MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models, based on GPS and strong motion data Alessio Piatanesi [email protected]

Transcript of MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of...

Page 1: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

MARsite kickoff meetingDecember 19-20, 2012, Istanbul

WP5 - TASK 2Near real-time determination of the earthquake

finite-fault source parameters and models,based on GPS and strong motion data

Alessio [email protected]

Page 2: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

Partners involved

INGV, KOERI, GFZ, BRGM, IU

Relevant deliverables

D5.3 - Performance assessment of finite-fault inversioncodes in the Marmara configurationDelivery date: 30

D5.4 - Near real-time estimation of most relevantearthquake source parametersDelivery date: 30

Page 3: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

-“Analyzing geodetic and seismic data together using a Kalman filter will provide precise and true broadband record of displacements across the entire frequency range, including the static component. These analyses can be done in near real time and are particularly suited for capturing near-source large Earthquakes.”Partners involved: ?

Main topics (as in the DoW): 1

- “In order to improve rapid ground-motion simulations in case of large earthquakes in the Marmara region, a new tool for rapid reconstruction of the rupture process of large earthquakes using near-field strong-motion and high-rate GPS data will be developed.”Partners involved: ?

Page 4: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

- “The array-seismological method will be extended by taking into

account empirical or synthetic Green’s functions. Aim of such

method will be providing a fast and reliable estimation of most

relevant source parameters (e.g. moment magnitude, fault size,

rupture duration, slip centroid)…”

Partners involved: ?

Main topics (as in the DoW): 2

Page 5: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

-“Two finite-fault inversion programs will be developed, tested and

compared. The first code implements a linear technique to invert

strong motion and GPS data: it is very fast and produces a model

of the earthquake rupture process in term of heterogeneous slip

distribution, uniform rise time and constant rupture velocity.”

Partners involved: INGV, …?

Main topics (as in the DoW): 3

- “The second code is based on a simulated annealing technique:

it is slower than the former, but it may handle very complicated

rupture model with heterogeneous slip, rise time and rupture

velocity, other than several kind of source time function.”

Partners involved: INGV, …?

Page 6: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

The performance of the above codes will be assessed in term of

accuracy of the solution and quickness of the execution run

through several synthetic tests, specifically designed for the

Marmara Sea tectonic setting and observational network.

Partners involved: INGV, …?

Main topics (as in the DoW): 4

Page 7: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

Coordination and Management: 1

I would like to propose to all partners a task sheet to fill.The task sheet will contain the following information:

1) Name of the institution, contact person, participants.

2) For each contribution to the task:

-Title of the contribution -Short description (200-300 words) of the work (already done, planned in the short, mid and/or long-term).

-Problems/gaps that, in your opinion, may be faced/filled more easily by other partners.

- Row estimation of the delivery date of results.

- Planned or potential collaboration with other partners

Page 8: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

- I will send a template of the task sheet to all partners.

Coordination and Management: 2

- I will collect the task sheets sent back by each partner and merge the contributions into a single document.

- To come out potential interactions and/or collaborations,I will try to put together or link contributions that may take advantage by a cooperative effort:

- similar/complementary numerical techniques- sharing of data input- common case study

- strength of a partner in facing a particular problem

- I will distribute this document to all partners.

Page 9: MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,

Schedule for task sheet:

- Send the task sheet template to partners: beginning of January

- Send back to me the task sheets: end of January

- Merging the contributions and distributing to all partners: mid of February

Coordination and Management: 3