Master Plan
Implementation Team Enhancing the Student Experience
9/29/2014
![Page 2: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/2.jpg)
Today’s Meeting
• Inform
• Establish a mindset
• Homework
![Page 3: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/3.jpg)
Key Goals of Enhancing the Student Experience
Increasing Campus
MobilityRedistributing Parking
Strengthening Identity Transforming the
Academic Environment
Defining Campus
Gateways
Improving CirculationImproving Pedestrian
Connectivity
Enriching the Outdoor
Experience
![Page 4: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/4.jpg)
PROJECTS
![Page 5: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/5.jpg)
![Page 6: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/6.jpg)
![Page 7: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/7.jpg)
![Page 8: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/8.jpg)
![Page 9: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/9.jpg)
![Page 10: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/10.jpg)
Moving Forward – Spring Construction
![Page 11: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/11.jpg)
![Page 12: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/12.jpg)
![Page 13: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/13.jpg)
![Page 14: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/14.jpg)
![Page 15: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/15.jpg)
![Page 16: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/16.jpg)
![Page 17: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/17.jpg)
![Page 18: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/18.jpg)
![Page 19: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/19.jpg)
![Page 20: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/20.jpg)
Phase 1
1.Thompson Hall Recladding
2.Corbin-Olson Renovation
3.Wetzel Hall Demolition
4.Currens & Horrabin – Science Lab Renovation
5.Heating Plant Annex – 3D Classroom Renovation
6.Lincoln Hall – Bathroom and Room Renovation
7.Malpass Library – Decorative Wall Renovation
![Page 21: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/21.jpg)
8. Alumni House – Sign Wall
9. Heating Plant & Steam Line Upgrades
10. Center for Performing Arts
11. Stipes Hall Renovation
12. Wetzel Park
13. Sherman Hall – Bell Tower Restoration
14. University Drive Campus Entry
Phase 1
![Page 22: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/22.jpg)
Phase 1
15. University Union Renovation – Phase 1
16. Adams Street Gateways –Western & Charles
17. Enhance Legacy Walk
18. Adams Street and Western Avenue (CPA) Parking Lot
19. Varsity Plaza – McKee Field to Western Hall
![Page 23: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/23.jpg)
Phase 21.Visitors Center
2.Center for Performing Arts Courtyard
3.Currens Hall Renovation
4.Science Building Expansion
5.Western Avenue Enhancement
6.Varsity Plaza (Hanson Field to Western Hall / Q-Lot.
7.Hanson Field West Side Renovation.
![Page 24: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/24.jpg)
Phase 2
8. Hanson Field Scoreboard
9. Remove North Lot – Establish
Valley of Purple
10.Union Renovation – Phase 2
11.Mixed Use Parking Structure
12.Murray Street Enhancements
13.Sherman Hall Parking Lot
Renovations
![Page 25: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/25.jpg)
![Page 26: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/26.jpg)
![Page 27: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/27.jpg)
![Page 28: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/28.jpg)
![Page 29: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/29.jpg)
![Page 30: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/30.jpg)
![Page 31: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/31.jpg)
![Page 32: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/32.jpg)
![Page 33: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/33.jpg)
![Page 34: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/34.jpg)
![Page 35: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/35.jpg)
FCA information
• Received the assessment week of
9/22/2014
• Still reviewing the information
• Initial report - $336,025,000 in Deferred
Maintenance
![Page 36: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/36.jpg)
![Page 37: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/37.jpg)
FCA information
• Received the assessment week of
9/22/2014
• Still reviewing the information
![Page 38: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/38.jpg)
Renovation Matrix – 3.0
1 2 3 4 5 6 7 8 9 9
Numbers 1 - 5 (1 being the lowest need and 5 being the highest need)
Facilites
Condition
Assessment
Factor
Other
2.0 WT 3.0 WT 1.0 WT 2.0 WT 3.0 WT 2.0 WT 2.0 WT 3.0 WT 2.0 WT 2.0 WT
Waggoner Hall Academic 131,900 1968 5 10 3 9 1 1 2 4 4 12 5 10 3 6 4 12 1 2 1 2DMF = 2 (critical in
FCA) 68
Horrabin Hall Academic 148,700 1967 4 8 2 6 2 2 4 8 3 9 4 8 4 8 3 9 1 2 1 2DMF = 2 (critical in
FCA)62
Stipes Hall Academic 142,600 1970 5 10 2 6 1 1 3 6 4 12 5 10 4 8 3 9 1 2 1 2 66
University Union Student Center 183,683 1956 5 10 3 9 3 3 5 10 3 9 5 10 5 10 2 6 1 2 1 2 71
Tillman Hall Academic 88,400 1953 0 0 0 0 0 0 0 0 0 0 `` 0
Currens Hall Academic 142,172 1970 0 0 0 0 0 0 0 0 0 0 0
Sallee Hall Academic 53,000 1964 0 0 0 0 0 0 0 0 0 0 0
Sherman HallAdministration 107,100 1902 0 0 0 0 0 0 0 0 0 0
National Historic
Register 0
Morgan Hall Academic 118,300 1967 0 0 0 0 0 0 0 0 0 0 0
