MANTELLI DRIVE - ci.gilroy.ca.us
Transcript of MANTELLI DRIVE - ci.gilroy.ca.us
UP
A/C A/C
UP
A/CA/C
A/CA/C
A/C A/C
A/C
A/C
A/C
A/C
A/CA/C
A/C A/C
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
A
/
C
A
/
C
A/C
A/C
A
/
C
A
/
C
A/C
A/C
UP
A/C
A/C
A/C
A/C
A/C
A/C
PARCEL ACOMMON
OPENSPACEK
ERN
AV
ENU
E(P
UB
LIC
STR
EET)
ST. CLAR AVENUE(PUBLIC STREET)
1
4
5
2
3
6
29
9
24
22
16151413
28 27 2625
23
21
20
19
18
17
12
7 8
10
11
PARCEL B
WIC
KH
AM
CO
UR
T(P
RIV
ATE
STR
EET)
BARTON WAY(PRIVATE STREET)
WICKHAM COURT(PRIVATE)
KERN
AVE
NU
E
WRE
N A
VEN
UETATUM AVENUE
MANTELLI DRIVE
CITY OF GILROY LIMITS
PROJECTSITE
VESTING TENTATIVE MAPTHE COTTAGES AT KERNGILROY, CALIFORNIA
PROJECT TEAM
OWNERS:CRC KERN INVESTORS, LLC.ST FRANCIS INVESTMENT III
APPLICANT:D.R. HORTON6683 OWENS DRIVE PLEASANTON, CA 94588CONTACT: CHRIS ZABALLOS(510) 506-3750, [email protected]
CIVIL ENGINEER & PLANNER:RUGGERI-JENSEN-AZAR8055 CAMINO ARROYO, GILROY CA 95020CONTACT ENGINEER: JIM SCHUL, P.E. RCE#CONTACT PLANNER: ROSS DOYLE(408) 848-0300, [email protected] & [email protected]
VICINITY MAPPROJECT INFORMATION 1. ASSESSOR'S PARCEL NUMBER: 790-17-002 & 790-17-0032. ADDRESS: 9130 & 9160 KERN AVENUE, GILROY3. PROJECT DESCRIPTION: RESIDENTIAL SUBDIVISION CONSISTING OF 29 SINGLE-FAMILY
HOMES WITH ASSOCIATED ONSITE IMPROVEMENTS.4. PRESENT LAND USE: VACANT5. EXISTING GENERAL PLAN: MEDIUM DENSITY RESIDENTIAL6. EXISTING ZONING DISTRICT: R3-PUD7. PROPOSED ZONING DISTRICT: R3-PUD8. GROSS SITE AREA: ±3.73 AC9. NET SITE AREA: ±2.91 AC10. BUILDING AREA:
29 SINGLE-FAMILY LOTS ±2.79 ACPRIVATE STREETS (BARTON WAY & WICKHAM COURT) ±0.49 ACWICKHAM COURT (PARCEL B) ±0.09 ACPUBLIC STREET (KERN AVENUE) ±0.24 ACPARCEL A - COMMON OPEN SPACE ±0.12 ACTOTAL ±3.73 AC
11. NET DENSITY: 9.97 DU/AC12. BUILDING COVERAGE: ±34,679 SF (±21.3%)13. LANDSCAPE COVERAGE: ±71,722 SF (±44.0%)14. PARKING & DRIVE AISLES COVERAGE: ±21,121 SF (±12.9%)15. HARDSCAPE COVERAGE: ±35,656 SF (±21.9%)16. UTILITIES:
WATER CITY OF GILROYGAS & ELECTRIC PACIFIC GAS & ELECTRICSANITARY SEWER H.O.A.STORM DRAIN H.O.A.TELEPHONE VERIZONCABLE CHARTER COMMUNICATIONS
17. THE PROJECT LIES WITHIN FLOOD ZONE X - OTHER FLOOD AREA DEFINED AS AREASOF 0.2% ANNUAL CHANCE FLOOD; AREA OF 1% ANNUAL CHANCE FLOOD WITHAVERAGE DEPTHS OF LESS THAN 1 FOOT OR WITH DRAINAGE AREAS LESS THAN 1SQUARE MILE; AND AREAS PROTECTED BY LEVEES FROM 1% ANNUAL CHANCE FLOOD(FIRM MAP 06085C0639H, EFFECTIVE DATE MAY 18, 2009).
