Master Sched

4
Activity ID Activity Description a r u T OC PROJ RESP Early Start Early Finish 722 S.MAIN EN1368 Demo of 722 S. Main - Project on Hold 14-151337 VISCOMI 01JUL15 29AUG15 738 S.MAIN EN1288 Demo of 738 S. Main -Project on Hold 14-151335 VISCOMI 01JUL15 29AUG15 A-2 Building EN1498 Cadaver lab renovations - 15-157743 HUDICK 15JUN15 08AUG15 Bio Science EN1528 Specimen room -in design -for summer 2015 15-2059-00 HUDICK 26MAY15 03JUL15 Alumnae Hall EN1298 Replace roof & Soffett 14-138164 THAYER 11MAY15 31JUL15 Anthony-Seeger Hall EN1318 Upgrade Fire Alarms 14-146234 HUDICK 26MAY15 31JUL15 EN1338 Renovations 15-2000-18 J.COMBS 26MAY15 07AUG15 Burruss Hall EN1248 Fire Alarm Panel change out HUDICK 20JUL15 08AUG15 Carrier Library EN1268 Starbucks refresh Awaiting drawings 15-2067-00 SHANTZ 01JUN15 08AUG15 CARRIER DR EN090 Raised crosswalks Carrier Drive 14-2000-33 DERROW 26MAY15 15AUG15 CHAMPION EN310 Structural Issues- 15-2065-00 THAYER 11MAY15 06AUG15 EN320 Speed Bunps 15-2055-00 THAYER 11MAY15 18JUL15 Chandler Hall EN998 Re-grout all brick joints (Shops) 15-2043-00 THAYER 26MAY15 10JUL15 EN1918 Lakeside express renovations 15-2069-00 DERROW 01JUN15 01AUG15 EN1008 Replace carpet in 8 rooms 14-149303 VISCOMI 15JUN15 26JUN15 Chappelear Hall EN1728 Replace Ceiling 15-2037-0 J.COMBS 12MAY15 18JUL15 EN1788 room 100 build wall in all wings 15-2047-00 DERROW 12MAY15 11JUL15 Convocation Center EN237 refinish floor SHANTZ 27JUL15 01AUG15 Dingledine Hall EN1818 room 100 build wall in all wings 15-2047-00 DERROW 12MAY15 22AUG15 Weeks Demo of 722 S. Main - Project on Hold Demo of 738 S. Main -Project on Hold Cadaver lab renovations - Specimen room -in design -for summer 2015 Replace roof & Soffett Upgrade Fire Alarms Renovations Fire Alarm Panel change out Starbucks refresh Awaiting drawings Raised crosswalks Carrier Drive Structural Issues- Speed Bunps Re-grout all brick joints (Shops) Lakeside express renovations Replace carpet in 8 rooms Replace Ceiling room 100 build wall in all wings refinish floor room 100 build wall in all wings © Primavera Systems, Inc. Start Date 05JAN15 Finish Date Data Date 05JAN15 Run Date 22JUN15 13:15 Early Bar Float Bar Progress Bar Critical Activity PLAN JMU - Facilities Management JMU FM Master Project Schedule Classic Schedule Layout Sheet 1 of 4 Date Revision Checked Approved

description

hccghfh

Transcript of Master Sched

Page 1: Master Sched

Activity

ID

Activity

Description

LocationOrig

Dur

QTY LOCN PROJ RESP Early

Start

Early

Finish

722 S.MAIN

EN1368 Demo of 722 S. Main - Project on Hold 14-151337 VISCOMI 01JUL15 29AUG15

738 S.MAIN

EN1288 Demo of 738 S. Main -Project on Hold 14-151335 VISCOMI 01JUL15 29AUG15

A-2 Building

EN1498 Cadaver lab renovations - 15-157743 HUDICK 15JUN15 08AUG15

Bio Science

EN1528 Specimen room -in design -for summer 2015 15-2059-00 HUDICK 26MAY15 03JUL15

