Material Requirement Planning (MRP1)
What is MRP?
Computerized Inventory ControlProduction Planning SystemManagement Information SystemManufacturing Control System
What is MRP? (cont)
This is the most comprehensive approach to manufacturing inventory and other dependents which demand an efficient inventory management system.
What is MRP do ?
The MRP system determines item-by-item, what is to be processed and when, as well as what is to be manufactured when.
This is based on order priorities and available capacities.
When to use MRP
Job Shop Production Complex Products Assemble-to-Order Environments Discrete and Dependent Demand Items
What can MRP do? Reduce Inventory Levels Reduce Component Shortages Improve Shipping Performance Improve Customer Service Improve Productivity Simplified and Accurate Scheduling Reduce Purchasing Cost Improve Production Schedules Reduce Manufacturing Cost Reduce Lead Times Less Scrap and Rework Higher Production Quality
What can MRP do?(contd)
Improve Communication Improve Plant Efficiency Reduce Freight Cost Reduction in Excess Inventory Reduce Overtime Improve Supply Schedules Improve Calculation of Material Requirements Improve Competitive Position
Three Basic Steps of MRP
Identifying Requirements Running MRP – Creating the Suggestions Firming the Suggestions
Step 1: Identifying the Requirements
Quantity on Hand Quantity on Open Purchase Order Quantity in/or Planned for Manufacturing Quantity Committed to Existing Orders Quantity Forecasted
Step 1: Important InformationMRP is…..
Company Sensitive Location Sensitive Date Sensitive
Step 2: Running MRP – Creating the Suggestions
Critical ItemsExpedite ItemsDelay Items
Step 3: Firming the Suggestions
Manufacturing OrdersPurchasing OrdersVarious Reports
Overview of the MRP System
13
Product Structure
File
Master Production Schedule
Inventory Master File
Material Requirements
Planning
Manufacturing Orders
Purchase Orders
Various Reports
MRP Inputs
Product Structure File Master Production Schedule Inventory Master File
Product Structure File
Bill of Materials: It is a materials list that provides
information useful to reconstruct the manufacturing process. It is the master product definition that contains “as designed” information.
Bill-of-Material Product Structure Tree
Bicycle(1)P/N 1000
Handle Bars (1)P/N 1001
Frame Assembly (1) P/N 1002
Wheels (2)P/N 1003
Frame (1)P/N 1004
Master Production Schedule
Schedule of Finished Products Represents Production, not Demand Combination of Customer Orders and Demand
Forecasts What Needs to be Produced
Inventory Master File
On-Hand Quantities On-Order Quantities Lot Sizes Safety Stock Lead Time Past-Usage Figures
MRP ProcessItem: Low-Level Code: Lot Size: Lead Time
PD 1 2 3 4 5
Gross requirementScheduled receiptsProjected on handNet requirementsPlanned order receiptsPlanned order releases
Terms Defined
Item – name or number for the item being scheduled Low-Level Code – the lowest level of the item on the
product structure file Lot Size – order multiples of quantity Lead Time – the time from when an order is placed to
when it is received PD – Past Due Time Bucket, orders behind schedule
Terms Defined
Gross Requirements – demand for an item by time period
Scheduled Receipts – material already ordered Projected on Hand – expected ending inventory Net Requirements – number of items to be provided
and when Planned Order Receipts – net requirements adjusted
for lot size Planned Order Releases – planned order receipts
offset for lead times
Example of the MRP ProcessItem: PD 1 2 3 4 5Gross requirement
10 15 25 25 30
Scheduled receipts
25
Projected on hand
20
Net requirementsPlanned order receiptsPlanned order releases
Example of the MRP ProcessItem PD 1 2 3 4 5Gross requirement
10 15 25 25 30
Scheduled receipts
25
Projected on hand
20 10 20 20 20 15
Net requirements
5 5 10
Planned order receipts
25 25 25
Planned order releases
25 25 25 30 25
Aggregate Production Plan
MarketingCustomerDemand
EngineeringDesign
Completion
ManagementReturn onInvestment
Capital
HumanResourcesManpowerPlanning
ProcurementSupplier
Performance
FinanceCash Flow
ProductionCapacityInventory
Inputs to the Production Plan
Production Plan
Execute MaterialPlans
Master ProductionSchedule
MaterialRequirements
Plan
CapacityRequirements
Plan
Execute CapacityPlans
Realistic??No
Yes
The Planning Process
MRP OutputsManufacturing OrdersPurchasing OrdersVarious Reports
Hubbell Lighting Case
Before MRP Implementation
Less than 75% of orders completed on time
After MRP Implementation
97% of orders completed on time2% of orders completed with 1 to 2 days after due date
Summary of MRPMRP is a…..Computerized Inventory ControlProduction Planning Systemthat…..Schedules Component Items as Neededwhich will…..Track Inventory and…..Help you in many other aspects of business