18. THE EXISTING TOPOGRAPHY AS SHOWN IS BASED ON AN AERIAL SURVEY DATEDMARCH 16, 2020 PREPARED BY RADMAN. THE CONTOURS SHOWN ON THIS PLANREPRESENT GROUND ELEVATIONS AS DETERMINED AT THE TIME OF SAID SURVEY.
19. PARCEL A, STREET LANDSCAPING, AND PARCEL B (WICKHAM COURT) WITHIN THEPROJECT DEVELOPMENT AREA WILL BE OWNED AND MAINTAINED BY A HOMEOWNERASSOCIATION OR A SIMILAR ENTITY.
GENERAL NOTES1. THE PROPOSED STREET NAMES DEPICTED HEREIN ARE PRELIMINARY AND
SUBJECT TO CHANGE.
2. FLOOR PLANS ARE CONCEPTUAL IN NATURE AND ARE SUBJECT TO CHANGE.
3. LOT NUMBERS ARE FOR IDENTIFICATION ONLY AND ARE NOT INTENDED ASFINAL.
4. CERTIFICATION OF GRADES AND SOIL COMPACTION REQUIRED PRIOR TOBUILDING PERMIT FINAL.
5. ALL FUTURE BUILDINGS SHALL BE SPRINKLERED FOR FIRE SAFETY PER THECITY OF GILROY FIRE AND BUILDING DEPARTMENT STANDARDS.
6. ALL RETAINING WALLS (IF REQUIRED) SHALL BE MASONRY AND SHALL BE AMODULAR SYSTEM AND/OR CAST IN PLACE CONCRETE WITH A DECORATIVESURFACING. ALL SITE RETAINING WALLS ARE SUBJECT TO THE REVIEW ANDAPPROVAL OF THE PLANNING, BUILDING, AND ENGINEERING DIVISIONS. WOODWALLS SHALL NOT BE PERMITTED.
7. PROPOSED PIPE SIZES, SLOPES, AND ELEVATIONS ARE PRELIMINARY ANDSUBJECT TO REFINEMENT DURING FINAL DESIGN.
8. ALL WORK IS TO BE DONE IN COMPLIANCE WITH THE CITY OF GILROYSPECIFICATION STANDARDS AND DESIGN CRITERIA AND IS SUBJECT TO ALLLAWS OF THIS COMMUNITY BY REFERENCE.
9. TRANSFORMERS AND SPLICE BOXES SHALL BE UNDERGROUND.
10. CERTIFICATION OF IMPROVEMENTS ON SITE PLANS IS REQUIRED PRIOR TOBUILDING FINAL.
11. ALL GRADING WILL BE DONE IN CONFORMANCE WITH THE RECOMMENDATIONSAND CONDITIONS OF THE GEOTECHNICAL ENGINEER'S REPORTS REGARDINGTHIS PROJECT.
12. PROPOSED GRADES AS SHOWN ARE PRELIMINARY. FINAL GRADES ARE SUBJECTTO FINAL DESIGN.
13. ALL EROSION CONTROL MEASURES SHALL BE IN CONFORMANCE WITH THECRITERIA AND STANDARDS OF THE CITY OF GILROY.
14. GRADING, SURFACE IMPROVEMENTS, AND UTILITIES ARE CONCEPTUAL ANDARE SUBJECT TO REVISION AND CITY APPROVAL DURING FINAL DESIGN.
15. IF THE PROJECT HAS EXCESS FILL OR CUT THAT WILL BE ON OR OFF-HAULED TOA SITE WITHIN THE CITY LIMITS OF GILROY, AN ADDITIONAL PERMIT ISREQUIRED.
