Mateo Jaramillo Global Director, Tesla Energy NASEO Annual...

25
© Copyright 2015 Tesla Motors, Inc. All rights reserved. Mateo Jaramillo – Global Director, Tesla Energy NASEO Annual Meeting 14 September 2015

Transcript of Mateo Jaramillo Global Director, Tesla Energy NASEO Annual...

Page 1: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Mateo Jaramillo – Global Director, Tesla Energy

NASEO Annual Meeting14 September 2015

Page 2: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Safe Harbor Statement

Certain statements in this presentation, including statements relating to Model S production in 2014;manufacturing in general and manufacturing and timing of stationary storage products in particular;Gigafactory timing, site location, plans and output expectations; and statements regarding futurevehicles such as Model X and Model 3 are “forward-looking statements” that are subject to risks anduncertainties. These forward-looking statements are based on management’s current expectations,and as a result of certain risks and uncertainties, actual results may differ materially from thoseprojected.

The following important factors, without limitation, could cause actual results to differ materially fromthose in the forward-looking statements: delays in the ramping of production capacity and delivery ofModel S, including the ability of suppliers to supply parts at desired quality levels and quantities;market acceptance of electric vehicles in general and new Tesla vehicle models, specifically Model Xand Model 3; delays in the manufacture and launch of Model X; problems or delays in developing thestationary storage products; problems or delays in bringing the Gigafactory online and operating it inline with expectations; Tesla’s ability to establish, maintain and strengthen the Tesla brand; Tesla’sability to execute on its manufacturing expansion as well as the risks and uncertainties identified underthe section captioned “Risk Factors” in our quarterly report on Form 10-Q filed with the SEC on August8, 2014. Except as required by law, Tesla disclaims any obligation to update information contained inthese forward-looking statements.

Page 3: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

To accelerate the world’s transition

to sustainable energy.

Mission

3

“ ,,Elon Musk | CEO

Page 4: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Corporate Overview

4

Headquarters Palo Alto, CA Tesla Factory Fremont, CA

EU Assembly Tilburg, NLDesign Studio Hawthorne, CA

2003

2006

2012

2013

Company Founded

Roadster Prototype

Roadster Introduction

IPO Raises $226MM

Purchase Tesla Factory

NA Model S Introduction

EU Model S Introduction

APAC Model S Introduction

RHD Model S Introduction

50,000+ Vehicles Delivered

Tesla Energy Introduction

2008

2010

2014

2015

Page 5: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Automotive Products

5

Page 6: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Superchargers 2015 (Tesla web site)

>500 Worldwide stations>3,000 Stalls>350MW load

Page 7: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Distributed, Connected Vehicle Fleet

7

1,000,000 Vehicles x 10kW On-Board Charger =10GW Controllable Load

2015: 70,000+ cumulative Model S sold

-5GWh of deployed energy storage

-21GW bi-directional 3-phase AC inverters

-1 Billion miles driven

Page 8: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

An Electronics and Software Culture

8

• Core focus and Tesla DNA

• Battery voltage management

• Motor Control

• Diagnostics

• Touchscreen

• Mobile App

• Traction and Stability Control

• Complete Over the Air Updates

Page 9: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Architecture

9

Cylindrical Cells

Modules

Battery Packs Products

Page 10: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Tesla Roadster

GM EV1Vo

lum

etr

ic E

ne

rgy D

en

sity [W

h/l]

600

500

400

300

200

1985 1990 1995 2000 2005

Year

2010 2015 2020

Model S

700

Model 3

Battery Energy Density Trend

800

Page 11: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

500,000

VehiclesGlobal cell supply

growing, but

almost entirely in

Asia

Battery pack cost/kWh reduced >30% for Model 3

35,000

Vehicles

GW

h/Y

ear

Pro

du

cti

on

Tesla Battery Gigafactory

Page 12: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved. 12

Gigafactory

Page 13: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Module

Cathode Manufacturing

Aluminum Foil

CathodeElectrode

AnodeElectrode

SeparatorManufacturing

Separator Winding

Ce

ll A

sse

mb

ly

Anode Manufacturing

CopperFoil

Raw

Mate

rials

Cell

Cell

Cell

Pack

Module

Module

Module

Pack

Enclosure

Vehicle Assembly and Stationary

Storage(Fremont, CA or final dest.)

Can & Cap

Battery Pack Lifetime Usage

Battery PackRecycling

Raw

Steel/Aluminum

Electrolyte Manufacturing

Gigafactory Process Flow

Page 14: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

CoCO3

Ni metalNiCoAlOH

(precursor)NiSO4

H2SO4 NaAlO2

NaOH

NiCoAlOCalcining

Li2CO3 LiOH

Chemical conversion

LiNiCoAlO2

Pulverizing

Classifying

O2

Calcining

CoSO4

smelter

Find True Materials Cost

Page 15: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Energy Products

15

70kWh and 85kWh 7kWh and 10kWh 100kWh+

Page 16: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved. 16

Page 17: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved. 17

Page 18: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved. 18

Page 19: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Scalable “Pod” Design

19

Page 20: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved. 20

Page 21: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved. 21

DC Combiner Panel

30’ – 4”

9’ – 1”

Bi-Directional PCS

(Inverter)

23’ – 11”

PowerpacksSpare Bays

(Capacity Maintenance)

Page 22: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

• Modular

• Scalable (10s of MW+)

• AC Parallel Connections

– High Reliability

– Simplified Construction

Utility Scale Projects

22

10MW / 20 MWh

Page 23: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Utility Scale Projects

23

25MW / 100 MWh

<2 acres

Page 24: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

• Storage can be a key component of an efficient, reliable,

low cost electric grid

– Projects underway now

• Should be evaluated with all option sets, considered as a

technology option for planning and funding

CPP and Storage

24

Page 25: Mateo Jaramillo Global Director, Tesla Energy NASEO Annual ...annualmeeting.naseo.org/Data/Sites/7/media/... · line with expectations; Tesla’sability to establish, maintain and

© Copyright 2015 Tesla Motors, Inc. All rights reserved.

Questions

25