Browne Hall Academic 70,200 1959 0 0 0 0 0 0 0 0 0 0 0
Western Hall Athletic Bldg. 102,090 1964 0 0 0 0 0 0 0 0 0 0 0
Knoblauch Hall Classroom 93,500 1964 0 0 0 0 0 0 0 0 0 0 0
Beu Health Center Health Center 15,300 1963 0 0 0 0 0 0 0 0 0 0 0
Malpass Library Library 222,300 1978 0 0 0 0 0 0 0 0 0 0 0
Art Gallery Academic 7,086 1902 0 0 0 0 0 0 0 0 0 0 0
Spencer Recreation Center Student Rec 59,125 1997 0 0 0 0 0 0 0 0 0 0 0
Seal Hall Administration 35,500 1955 0 0 0 0 0 0 0 0 0 0 0
Brophy Hall Academic 107,500 1973 0 0 0 0 0 0 0 0 0 0 0
Garwood Hall Academic 25,900 1914 0 0 0 0 0 0 0 0 0 0 0
Memorial Hall Academic 83,500 1962 0 0 0 0 0 0 0 0 0 0 0
Simpkins Hall Academic 110,600 1937 0 0 0 0 0 0 0 0 0 0 0
Multicultural Center Administration 21,926 2009 0 0 0 0 0 0 0 0 0 0 0
STRATEGIC RENOVATION CRITERION
Building Building Type
Gross
SQFT
Year
Occupied
Utilization by
Students and
Faculty
Life Safety
and ADA
Compliance
Needs
Building
Exterior
needs (Roof,
Brick, Curtain
wall, glazing
etc)
Faculty, Staff
and Student
Needs
Fundable
(State
Funding or
Corporate
Partnerships)
Master Plan
Factor
Deferred
Maintenance
Needs (MEP,
HVAC)
Comments
Visibility to
Campus,
Community,
and
Perspective
Students
Strategic
Renovation
Factor out of
110 possible
points
STRATEGIC BUILDING RENOVATION MATRIX -
V 3.0
![Page 39: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/39.jpg)
Active Learning
• Info from Ratio Architects regarding
space costs
–Minor construction - $35,000
–Equip & Tech - $29,000
–Furniture - $24,000
–Total- $88,000
![Page 40: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/40.jpg)
![Page 41: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/41.jpg)
Active Learning – Stipes 217
• $1500 70" Vizio Smart-TV
• $125 Wall-mount with full tilt/swivel
• $600 Wire drop for 2nd Ethernet port
• $750 Access point
• $50 Miscellaneous cables (HDMI, VGA, etc.)
• Roughly $3025 – Departmental Equipment.
• FM Painted, installed new ceiling tile, replaced
select floor tile, installed wiremold to hide cabling –
• FM total $3,130
• Room Total - $6,155.
![Page 42: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/42.jpg)
![Page 43: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/43.jpg)
Historical Markers
![Page 44: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/44.jpg)
Historical Markers
![Page 45: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/45.jpg)
TACTICAL RENOVATIONS- 2014
![Page 46: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/46.jpg)
![Page 47: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/47.jpg)
![Page 48: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/48.jpg)
![Page 49: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/49.jpg)
![Page 50: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/50.jpg)
![Page 51: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/51.jpg)
![Page 52: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/52.jpg)
![Page 53: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/53.jpg)
![Page 54: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/54.jpg)
![Page 55: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/55.jpg)
![Page 56: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/56.jpg)
![Page 57: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/57.jpg)
![Page 58: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/58.jpg)
![Page 59: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/59.jpg)
![Page 60: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/60.jpg)
![Page 61: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/61.jpg)
![Page 62: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/62.jpg)
![Page 63: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/63.jpg)
![Page 64: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/64.jpg)
YOUR TOPIC GOES HERE
• Your Subtopics Go Here
![Page 65: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/65.jpg)
![Page 66: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/66.jpg)
Summary – 2014 Tactical
• 15 classrooms painted
• 71 Plexiglas entrances replaced
• Masonry work on Garwood, Sherman, Art
Gallery, Tillman, and Simpkins Hall
• Toilet Partitions in Morgan Hall
• 3500 square feet of floor tile.
• Currens Lobby ceiling tile, rubber base,
painting, etc.
• Entrance matting in Stipes and Currens
![Page 67: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/67.jpg)
Summary
• Elevator floors in Garwood, Morgan,
Knoblauch
• Mismatched door entry hardware.
• 16 stainless steel handrails
• 6 rooms of new ceiling tile in Stipes, and in
the corridors
• Demolished stairs leading to nowhere.
• Of the $200,000 allocated, less than $400
was left over.
![Page 68: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/68.jpg)
![Page 69: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/69.jpg)
Departmental lists/Homework
• Received several lists last spring and
summer.
• Will be returning the lists asap with
comments – Finished, complete,
reasons not complete, etc.
• Homework – Keep the ideas coming
• Questions regarding Active Learning
Classroom furnishings.
![Page 70: Master Plan Implementation Team · 2014. 11. 3. · Implementation Team Enhancing the Student Experience 9/29/2014. Today’s Meeting •Inform ... 5.Heating Plant Annex –3D Classroom](https://reader036.fdocuments.in/reader036/viewer/2022071611/614ada9912c9616cbc69af5b/html5/thumbnails/70.jpg)
Questions?
Thank you – Next meeting 2nd full
week in November.