Alumnae Hall

EN1298 Replace roof & Soffett 14-138164 THAYER 11MAY15 31JUL15

Anthony-Seeger Hall

EN1318 Upgrade Fire Alarms 14-146234 HUDICK 26MAY15 31JUL15

EN1338 Renovations 15-2000-18 J.COMBS 26MAY15 07AUG15

Burruss Hall

EN1248 Fire Alarm Panel change out HUDICK 20JUL15 08AUG15

Carrier Library

EN1268 Starbucks refresh Awaiting drawings 15-2067-00 SHANTZ 01JUN15 08AUG15

CARRIER DR

EN090 Raised crosswalks Carrier Drive 14-2000-33 DERROW 26MAY15 15AUG15

CHAMPION

EN310 Structural Issues- 15-2065-00 THAYER 11MAY15 06AUG15

EN320 Speed Bunps 15-2055-00 THAYER 11MAY15 18JUL15

Chandler Hall

EN998 Re-grout all brick joints (Shops) 15-2043-00 THAYER 26MAY15 10JUL15

EN1918 Lakeside express renovations 15-2069-00 DERROW 01JUN15 01AUG15

EN1008 Replace carpet in 8 rooms 14-149303 VISCOMI 15JUN15 26JUN15

Chappelear Hall

EN1728 Replace Ceiling 15-2037-0 J.COMBS 12MAY15 18JUL15

EN1788 room 100 build wall in all wings 15-2047-00 DERROW 12MAY15 11JUL15

Convocation Center

EN237 refinish floor SHANTZ 27JUL15 01AUG15

Dingledine Hall

EN1818 room 100 build wall in all wings 15-2047-00 DERROW 12MAY15 22AUG15

Weeks

Demo of 722 S. Main - Project on Hold

Demo of 738 S. Main -Project on Hold

Cadaver lab renovations -

Specimen room -in design -for summer 2015

Replace roof & Soffett

Upgrade Fire Alarms

Renovations

Fire Alarm Panel change out

Starbucks refresh Awaiting drawings

Raised crosswalks Carrier Drive

Structural Issues-

Speed Bunps

Re-grout all brick joints (Shops)

Lakeside express renovations

Replace carpet in 8 rooms

Replace Ceiling

room 100 build wall in all wings

refinish floor

room 100 build wall in all wings

© Primavera Systems, Inc.