16. ALL UTILITIES LOCATED WITHIN BARTON WAY, WICKHAM COURT, AND PARCELB (WICKHAM COURT) ARE PRIVATELY OWNED AND MAINTAINED.
17. ALL VEGETATION WITHIN PROJECT BOUNDARY TO BE REMOVED EXCEPT TREESNOTED TO REMAIN ON AS&PUD-02.
TITL
E SH
EET
VTM-01
W:\J
OB
S 20
\202
016
- KER
N A
ND
ST
CLA
R\D
RA
WIN
GS\
PREL
IM\A
PPLI
CA
TIO
NS\
VTM
\VTM
-01
TITL
E SH
EET.
DW
G
PROPOSED
LEGEND
DESCRIPTION EXISTING
PROPERTY LINE
EASEMENT
FACE OF CURB
STORM DRAIN
WATER
MANHOLE
SIDEWALK
SANITARY SEWER
FIRE HYDRANT
STORM DRAIN FIELD INLET
STORM DRAIN CURB INLET
UNDERGROUND RETENTION FACILITY
BOUNDARY
ELECTROLIER
SD
SS
W
VES
TIN
G T
ENTA
TIV
E M
AP
THE
CO
TTA
TGES
AT
KER
NG
ILR
OY
, C
ALI
FOR
NIA
FOR
: D. R
. HO
RTO
N
SHEET INDEXSHEET NUMBER SHEET TITLE
VTM-01 TITLE SHEETVTM-02 EXISTING CONDITIONSVTM-03 SITE PLANVTM-04 PRELIMINARY GRADING PLANVTM-05 PRELIMINARY UTILITY PLANVTM-06 PRELIMINARY SWC PLAN
I, JIM SCHUL, CERTIFY THAT THIS VESTING TENTATIVE MAP WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION ANDTHAT IT COMPLIES WITH THE CITY OF GILROY SUBDIVISION ORDINANCE AND THE STATE MAP ACT.
A SOILS REPORT ON THIS PROPERTY HAS BEEN PREPARED BY QUANTUM GEOTECHNICAL, INC., ENTITLED "GEOTECHNICALINVESTIGATION ON PROPOSED RESIDENTIAL DEVELOPMENT AT KERN AVENUE", DATED MARCH 25, 2020, WHICH HAS BEENFILED WITH THE CITY OF GILROY.
I, BRYAN PIERCE, A LICENSED LAND SURVEYOR IN THE STATE OF CALIFORNIA, HEREBY STATE THAT THIS VESTINGTENTATIVE MAP IS BASED UPON SURVEY UNDER MY DIRECT SUPERVISION AND THAT IT COMPLIES WITH CITY OF GILROYSUBDIVISION ORDINANCE AND STATE MAP ACT.
TM 20-06
N 89° 59' 50" W 368.72'
N 01° 31' 00" W
434.15'
N 89° 59' 50" W 381.16'
S 0
0° 0
7' 3
0" W
4
34
.0
0'
LANDS OFST. FRANCIS INVESTMENTS III, A CALIFORNIA LIMITED PARTNERSHIP
APN: 790-17-003(DOC #24019154)
LANDS OFCRC KERN INVESTORS LLC, A CALIFORNIA LIMITED LIABILITY COMPANY
APN: 790-17-002(DOC #2413959)
RIGHTS OF THE PUBLIC
EX OAK TO REMAIN
VTM-02
EXIS
TIN
G C
ON
DIT
ION
S
BASIS OF BEARINGS:THE BEARING OF S00°07'30"W BETWEEN FOUND STANDARD CITY MONUMENTS ALONG THECENTERLINE OF KERN AVENUE, AS SHOWN ON THE MAP ENTITLED "TRACT NO. 9112, LOSARROYOS", FILED NOVEMBER 16, 1998 IN BOOK 710 OF MAPS, AT PAGES 1 AND 2, RECORDS OFSANTA CLARA COUNTY, CALIFORNIA, WAS USED AS THE BASIS OF BEARINGS.
