Manjung 4 Malaysia Ultra Supercritical Coal Plant

4
7/21/2019 Manjung 4 Malaysia Ultra Supercritical Coal Plant http://slidepdf.com/reader/full/manjung-4-malaysia-ultra-supercritical-coal-plant 1/4 TPW / LEAF / MAN4TWOPABOI /eng / THP /03.13 / CH /7818 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.  Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper. TNB Janamanjung Sdn Bhd, a subsidiary of Malaysia’s state-controlled power generation, transmission and distribution company Tenaga Nasional Bhd (TNB) has awarded the turnkey engineering, procurement and construction (EPC) contract for the Manjung 4, 1000 MW, ultra-supercritical, coal-fired steam power plant to Alstom, project leader and its consortium partner, China National Machinery Import and Export Corporation. The contract follows TNB’s 1999 contract with Alstom to build the 3x700 MW Manjung coal-fired power plant that went into operation in 2004. These units also utilise Alstom’s clean coal combustion technology and market leading environmental control systems. The new power plant will be constructed next to the existing power plant, at Perak, 10 km south of the nearest town Lumut, approximately 288 km north of Kuala Lumpur. It will be the first coal-fired power plant in Malaysia utilising ultra-supercritical technology and the single largest unit in South East Asia. Customer:  ............................Tenaga Nacional Berhard Janamanjung Scope of supply: .................. Engineering, Procurement and Construction (EPC) consisting of 1x1000 MWe USC two-pass boiler, 1x1000 MWe STF100 steam turbine and 1 two-pole GIGATOP turbogenerator Electrical output: ................. 1000 MW (net) Commercial operation: ........Scheduled for 2015 PROJECT FEATURES The Manjung 4 Project benefits from the superior integration resulting from Alstom’s project management skills, EPC capabilities, and state-of-the-art key components: Two-pass, ultra-supercritical, once-through PC boiler (tangential firing, low NOx combustion system) STF100 steam turbine with one high-pressure, one intermediate-pressure and three double-flow low-pressure turbines for high efficiency and reliability Two-pole GIGATOP turbogenerator with the most advanced water hydrogen-cooling technology for generators, providing high efficiency, outstanding reliability and simple maintenance Alstom’s latest ALSPA® Series 6 Distributed Control System Environmental control systems including seawater flue-gas desulfurisation (SWFGD) and pulse-jet fabric filter (FF) to reduce flue gas emissions. South East Asia’s first 1000 MW, ultra-supercritical, coal-fired power plant. CASE STUDY: STEAM Manjung Unit 4, Malaysia Two-Pass Boiler TPW / LEAF / MAN4TWOPABOI / eng / THP / 06.15 / CH / 7818 © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.  Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.

description

o

Transcript of Manjung 4 Malaysia Ultra Supercritical Coal Plant

Page 1: Manjung 4 Malaysia Ultra Supercritical Coal Plant

7/21/2019 Manjung 4 Malaysia Ultra Supercritical Coal Plant

http://slidepdf.com/reader/full/manjung-4-malaysia-ultra-supercritical-coal-plant 1/4

TPW / LEAF / MAN4TWOPABOI / eng / THP / 03.13 / CH / 7818 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. Norepresentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical andcommercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without expresswritten authority, is strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.

TNB Janamanjung Sdn Bhd, a subsidiary of Malaysia’s state-controlled powergeneration, transmission and distribution company Tenaga Nasional Bhd (TNB)has awarded the turnkey engineering, procurement and construction (EPC)contract for the Manjung 4, 1000 MW, ultra-supercritical, coal-fired steampower plant to Alstom, project leader and its consortium partner, China NationalMachinery Import and Export Corporation.

The contract follows TNB’s 1999 contract with Alstom to build the 3x700 MWManjung coal-fired power plant that went into operation in 2004. These unitsalso utilise Alstom’s clean coal combustion technology and market leadingenvironmental control systems.

The new power plant will be constructed next to the existing power plant, atPerak, 10 km south of the nearest town Lumut, approximately 288 km north ofKuala Lumpur. It will be the first coal-fired power plant in Malaysia utilisingultra-supercritical technology and the single largest unit in South East Asia.

Customer: ............................Tenaga Nacional Berhard JanamanjungScope of supply: ..................Engineering, Procurement and

Construction (EPC) consistingof 1x1000 MWe USC two-pass boiler,1x1000 MWe STF100 steam turbine and1 two-pole GIGATOP turbogenerator

Electrical output: .................1000 MW (net)Commercial operation: ........Scheduled for 2015

PROJECT FEATURESThe Manjung 4 Project benefits from the superior integration resulting fromAlstom’s project management skills, EPC capabilities, and state-of-the-art keycomponents:

•Two-pass, ultra-supercritical, once-through PC boiler (tangential firing,low NOx combustion system)

•STF100 steam turbine with one high-pressure, one intermediate-pressureand three double-flow low-pressure turbines for high efficiency and

reliability•Two-pole GIGATOP turbogenerator with the most advanced water

hydrogen-cooling technology for generators, providing high efficiency,outstanding reliability and simple maintenance

•Alstom’s latest ALSPA® Series 6 Distributed Control System

•Environmental control systems including seawater flue-gasdesulfurisation (SWFGD) and pulse-jet fabric filter (FF) to reduce fluegas emissions.

