19
EFFICIENCY IMPROVEMENT THROUGH ME METHODOLOGY Style: FG36T380 Buyer: Walmart Line: 01 Unit: Unit-2

Transcript of Manufacturing Excellence Line- Efficiency Improvement Project

EFFICIENCY IMPROVEMENT THROUGH

ME METHODOLOGY

Style: FG36T380Buyer: WalmartLine: 01Unit: Unit-2

DEFINE

DEFINE

Training & Development• Training with Line chief, Supervisor& Line IE about ME Methodology .• After that completed simulation exercise

MEASURE

MEASURE…CONT IN UE

Category Current TargetEfficiency 76% 91%Production 1000 pcs 1200 pcsPeople Ratio 77:5:18 79:5:16SMV 24.3 23.3Line Balancing 74% 86%

Category Attachment

Base data

Current OB

Process flow chart

People Ratio

Capacity Graph

Lay out

Base data

Current OB

People Ratio

Capacity Graph

Process flow chart

MEASURE…CONT INUE

Lay out

ANALYSIS

IMPROVE

Benefits:

Line 1 & 2 both line production increase 200 pcs production increase 17% efficiency improved

Benefits:

12% balancing efficiency improved

1. Method analysis

2. Line balancing analysis

LINE BALANCING

Before

After

IMPLEMENT

Line Balancing

Category Before After

Line

Balancing

74% 86%

METHOD IMPROVEMENT…….

Cuff Turn

Before

After

METHOD IMPROVEMENT…….

Cuff Press

Before After

METHOD IMPROVEMENT…

Cuff Attach Category Before Method Improve

After Method Improve

Capacity 48 pcs 59 pcsCycle time 62 sec 51 sec

Result 110 pcs/day increase

METHOD IMPROVEMENT…

Box & cross stitch

Category Before Method Improve

After Method Improve

Capacity 90 pcs 125 pcsCycle time 33 sec 24 sec

Result 350 pcs/day increase

METHOD IMPROVEMENT…

Att. sleeve tap 2 gamble

Category Before Method Improve

After Method Improve

Capacity 111 pcs 130 pcsCycle time 27 sec 23 sec

Result 190 pcs/day increase

METHOD IMPROVEMENT…….

Sticker Remove

METHOD IMPROVEMENT

ACHIEVEMENT

Production