BENCHMARK:SANTA CLARA VALLEY WATER DISTRICT BENCHMARK "BM259", A BRASS DISK SET IN THE TOPEASTERLY CURB FOR SANTA TERESA BOULEVARD AT THE CENTER OF THE SOUTH MOREYCHANNEL, 800 FEET NORTH FROM MANTELLI DRIVE, ELEVATION (NAVD88) = 219.75 FEET.
W:\J
OB
S 20
\202
016
- KER
N A
ND
ST
CLA
R\D
RA
WIN
GS\
PREL
IM\A
PPLI
CA
TIO
NS\
VTM
\VTM
-02
EXIS
TIN
G C
ON
DIT
ION
S.D
WG
PROPOSED
LEGENDDESCRIPTION EXISTING
PROPERTY LINE
EASEMENT
FACE OF CURB
STORM DRAIN
WATER
MANHOLE
SIDEWALK
SANITARY SEWER
FIRE HYDRANT
STORM DRAIN FIELD INLET
STORM DRAIN CURB INLET
UNDERGROUND RETENTION FACILITY
BOUNDARY
ELECTROLIER
SD
SS
W
VES
TIN
G T
ENTA
TIV
E M
AP
THE
CO
TTA
TGES
AT
KER
NG
ILR
OY
, CA
LIFO
RN
IAFO
R: D
. R. H
OR
TON
GENERAL NOTES:ALL VEGETATION WITHIN PROJECT BOUNDARY TO BE REMOVED EXCEPT TREES NOTED TOREMAIN.
16.0'
PSE
PARCEL ACOMMON
OPENSPACE
26'
36'
36'
24.0'35.0'
KER
N A
VEN
UE
(PU
BLI
C S
TREE
T)66' 46' 46' 46' 61' 80'
45'
84'
44'
44'
44'
44'
44'
86'
73'63'44'44'45'88'
88'
88'
88'
65' 44' 44' 58'
98'
95'
41'26'
16'
68'
82'
93'
92'
91'
77'50
'44
'46
'44
'50
'37'
53'50'
88'
44'46'
44'50'
44'
81'
81'
81'
51'
41'
44' 32' 33'
44'44'
44'
26'
51'
15'
26'
69'
70'
81'
57'
26'
16'
32'45'27'
7'36'
23'
38'4'
33'10'
44'44'
10'
33'
4'
44'
30'23'
20'38' 35'
83'
83'
83'
85'
38'
55'
60'
87'
46'44'
1
4
5
2
3
6
29
9
24
22
16151413
28 27 2625
23
21
20
19
18
17
12
7 8
10
11
3,814 ± SF 3,819 ± SF 3,870 ± SF
3,817 ± SF6,363 ± SF
4,630 ± SF
3,822 ± SF
4,014 ± SF
4,070 ± SF
3,989 ± SF
3,430 ± SF
7,389 ± SF
3,848 ± SF3,420 ± SF3,038 ± SF3,129 ± SF
4,057 ± SF
4,293 ± SF
4,312 ± SF
4,433 ± SF3,563 ± SF3,564 ± SF5,097 ± SF
4,400 ± SF
3,872 ± SF
4,048 ± SF
3,872 ± SF
4,415 ± SF
8' 11'
16'
14'12'
4'
45'
12'
21' 4'
81'
12'
121'
121'
37'
98'
18'
69'
PARCEL B
R=28R=28
R=28R=50
R=36
R=50
R=50R=50
R=36
R=500
R=50
16'PSE
16'PSE
7' PSE
16'PSE
16'PSE
16'PSE
10' PSE
16'PSE
16'PSE
16'PSE
WIC
KH
AM
CO
UR
T(P
RIV
ATE
STR
EET)
BARTON WAY(PRIVATE STREET)
0.12 ± AC
0.09 ± AC
WICKHAM COURT(PRIVATE)
19'
9'
18'
6'
6'
5.5'
5.5'
5.5'
6'
5,255 ± SF
5.5'
5.5'5.5'
36' PRIVATE STREETBARTON WAY & WICKHAM COURT
NO SCALE
8.0' PARKING
36.0' ROW
FC/ROW
16.0' PSE5.5'
SWK 10.0' TRAVEL LANE℄
8.0' PARKING10.0' TRAVEL LANE
