Master Civil Engineering Services
RFQ # AVIA 21-13
Pre-Proposal Meeting
October 8th, 2020 at 3:00 PM (EST)
• Introductions and Attendance
• SOQ Submission
• SOQ Format
• Addenda and Written Questions
AGENDA OVERVIEW
• DBE and CBI Programs
• Scope of Work
• Program Preclusions
• Review and Questions
• Presenters:
Dominique Mitchell – RFQ Manager
Ashton Watson – Airport Engineer
Michele Torres – Business Diversity Programs Manager
• Sign-In Sheet – Electronic Sign-In Sheet via Webex
- Submit your Company Info as a question through Ebuilder
INTRODUCTIONS
• Submit one (1) electronic copy via Ebuilder Ebidding Portal
• SOQ due date and time is follows:
o October 29, 2020 at 2:00 PM EST
• Location for electronic submission:
https://bidders.e-builder.net/landing?bidpackageid=9a772a95-b000-4bae-8645-
06e8100ff97f
SOQ SUBMISSION
Required Documentation (Section III of RFQ document)
• Cover Page
• Cover Letter
• Description of how firm meets each of the Selection Criteria
• Form 3 – DBE/MWSBE form
• Commercial Non-Discrimination Certification
Note: All required forms must be completed and signed
SOQ FORMAT
• All Addenda will be posted in the same place as the original solicitation (Ebuilder, City of
Charlotte, NCIPS)
• Questions must be addressed in written form to the following:
https://bidders.e-builder.net/landing?bidpackageid=9a772a95-b000-4bae-8645-06e8100ff97f
• Questions and Answers to be included in addenda for benefit of all proposers. Please submit all
questions asked in the pre-proposal meeting by 5:00 pm on Tuesday, October 12, 2020, for
questions to be addressed within the Second Addendum.
• Deadline for submitting written questions for each RFQ will be close of business (5:00 PM
EST) on Thursday, October 22, 2020
ADDENDA AND WRITTEN QUESTIONS
• Will contain either a DBE or MWSBE goal (depending on source of funding) on each
task of work assigned
• DBE/CBI combined Form 3- Must be submitted filled out and signed
• Form 3 should list a mix of MWSBE and DBE firms that you intend to utilize on your
contract
• New CBI Program changes require non-federal tasks to be evaluated for an
MBE and/or WBE goal first. If no firms are available then an SBE goal will be
set.
DBE and CBI Programs
DBE and CBI Form 3
• For a list of DBE firms:
https://www.ebs.nc.gov/VendorDirectory/search.html?s=fn&a=new
• For a list of MWSBE firms:
http://charlotte.diversitycompliance.com
Contact: Michele Torres [email protected] or Alexis Kondratyk
Where to find DBE and MWSBE firms
• Task Order Based (umbrella contract with POs)
• 5-year duration with two 1-year renewals
• Up to 30% Design
SCOPE OF WORK
• Existing Conditions, Inventories or Condition Assessments
• Project Scoping and Project Program Definition Studies or
Validations
• Conceptual/Schematic Design Studies, Design Reviews,
Design Value Engineering, Design Maintainability and Design
Constructability Reviews
• Application and Permit Preparation
• Alternative Project Delivery Methods Evaluations
• Safety and Security Studies and Procedures
• E-Information Support
SCOPE OF WORK –
Proposed Master Civil Scope/Projects
1. New Fourth Parallel Runway
2. South Ramp Expansion
3. South End Around Taxiway (SEAT)
4. West Boulevard Relocation
5. Campus Stormwater
6. Campus Mass Grading Analysis
7. South Airfield and Support Facilities Plan
8. Corporate Aviation Development
9. Runway 18L Reconstruction
10. Preliminary Soil/Site Investigations
11. North End Around Taxiway – Phase 2
Other projects as assigned that interface or relate to above projects or related infrastructure. Coordination with other
ongoing airfield and terminal design and construction activities
a. North End Around Taxiway (NEAT)
b. Concourse A Phase 2 and West Ramp
c. South Crossfield Taxiway (SCF)
d. Concourse D/E Dual Taxi Lanes, etc.
e. Runway 5/23 Decommissioning
SCOPE OF WORK –
Prime = Contract Holder (if a single entity) or Majority Partner (Joint Venture)
Subconsultant (Sub) = Non-Prime entity of a team
• In order to minimize potential conflicts of interest, the guidelines on the following slides have been developed.
• These guidelines will apply to this procurement as well as additional future designer, PM and CM/RPR procurements.
• CLT reserves the right to identify additional potential conflicts and preclude firms, as appropriate.
Program Preclusions
Program Preclusions: Master Civil Prime(s)
Cannot be part of:
• Any Design Team doing work on any project within the scope of the Master Civil Engineering Services.
• The PM team.
May be part of:
• The CM/RPR team.
Program Preclusions: Master Civil Subconsultants
Cannot be part of:
• The PM team
May be part of:
• Other Program Teams
Program Preclusions – Prime(s)
Cannot be part of:
• Master Civil Engineering Services Team
• CM/RPR Team
• Any Design Team as PRIME*
• Any Construction Team
*May be part of:
• Specialty subconsultant design work with prior CLT approval on projects they do not provide PM Services.
PM PRIME(S)
Currently TYLin International Group;
Exp. Aug. 2021.
Cannot be part of:
• PM Team
• Any Design Team as PRIME*
• Any Construction Team
*May be part of:
• Specialty subconsultant design work with prior CLT approval.
CM/RPR PRIME(S)
Currently Talbert, Bright & Ellington,
Inc. ; Exp. Aug. 2021.
Cannot be part of:
• Master Civil Engineering Services Team
• PM Team
• Any Design Team
• Any CM/RPR Team
• Any Construction Team
PROGRAM ADVISORY
SERVICES PRIME(S)
Currently Anser Advisory Services,
LLC; Exp. Dec. 2024.
Program Preclusions – Subconsultants
Cannot be part of:
• PM team subs cannot be part of any other teams.
• Subs can not work as CM/RPR on any project they worked on as part of a final design team.
May be part of:
• Master Civil Engineering Subconsultants can be part of other program teams.
• CM/RPR subs can be part of other teams other than the PM team.
• Program Advisory Services subs can be part of other teams except the PM.
• Designer team subs can work on any other team except the PM team. However, subs cannot work as the CM/RPR on a project they design.
Program Preclusions – Summary
PRIME SUB PRIME SUB PRIME SUB PRIME SUB PRIME SUB
PRIME N N N N N Y* N Y*
SUB N N N N N Y* N Y*
PRIME N N Y Y N N N N
SUB N N Y Y Y Y Y Y
PRIME N N N Y N Y** Y Y
SUB Y* N N Y Y** Y** Y Y
PRIME N N Y Y N Y** N Y**
SUB N N Y Y Y** Y** Y** Y**
Y Eligible to Pursue
Y* Owner Pre-Approved Specialty Service
Y** Precluded from doing RPR, if on EOR Team
N Conflicted
Row is the
Future
Preclusion
Column is the Role You Win
PMSS
MASTER CIVIL ENG
4TH RUNWAY EOR
RPR INSPECTION (TBE)
PMSS MASTER CIVIL ENGINEER 4TH RUNWAY EORSOUTH APRON & OTHER FUTURE
MAJOR AIRFIELD PROJECTS EORRPR INSPECTION
EBUILDER PORTAL – SUBMITTING A QUESTION
EBUILDER PORTAL – SUBMITTING A PROPOSAL
EBUILDER PORTAL – SUBMITTING A PROPOSAL
Additional Questions and Comments