Start Date 05JAN15

Finish Date

Data Date 05JAN15

Run Date 22JUN15 13:15

Early Bar

Float Bar

Progress Bar

Critical Activity

PLAN

JMU - Facilities Management

JMU FM Master Project Schedule

Classic Schedule Layout

Sheet 1 of 4

Date Revision Checked Approved

Page 2: Master Sched

Sheet 2 of 4

Activity

ID

Activity

Description

LocationOrig

Dur

QTY LOCN PROJ RESP Early

Start

Early

Finish

E & G

EN198 On going side walk repairs as needed 09-2003-00 THAYER 16DEC13 06SEP14

EN238 Mis small asbestos projects as needed 14-2002-00 VISCOMI 01JAN14 29DEC14

Eagle Hall

EN728 Replace all vanitieis 15-2060-00 DERROW 11MAY15 22JUN15

EN688 Replace Roof 15-2018-00 THAYER 15JUN15 11JUL15

FARM

EN1678 Renovations to JMU Farm 15-2000-13 HUDICK 11MAY15 08AUG15

Festival

EN220 Canopy at Board of Visitors entrance 15-156039 THAYER 11MAY15 18JUL15

Forbes Center

EN200 Covered walkway 14-128603 THAYER 11MAY15 01AUG15

EN230 Paint booth 14-137529 HUDICK 11MAY15 31JUL15

Frederikson Hall

EN1798 room 100 build wall in all wings DERROW 11MAY15 05JUN15

Godwin Hall

EN1638 Repair Pool 15-258-00 SHANTZ 11MAY15 18JUL15

EN1698 repairs to Volleyball court SHANTZ 11MAY15 29MAY15

GR ROW

EN1118 Water intrusion project SHANTZ 11MAY15 11JUL15

EN1108 Floor Tile Lake A, SHANTZ 12MAY15 18JUL15

Grace Street Student Housing

EN888 Grace Street Student Housing 13-2008-04 SHORT 06MAY13 01JUL15

Hanson Hall

EN1808 room 100 build wall in all wings 15-2047-00 DERROW 12MAY15 18JUL15

Hillside Hall

EN1418 Replace floor Tile 15-2046-00 VISCOMI 12MAY15 11JUL15

EN1478 Total Paint JENKINS 12MAY15 31JUL15

EN1488 Replace boiler & Coils 15-2046-00 VISCOMI 12MAY15 01AUG15

Huffman Hall

EN1738 Replace ceiling 15-2037-00 J.COMBS 12MAY15 18JUL15

Ikenberry Hall

EN1748 Install Hand Dryers 15-2036-00 J.COMBS 12MAY15 11JUL15

Johnston Hall

EN1648 Repair water intrusion into basement 14-146200 THAYER 18MAY15 10JUL15

LAKEVIEW

EN1658 Renovations to Lakeview 14-143592 J.COMBS 03NOV14 13JUN15

Memorial Hall

EN1168 Repair roof 14-146204 THAYER 26MAY15 30JUN15

EN1178 Cover stages at amphtheater BAKER 22JUN15 26JUN15

Weeks

On going side walk repairs as needed

Mis small asbestos projects as needed

Replace all vanitieis

Replace Roof

Renovations to JMU Farm

Canopy at Board of Visitors entrance

Covered walkway

Paint booth

room 100 build wall in all wings

Repair Pool

repairs to Volleyball court

Water intrusion project

Floor Tile Lake A,

Grace Street Student Housing

room 100 build wall in all wings

Replace floor Tile

Total Paint

Replace boiler & Coils

Replace ceiling

Install Hand Dryers

Repair water intrusion into basement

Renovations to Lakeview

Repair roof

Cover stages at amphtheater

Sheet 2 of 4

Page 3: Master Sched

Sheet 3 of 4

Activity

ID

Activity

Description

LocationOrig

Dur

QTY LOCN PROJ RESP Early

Start

Early

Finish

EN1278 refinish Gym floor 15-158786 SHANTZ 25JUN15 03JUL15

Music Building

EN698 Replace roof 1272 THAYER 26MAY15 30JUN15

NORTH CAMP

EN898 Steam line connection - NANCY C 17NOV14 15AUG15

Rockingham Hall

EN1878 Rockingham parking lot 15-2008-06 THAYER 11MAY15 15AUG15

EN1888 Rockingham demo 15-2061-00 VISCOMI 11MAY15 13JUN15

Rose Library

EN1958 room 2300 renovate 15-2062-00 SHANTZ 26MAY15 30JUN15

Spotswood Hall

EN1708 Replace fire Alarms 15-2019-00 HUDICK 11MAY15 25JUL15

EN1948 Upgrade steam radiators HART 11MAY15 25JUL15

EN1778 Install wi-fi J.COMBS 12MAY15 31JUL15

EN1688 replace windows- 14-2049-00 THAYER 01JUN15 17JUL15

Taylor Hall

EN908 Auntie Annes 15-2068-00 HUDICK 26MAY15 02AUG15

University Farm

EN1668 Renovations to Farm 14-153283 HUDICK 04MAY15 01OCT15

University Recreation Center

EN868 UREC Expansion -phase I -in planning 12-2081-00 G.WAY 05MAY14 16JUL16

EN918 Dock Lift 15-161324 SHANTZ 11MAY15 05JUN15

EN928 3rd Floor Lift 14-137164 SHANTZ 11MAY15 05JUN15

EN938 Office renovations 15-2026-00 J.COMBS 11MAY15 20JUN15

Village Halls

EN1458 Village Quad rooms 14-2047-00 DERROW 11MAY15 01AUG15

EN1468 renovate 4 HD appts 15-2049-00 HUDICK 11MAY15 18JUL15

Walnut Lane

EN1378 New Student Housing 216-17949 R.MILLER 16DEC13 04AUG15

Wampler Hall

EN1408 Network Install TELECOM 11MAY15 05JUN15

Warren Hall

EN1238 Post office/bank Renovations 15-2001-02 J.COMBS 15JAN15 15AUG15

Weaver Hall

EN1438 Replace ceiling 15-2035-00 VISCOMI 11MAY15 03JUL15

EN1828 room 100 build wall in all wings 15-2047-00 DERROW 12MAY15 24JUL15

White Hall

EN1428 C302/C303 Bathroom ceiling 14-144880 VISCOMI 07MAR15 14MAR15

EN1928 Network Install 15-158866 J.COMBS 11MAY15 08AUG15

EN1758 Install Hand Dryers 15-2036-00 J.COMBS 12MAY15 18JUL15

Weeks

refinish Gym floor

Replace roof

Steam line connection -

Rockingham parking lot

Rockingham demo

room 2300 renovate

Replace fire Alarms

Upgrade steam radiators

Install wi-fi

replace windows-

Auntie Annes

Renovations to Farm

UREC Expansion -phase I -in planning

Dock Lift

3rd Floor Lift

Office renovations

Village Quad rooms

renovate 4 HD appts

New Student Housing

Network Install

Post office/bank Renovations

Replace ceiling

room 100 build wall in all wings

C302/C303 Bathroom ceiling

Network Install

Install Hand Dryers

Sheet 3 of 4

Page 4: Master Sched

Sheet 4 of 4

Activity

ID

Activity

Description

LocationOrig

Dur

QTY LOCN PROJ RESP Early

Start

Early

Finish

Wine-Price Hall

EN1388 Install carpet in basement BAKER 08JUL15 09JUL15

Weeks

Install carpet in basement

Sheet 4 of 4