16.0' PSE
5.5' SWK
KERN AVENUE (PUBLIC STREET)NO SCALE
24.0'TO BE DEDICATED TO THE CITY OF GILROY
16.0' PSE
6.0' SWK
35.0'
FCR/W
EXIST.PL
10.0' LANDSCAPE
PROPOSED RESIDENTIALSUBDIVISION
FC/ROW
FC/ROW
13.0' TRAVEL LANE
26.0' PSE
13.0' TRAVEL LANE
PL PL
2%
℄
26' PRIVATE ALLEY (NO PARKING)WICKHAM COURT (PARCEL B)
NO SCALE
10.0' PSE 7.0' PSE
GRIND AND OVERLAY EXISTING STREET
W:\J
OB
S 20
\202
016
- KER
N A
ND
ST
CLA
R\D
RA
WIN
GS\
PREL
IM\A
PPLI
CA
TIO
NS\
VTM
\VTM
-03
SITE
PLA
N.D
WG SI
TE P
LAN
VTM-03
PROPOSED
LEGENDDESCRIPTION EXISTING
PROPERTY LINE
EASEMENT
FACE OF CURB
STORM DRAIN
WATER
MANHOLE
SIDEWALK
SANITARY SEWER
FIRE HYDRANT
STORM DRAIN FIELD INLET
STORM DRAIN CURB INLET
UNDERGROUND RETENTION FACILITY
BOUNDARY
ELECTROLIER
SD
SS
W
VES
TIN
G T
ENTA
TIV
E M
AP
THE
CO
TTA
TGES
AT
KER
NG
ILR
OY
, CA
LIFO
RN
IAFO
R: D
. R. H
OR
TON
UP
A/C A/C
UP
A/CA/C
A/CA/C
A/C A/C
A/C
A/C
A/C
A/C
A/CA/C
A/C A/C
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
A
/C
A
/C
A/C
A/C
A
/
C
A
/
C
A/C
A/C
UP
A/C
A/C
A/C
A/C
A/C
A/C
14PAD 216.0
13PAD 216.3
15PAD 215.9
16PAD 215.7
17PAD 215.7
18PAD 215.5
19PAD 215.3
20PAD 215.1
21PAD 214.9
22PAD 214.6
23PAD 214.4
24PAD 214.7
25PAD 214.9
26PAD 214.9
27PAD 214.7
29PAD 214.9
6PAD 215.0
10PAD 215.0
11PAD 215.2
12PAD 215.5
1PAD 216.2
2PAD 215.9
3PAD 215.6
4PAD 215.3
5PAD 215.3
7PAD 214.7
8PAD 214.7
9PAD 215.0
28PAD 214.7
LPTC 213.3
CL 214.3±
GBCL 213.8
CL 213.9
CL 215.1
CL 215.3 CL 215.0
LPCL 213.2
LPTC 213.27
HPTC 213.7
TC 213.7
LPTC 213.2
HP
TC 2
13.8TC
213
.7TC
214
.3
TC 2
14.3
HPTC 214.9
LPTC
213
.8
TC 214.9
TC 215.1TC 215.5
TVC 215.9
TVC 215.7
TVC 215.6
CL 214.9
TC 215.0
TVC 216.1
TC 213.7TC
214
.2
TC 2
14.0
TC 213.7
TC 2
14.1
TC 2
15.2
CL/BOW
214.8
TVC
215.5
PAV 214.3
GBCL 214.4
HPTC 213.8
CL 213.8CL 213.4
TC 213.5 TC 213.5
TC 213.5
TC 214.5 TC 214.5
1.7' MAX RETAINING
1.7' MA
X R
ETAIN
ING
2.0' MA
X R
ETAIN
ING
2.5' MA
X R
ETAIN
ING
2.9' MA
X R
ETAIN
ING
4.3' MA
X R
ETAIN
ING
3.8' MA
X R
ETAIN
ING
3.8' MAX RETAINING2.4' MAX RETAINING1.7' MAX RETAINING1.2' MAX RETAINING
1.3' MAX RETAINING
WIC
KH
AM
CO
UR
T
BARTON WAY
WICKHAM COURT
CL 213.8
PREL
IMIN
AR
Y G
RA
DIN
G P
LAN
VTM-04
SHEE
T R
EVIS
ION
S D
ATE
JOB NO.
