CONTROLS (BUS BARS/FESTOONED CABLES, ETC) • WIRELESS CONTROL USING LEAKY COAX
CABLES. PROOF TESTING PRIOR TO ACCEPTANCE IS RECOMMENDED.
• RECOMMENDED VIEWING REQUIREMENTS
• RECOMMENDED LIGHTING REQUIREMENTS
• RECOMMENDED CAMERAS AND CAMERA FEATURES
• ELECTRICAL RECOMMENDATIONS WILL REQUIRE SOME CONVERSION FROM USA STANDARDS.
INSTALLATION STORAGE CONDITIONS CONTROLLED INSTALLATION CONDITIONS TO PREVENT DAMAGE FUNCTIONAL TESTING • MANUFACTURER’S
TEST • SITE TEST
CARTS & BOGIES
QUESTIONS?
Presenter: Steven Shaw, P.E.