South East Asia’s

first 1000 MW,

ultra-supercritical,

coal-fired power plant.

CASE STUDY: STEAM

Manjung Unit 4, MalaysiaTwo-Pass Boiler

TPW / LEAF / MAN4TWOPABOI / eng / THP / 06.15 / CH / 7818 © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. Norepresentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical andcommercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without expresswritten authority, is strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.

Page 2: Manjung 4 Malaysia Ultra Supercritical Coal Plant

7/21/2019 Manjung 4 Malaysia Ultra Supercritical Coal Plant

http://slidepdf.com/reader/full/manjung-4-malaysia-ultra-supercritical-coal-plant 2/4

Manjung 4: State-of-the-art boilerfor ultra-supercritical power plant

PROJECT HIGHLIGHTS

•High performance

•Increased operational flexibility

•Maximised fuel flexibility

•Low NOx and SOx emissionsover a wide load range

 Alstom’s market-leading ultra-supercritical technology at Manjung will provide additional capacity to meet the increasing demandin one of the world’s fastest growing economies, producingenough electricity to supply power to nearly 2 million Malaysianhouseholds.

The outstanding feature of the Manjung 4 power plant will be itsultra-supercritical boiler, the first of its type to be built in SoutheastAsia, and an important development for improving overall energyefficiency in the region.

The key to greater efficiency in a steam power plant is more advancedsteam conditions. The higher the temperature and pressure at whichthe steam is produced by the boiler, the greater the potential efficiencyof thermal to electricity conversion in the steam turbine /generator portion of the plant.

The unit will provide TNB customers with clean,reliable and economical electricity from Indonesian,Australian and South African coal resources.

With the quality of the available coal decreasing as the best coal reserves areexhausted, modern, high-capacity steam plants must now be able to cope with awider range of coals than has traditionally been the case.

With these limitations in mind, the new

plant at Manjung 4 is being specified witha net plant electrical output of 1000 MWand an efficiency nearly five percentage

points higher than the existing three sub-critical units at Manjung.

An increase of five percentage points isan extremely significant advance. It willresult in a reduction in operating costs

because each tonne of coal burned atManjung 4 will generate close to 14 percent more power than in the existing

subcritical Manjung power plant.Furthermore, emissions will improvewith nitrogen oxides (NOx), sulphurdioxide (SO2), carbon dioxide (CO2)

and particulates all lower.

And since a supercritical plant costs only

slightly more to build than an ultra-super-critical plant of a similar size, the unit costwill be competitive as well.

3D model of the two-pass boiler used at the Manjung 4 power plant

Page 3: Manjung 4 Malaysia Ultra Supercritical Coal Plant

7/21/2019 Manjung 4 Malaysia Ultra Supercritical Coal Plant

http://slidepdf.com/reader/full/manjung-4-malaysia-ultra-supercritical-coal-plant 3/4

CASE STUDY: STEAMMANJUNG 4, MALAYSIA, TWO-PASS BOILER

MANJUNG 4 – TECHNICAL SPECIFICATIONSTECHNICAL DATA OF STEAM GENERATOR GUARANTEE MODE OF OPERATION

Main steam flow 3226 metric tons / hr | 7111 M Lb / hr   •Sliding pressure operation with daily loadswings from 30% to 100%

Superheater outlet steam pressure 282 barg | 4090 psig

Superheat / reheat steam temperature 600 °C / 605 °C | 1112 °F / 1121 °F

FUEL (AS RECEIVED) DESIGN RANGE  AIR HEATER

Gross calorific value (kcal / kg)(Btu / Lb)

52009360

4500 – 55008100 – 9900

•2x trisector semi-modular

•Regenerative air heaters

Moisture content (%wt) 22.1% 8% – 30%  AIR AND FLUE GAS SYSTEMS

Ash content (%wt) 1.6% 1.5% – 13.9%

1.1% – 15%

•2x 50% primary air fans

•2x 50% induced draft fans•2x 50% forced air draft fans

Sulphur (%wt) 0.47% 0.1% – 0.94% GRINDING AND FIRING PLANT

Volatile matter (%wt) 35% 22% – 45%   •8 gravimetric raw coal feeders

•8 HP 1023 pulverisers with dynamic classifiersFixed carbon (%wt) 41% 35% – 58.1%