OF SHEETS
SHEET
MK
BY
DA
TE
SCA
LEC
K
THE
CO
TTA
TGES
AT
KER
NG
ILR
OY
, CA
LFO
RN
IAFO
R: D
. R. H
OR
TON
202016
6
OC
T 20
20
VES
TIN
G T
ENTA
TIV
E M
AP
GRADING NOTES
1. ALL PROPOSED GRADES SHOWN ON THIS PRELIMINARY GRADING PLANARE PRELIMINARY AND SUBJECT TO CHANGE DURING FINAL DESIGN.
2. SEE THIS SHEET FOR GRADING SECTIONS.
3. PROJECT SHALL PROVIDE 2" AC OVERLAY WITH PAVEMENT DIG-OUTSALONG THE PROJECT FRONTAGE.
GRADING LEGEND
APPROXIMATE PAD ELEVATION
APPROXIMATE SPOT ELEVATION
SLOPE
POSSIBLE RETAINING WALL
ANTICIPATED STREET SLOPE
EMERGENCY OVERLAND DRAINAGE RELEASE
EXISTING CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED MAJOR CONTOUR
LINE OF VISIBILITY PER CITY OF GILROY STANDARD DETAIL STR-9
P 214.0
213.0
1.5%
EARTHWORK SUMMARYITEM QUANTITY
SITE CUT 7,100± CY
SITE FILL 9,900± CY
NET IMPORT 2,800± CY
UP
A/C A/C
UP
A/CA/C
A/CA/C
A/C A/C
A/C
A/C
A/C
A/C
A/CA/C
A/C A/C
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
A
/C
A
/C
A/C
A/C
A
/
C
A
/
C
A/C
A/C
UP
A/C
A/C
A/C
A/C
A/C
A/C
8" PVC W PRIVATE
18" PVC SD S=0.005±
8" PVC W
8" P
VC
W
8" PVC W
8" PVC W
8" PVC SS S=0.012± 8" PVC SS S=0.003±
15" PVC SD S=0.02±
8" P
VC
SS
S=0.
003±
8" PVC SS S=0.003±
18"
PVC
SD
S=0.
