Material requirement planning presentation

27
Material Requirement Planning (MRP)

description

 

Transcript of Material requirement planning presentation

Page 1: Material requirement planning presentation

Material Requirement Planning (MRP)

Page 2: Material requirement planning presentation

Contributors to MRP• Joseph Orlicky

• George Plossl

• Oliver Wight

• American Production and Inventory Control Society

Page 3: Material requirement planning presentation

What is MRP?• Computerized Inventory Control

• Production Planning System

• Management Information System

• Manufacturing Control System

Page 4: Material requirement planning presentation

When to use MRP• Job Shop Production

• Complex Products

• Assemble-to-Order Environments

• Discrete and Dependent Demand Items

Page 5: Material requirement planning presentation

What can MRP do?

• Reduce Inventory Levels• Reduce Component

Shortages• Improve Shipping

Performance• Improve Customer

Service• Improve Productivity• Simplified and Accurate

Scheduling

• Reduce Purchasing Cost• Improve Production

Schedules• Reduce Manufacturing

Cost• Reduce Lead Times• Less Scrap and Rework• Higher Production

Quality

Page 6: Material requirement planning presentation

What can MRP do?• Improve

Communication• Improve Plant

Efficiency• Reduce Freight Cost• Reduction in Excess

Inventory

• Reduce Overtime• Improve Supply

Schedules• Improve Calculation of

Material Requirements• Improve Competitive

Position

Page 7: Material requirement planning presentation

Three Basic Steps of MRP

• Identifying Requirements

• Running MRP – Creating the Suggestions

• Firming the Suggestions

Page 8: Material requirement planning presentation

Step 1: Identifying the Requirements

• Quantity on Hand

• Quantity on Open Purchase Order

• Quantity in/or Planned for Manufacturing

• Quantity Committed to Existing Orders

• Quantity Forecasted

Page 9: Material requirement planning presentation

Step 1: Important InformationMRP is…..

• Company Sensitive

• Location Sensitive

• Date Sensitive

Page 10: Material requirement planning presentation

Step 2: Running MRP – Creating the Suggestions

• Critical Items

• Expedite Items

• Delay Items

Page 11: Material requirement planning presentation

Step 3: Firming the Suggestions

• Manufacturing Orders

• Purchasing Orders

• Various Reports

Page 12: Material requirement planning presentation

Overview of the MRP System

Product Structure

File

Master Production Schedule

Inventory Master File

Material Requirements

Planning

Manufacturing Orders

Purchase Orders

Various Reports

Page 13: Material requirement planning presentation

MRP Inputs• Product Structure File

• Master Production Schedule

• Inventory Master File

Page 14: Material requirement planning presentation

Product Structure File

• Bill of Materials

Page 15: Material requirement planning presentation

Master Production Schedule

• Schedule of Finished Products

• Represents Production, not Demand

• Combination of Customer Orders and Demand Forecasts

• What Needs to be Produced

Page 16: Material requirement planning presentation

Inventory Master File• On-Hand Quantities

• On-Order Quantities

• Lot Sizes

• Safety Stock

• Lead Time

• Past-Usage Figures

Page 17: Material requirement planning presentation

MRP Process• Schedules the Production of all items using

an MRP Matrix

Item: Low-Level Code:

Lot Size: Lead Time: PD 1 2 3 4 5Gross Requirements

Scheduled Receipts

Projected on Hand

Net Requirements

Planned Order Receipts

Planned Order Releases

MRP Matrix

Page 18: Material requirement planning presentation

Terms Defined

• Item – name or number for the item being scheduled

• Low-Level Code – the lowest level of the item on the product structure file

• Lot Size – order multiples of quantity• Lead Time – the time from when an order is

placed to when it is received• PD – Past Due Time Bucket, orders behind

schedule

Page 19: Material requirement planning presentation

Terms Defined

• Gross Requirements – demand for an item by time period

• Scheduled Receipts – material already ordered• Projected on Hand – expected ending inventory• Net Requirements – number of items to be

provided and when• Planned Order Receipts – net requirements

adjusted for lot size• Planned Order Releases – planned order receipts

offset for lead times

Page 20: Material requirement planning presentation

Example of the MRP ProcessItem: A Low-Level Code: 1

Lot Size: 25 Lead Time: 1PD 1 2 3 4 5

Gross Requirements 10 15 25 25 30

Scheduled Receipts 25

Projected on Hand 20

Net Requirements

Planned Order Receipts

Planned Order Releases

Page 21: Material requirement planning presentation

Example of the MRP ProcessItem: A Low-Level Code: 1

Lot Size: 25 min Lead Time: 1PD 1 2 3 4 5

Gross Requirements 10 15 25 25 30

Scheduled Receipts 25

Projected on Hand 20 10 20 20 20 15

Net Requirements 5 5 10

Planned Order Receipts 25 25 25

Planned Order Releases 25 25 25 30 25

Page 22: Material requirement planning presentation

MRP Outputs• Manufacturing Orders

• Purchasing Orders

• Various Reports

Page 23: Material requirement planning presentation

Summary of MRPMRP is a…..• Computerized Inventory Control• Production Planning Systemthat…..• Schedules Component Items as Neededwhich will…..• Track Inventory and…..• Help you in many other aspects of business

Page 24: Material requirement planning presentation

MRP II

• MATERIAL RESOURCE PLANNING

• Introduced in 80’s• A method for the effective planning of all

resources of a manufacturing company” (APICS def.)

Page 25: Material requirement planning presentation

– Financial accounting incorporated

– Sales

– Operations Planning

– Simulate capacity requirements of different possible Master Production Schedules

Page 26: Material requirement planning presentation

• When MRP II systems began to include feedback loops, they were referred to as closed loop MRP

• Closed Loop MRP– Systems evaluate a proposed material plan relative to available

capacity

– If a proposed plan is not feasible, it must be revised• This evaluation is referred to as capacity requirements planning

Page 27: Material requirement planning presentation

MarketDemand

Productionplan

Problems?

Rough-cutcapacity planning

Yes No YesNo

Finance

Marketing

Manufacturing

Adjustproduction plan

Masterproduction schedule

MRP

Capacityplanning

Problems?Requirementsschedules