FLUE GAS EMISSION LEVELS AT STACK  MG / NM3 @ 6%O2 LB / MMBTU

Sulfur dioxide (SO2) 500 0.41

Nitrogen oxides (NOx) 500 0.41

Carbon monoxide (CO) 200 0.16

DESIGN FEATURESTangential Firing System

•Excellent fuel / air mixing:

 - Wider tolerance to fuel fluctuations

•Low NOx emissions at highcombustion efficiency:

 - Advanced burner design andfuel / air staging

 - Efficient use of furnace volume

•Low slagging tendency:

 - Reduced cleaning requirements

 - Maximum sustained efficiency

Tilting Burners

•Ability to control reheat temperatureover a wide load range

•No spray attemperation for reheattemperature control:

 - Higher efficiency

 - Avoidance of backpass

•Highest cycle efficiency over widestload range

Two-Pass Boiler: High efficiency with low emissionsand highly reliable operation

The Manjung 4 boiler is a vertical wall, two-fireball, two-pass design equiped with Alstom’s unique TFS 2000® firing system that will burn bitumous &sub-bitumous coals.

The boiler’s high pressure, high temperature, advanced steam cycle significantlyincreases plant efficiency, thus also minimising emissions and fuel costs.

MANJUNG 4 SPECIFICS

•The boiler features a main steam flow of 3226 tonnes / hour (t / h) at 282 barg and600°C, categorising it as an ultra-supercritical boiler.

•The vertical tube design incorporates rifled tubing and stress reduction features forthe furnace wall, allowing sliding pressure operation for more flexibility during dailyload swings, lower maintenance and improved availability.

•The combustion system composed of a main windbox and a separate overfireair windbox allows the adjustment of fuel and air conditions to suit different typesof coal, maximising combustion efficiency while maintaining low emissions.

Page 4: Manjung 4 Malaysia Ultra Supercritical Coal Plant

7/21/2019 Manjung 4 Malaysia Ultra Supercritical Coal Plant

http://slidepdf.com/reader/full/manjung-4-malaysia-ultra-supercritical-coal-plant 4/4

TPW / LEAF / MAN4TWOPABOI / eng / THP / 03.13 / CH / 7818 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. Norepresentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical andcommercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without expresswritten authority, is strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.

For more informationplease contact Alstom Power:

Alstom PowerBrown Boveri Strasse 7

5401 BadenSwitzerland

Phone: +41 56 205 6923

Visit us online: www.alstom.com

CASE STUDY: STEAMMANJUNG 4, MALAYSIA, TWO-PASS BOILER

 ALSTOM BOILER EXPERIENCE

•Largest installed base, withapproximately 30% of boilersinstalled and under constructionworldwide using Alstomtechnology, totalling 835 GW

•Alstom has been providing utilityboilers since the 1920s

•World leader in the development ofmaterials and standards

•Worldwide manufacturing experience

•Optimised solution for every fuel

•Optimal heating surface design

•Vertical and spiral wall designs

FUEL CAPABILITIES

•Coals (anthracite, bituminous,sub-bituminous, lignite)

•Co-firing of coal waste, sludge andindustrial waste, oil refining wasteand biomass

•Oil (crude, heavy residual)

•Gases (natural gas, others)

•More than 20 year’s of experiencewith co-firing biomass

 APPLICATIONS

•Utility and independent powerproduction

•Combined heat and power production

• Industrial

 ALSTOM OFFERS

•Boiler island – boiler, air preheaters, fuel / firing system, coal feeders,

pulverisers / mills, ash handling systems and control systems•Power island – boiler island, steam turbine and generator, air quality control

system (selective catalytic reduction, baghouse / electrostatic precipitator, fluegas desulfurisation) and integrated control system

•Full turnkey power plant, with Alstom’s Plant Integrator™ approach, througha unique combination of project management skills, engineering, procurementand construction (EPC) capabilities, knowledge and excellence in componentdesign and manufacturing to create real value for our customers throughoutthe complete life cycle of a power plant

Alstom designs and

supplies utility-scale

boilers that combust

an extensive range of

fossil fuels for steam

power generation.

Today, our advanced, high-efficiency, pulverised-coal ultra-supercriticalboilers offer plant owners many benefits.

The technology’s higher steam temperature and pressure parameters providethe most economical solution to improving plant efficiency and operatingflexibility, achieving fuel cost savings, and reducing emissions for each kWhof electricity generated.

Alstom’s ultra-supercritical boiler designs are at the heart of today’s state-of-the-art plants, meeting the diverse requirements of projects all over the globeand firing the full range of international coals.

Boiler: Unmatched experience in steam generationand fuel combustion technologies

TPW / LEAF / MAN4TWOPABOI / eng / THP / 06.15 / CH / 7818 © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. Norepresentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical andcommercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without expresswritten authority, is strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.