005±
18" PVC SD S=0.005±
8" PVC SS S=0.003± PRIVATE (PVC)
18" PVC SD S=0.005± PRIVATE
SDMHRIM 213.7±INV 15" IN 208.7±INV 15" IN 206.9±INV 18" OUT 206.9±
SDMHRIM 213.2±INV 18"IN 206.3±INV 18" OUT 205.0
SDMHRIM 213.1±INV 18" THRU 208.7±
SDMHRIM 214.1±
CONNECT TO EX SDINV 18" 207.9±EX INV 207.9±
SSMHRIM 214.2±
CONNECT TO EX SSINV IN 204.7±
EX INV 204.61±
SSMHRIM 213.8±INV 8" THRU 205.5±
SDCITC 214.9±INV 15" OUT 209.9±
SSMHRIM 212.2±
INV 8" THRU 206.1±
SSMHRIM 215.0±
INV 8" THRU 206.3±SSMH
RIM 215.3±INV 8" 206.9±
SDMHRIM 215.2±
INV 18" THRU 204.7± SDMHRIM 214.9±
INV 15" IN 209.3±INV 18" OUT 205.0±
SDMHRIM 214.5±INV 18" OUT 209.2±
SDCITC 213.3±
INV 18" THRU 204.9±
18" SD INV 204.4
18" SD INV 204.4
1413 15 16 17
18
19
20
21
22
23
2425262729
6
10
11
12
1
2
3
4
5
7 8 9
28
EX 1
8" S
DEX
18"
SD
EX 1
2" S
S
EX 1
2" W
EX 1
2" W
EX 1
2" S
S8" WM
SDCITC 213.8INV 15" 208.5±
CO
NN
ECT
TO E
XIS
TIN
G W
STORMCHAMBER
8" BFP
SDCITC 214.0INV 15" 207.8±
15" SDS=0.005±
15" PVC SD S=0.005±
EX SDMHRIM 213.8±CONNECT TO EX SDMHINV 15" 207.5±EX INV 18" 207.5±EX INV 12" 207.5±
EX SDMHRIM 213.7±
CONNECT TO EX SDMHINV 15" 208.3±
EX INV 18" 208.2±EX INV 12" 208.3±
EX INV 12" 208.9±
EX SDCIRIM 213.2±
EX INV 12" 208.2±
EX SDCIRIM 213.1±
EX ELECT
EX ELECT
EX ELECT
EX FH
EX SSMH
EX SSMH
EX FH
WIC
KH
AM
CO
UR
T
BARTON WAY
WICKHAM COURT
SDCITC 213.3±
INV 15" OUT 206.7±SDCITC 213.2±INV 15" OUT 207.5±
SDCITC 213.7±
INV 15" OUT 209.2±
15" PVC SD S=0.01±
15"
PVC
SD
S=0.
01±
18"
PVC
SD
S=0.
005±
18"
PVC
SD
S=0.
005±
PREL
IMIN
AR
Y U
TILI
TY P
LAN
VTM-05
UTILITY NOTES1. ALL PIPE SIZES, SLOPES AND ELEVATIONS ON THIS PRELIMINARY
UTILITY PLAN ARE PRELIMINARY AND SUBJECT TO REFINEMENTDURING FINAL DESIGN.
2. ALL WATER MAINS SHOWN IN PUBLIC STREETS ARE PUBLIC AND SHALLBE MAINTAINED BY THE CITY OF GILROY.
3. ALL WATER MAINS SHOWN IN PRIVATE STREETS SHALL BE PRIVATEAND MAINTAINED BY THE HOMEOWNER'S ASSOCIATION.
4. ALL SANITARY SEWER MAINS SHOWN IN PRIVATE STREETS SHALL BEPRIVATE AND MAINTAINED BY THE HOMEOWNERS' ASSOCIATION.
5. ALL STORM DRAIN MAINS SHOWN IN PRIVATE STREETS SHALL BEPRIVATE AND MAINTAINED BY THE HOMEOWNERS' ASSOCIATION.
6. ALL SANITARY SEWER AND STORM DRAIN SHOWN IN PUBLIC STREETSSHALL BE OWNED AND MAINTAINED BY THE CITY OF GILROY.
7. STORM DRAIN PIPE SYSTEM TO BE DESIGNED TO MEET CITY OF GILROYDESIGN STANDARDS TO CONVEY THE 10-YEAR, 24-HOUR STORM PEAKFLOW RATE. THE 100-YEAR, 24-HOUR PEAK FLOW WILL BE CONVEYEDBY THE FULL STREET SECTION TO THE DOWNSTREAM STORM WATERBASIN.
UTILITY LEGEND & ABBREVIATIONS
STORM DRAIN
SANITARY SEWER
WATER
MANHOLE
INLET
FIRE HYDRANT
WATER METER
ELECTROLIER
STORM DRAIN
STORM DRAIN MANHOLE
SANITARY SEWER
SANITARY SEWER MANHOLE
SLOPE
INVERT ELEVATION
WATER
PROPOSED EXISTING/FUTURE
SD
SDMH
SS
SSMH
S
INV
W
SHEE
T R
EVIS
ION
S D
ATE
JOB NO.
OF SHEETS
SHEET
MK
BY
DA
TE
SCA
LEC
K
THE
CO
TTA
TGES
AT
KER
NG
ILR
OY
, CA
LFO
RN
IAFO
R: D
. R. H
OR
TON
202016
6
OC
T 20
20
VES
TIN
G T
ENTA
TIV
E M
AP
UP
A/C A/C
UP
A/CA/C
A/CA/C
A/C A/C
A/C
A/C
A/C
A/C
A/CA/C
A/C A/C
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
UP
A/C A/C
UP
A/CA/C
UP
A/C
A/C
UP
A/C
A/C
A
/C
A
/C
A/C
A/C
A
/
C
A
/
C
A/C
A/C
UP
A/C
A/C
A/C
A/C
A/C
A/C
SCM A
WIC
KH
AM
CO
UR
T
BARTON WAY
WICKHAM COURT
PROPOSED
LEGENDDESCRIPTION
STORM DRAIN
STORM DRAIN INLET
DRAINAGE AREA BOUNDARY
DRAINAGE MANAGEMENT AREA ID
PRELIMINARY STORMWATER SIZING CALCULATIONS
NOTE:1) REFER TO STORM WATER CONTROL PLAN FOR PRELIMINARY AREA
CALCULATIONS.
UNDERGROUND RETENTION FACILITY
STORM WATER MANAGEMENT NOTES:
1. THE PROJECT IS LOCATED IN THE CENTRAL COAST REGIONAL WATER QUALITY CONTROL BOARD (CCWQCB) JURISDICTION.STORM WATER RUNOFF MANAGEMENT SHALL ADHERE TO THE CRITERIA IDENTIFIED IN THE "STORMWATER MANAGEMENTGUIDANCE MANUAL FOR LOW IMPACT DEVELOPMENT & POST CONSTRUCTION REQUIREMENTS FOR THE CITY OF GILROY,CITY OF MORGAN HILL, AND COUNTY OF SANTA CLARA", DATED JUNE 2015.
2. THIS STORM WATER RUNOFF MANAGEMENT PLAN IS CONCEPTUAL AND SUBJECT TO REVISION BASED ON FINAL DESIGN ANDSITE SPECIFIC INFILTRATION TESTING.
3. THE UNDERGROUND STORMWATER RETENTION WAS SIZED USING THE "ROUTING METHOD" IN COMPLIANCE WITH APPENDIXD OF THE CCRWQCB RESOLUTION NO. R3-2013-0032. A GEOTECHNICAL REPORT HAS NOT BEEN PREPARED FOR THIS PROJECT,CALCULATIONS ARE SUBJECT TO CHANGE DURING FINAL DESIGN BASED ON SOIL INFORMATION.
4. ALL STORMWATER CALCULATIONS PROVIDED ARE PRELIMINARY AND SUBJECT TO CHANGE DURING FINAL DESIGN. THE LIDMEASURES AND STORMWATER CONTROL FACILITIES MAY BE CHANGED OR MODIFIED DURING FINAL DESIGN AS LONG AS THEPROJECT CAN SHOW CONFORMANCE WITH THE CITY OF GILROY AND CCRWQCB POST-CONSTRUCTION STORMWATERREGULATIONS IN EFFECT AT THE TIME OF THE PROJECT APPROVAL.
5. PEAK FLOW AND FLOOD CONTROL MANAGEMENT IS PROVIDED IN EACH TREATMENT AREA WHERE APPLICABLE.
PREL
IMIN
AR
Y S
WC
PLA
N
VTM-06
SHEE
T R
EVIS
ION
S D
ATE
JOB NO.
OF SHEETS
SHEET
MK
BY
DA
TE
SCA
LEC
K
THE
CO
TTA
TGES
AT
KER
NG
ILR
OY
, CA
LFO
RN
IAFO
R: D
. R. H
OR
TON
202016
6
OC
T 20
20
VES
TIN
G T
ENTA
TIV
E M
AP