Managing for Success in Toledo's $500 million Toledo Waterways Initiative

46
July 18–20, 2010 | Kansas City, Missouri 2010 WATER SUMMIT Managing for Success in Toledo's $500 million Toledo Waterways Initiative George Robinson, M.B.A. – City of Toledo, Commissioner of TWI Bob Harbron, P.E. – Black & Veatch, TWI Program Director Cary Duchene, P.E. – Black & Veatch, TWI Deputy Program Director Larry Zimmerman, P.E. – Black & Veatch, PM/CM Director

description

Managing for Success in Toledo's $500 million Toledo Waterways Initiative. George Robinson , M.B.A. – City of Toledo, Commissioner of TWI Bob Harbron , P.E. – Black & Veatch, TWI Program Director Cary Duchene , P.E. – Black & Veatch, TWI Deputy Program Director - PowerPoint PPT Presentation

Transcript of Managing for Success in Toledo's $500 million Toledo Waterways Initiative

Page 1: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

July 18–20, 2010 | Kansas City, Missouri

2010 WATER SUMMIT

Managing for Success in Toledo's$500 million Toledo Waterways Initiative

George Robinson, M.B.A. – City of Toledo, Commissioner of TWI

Bob Harbron, P.E. – Black & Veatch, TWI Program Director

Cary Duchene, P.E. – Black & Veatch, TWI Deputy Program Director

Larry Zimmerman, P.E. – Black & Veatch, PM/CM Director

Page 2: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 2

Bob Harbron, P.E.Black & Veatch – TWI Program Director

Program Introduction

Page 3: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 3

Toledo Waterways Initiative TWI…Toledo’s Wet Weather Program

Eliminate WWTP BypassesEliminate Known SSOsReduce and Control CSOs

Page 4: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 4

Toledo Waterways Initiative Learning Objectives

Illustrate Successful Program Management in Toledo

Connect PrM for Delivery of Design and Construction to meet Aggressive Schedules and Innovative Facilities

Present Integrated Client and PrM ServicesShare Innovative Contracting Methods –

Integrated PrM Illustrate Cost Savings

Page 5: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 5

Toledo Waterways Initiative

Presentation OutlineToledo Background and HistoryProgram Management ApproachOwner’s Perspective and SuccessesWWTP ImprovementsCollection System Improvements InnovationUnique Challenges

Page 6: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 6

George Robinson, M.B.A.City of Toledo – Commissioner of TWI

The Owner’s Perspective

Page 7: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 7

Toledo, Ohio - History

Founded 1833 in Michigan Re-Founded in 1837 in Ohio (after

the Toledo War) Major Shipping Hub

Water, Air, Rail, Road Erie Canal Home of Jeep Glass Industry Tony Paco’s

Page 8: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 8

Toledo, Ohio - Demographics

City of Toledo Population: 315,000 Metro Area: 650,000

Page 9: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 9

Toledo – Wastewater System Characteristics Wastewater Service Area – 100 square miles Combined Sewer Area – 18 square miles Permitted CSOs - 33 Bay View Water

Reclamation Plant Service Area Population: 400,000 Original Construction 1922 Annual Average Flow 70 MGD 195 MGD Secondary Treatment 205 MGD Wet Weather Facility

Page 10: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 10

Toledo Wastewater Service Area

Mau

mee

Rive

r

Swan Creek

Ottawa RiverLake Erie

BAY VIEW WWTP

Page 11: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 11

Receiving Streams / Water Bodies

Ottawa River – into Maumee Bay / Lake ErieHeavy recreational boating near outlet near

outlet Swan Creek – into Maumee River

Urban setting, some canoeing, targeted for restoration

Maumee River – into Maumee Bay / Lake ErieMajor shipping and recreational boating

Page 12: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 12

Combined Sewer Area

WWTP

Page 13: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 13

Lawsuit and Consent Decree 1991 – 2001: Litigation and Negotiation

Effluent and Bypass Violations 2001 COT Negotiates SettlementComprehensive Wet Weather Consent Decree

2002: City Referendum to Approve CD on BallotRequired By City Charter60% Voter Approval

Page 14: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 14

Lawsuit and Consent Decree 2002 - Comprehensive Wet Weather Consent

DecreeEliminate Known SSOs by 2006New Wet-Weather Treatment Facility at Bay

View WWTP by 2007Develop CSO Long Term Control Plan by 2006 Implement the LTCP by 2016Estimated $450M

Page 15: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 15

Integrated Program Management Program Direction

Public Relations and Education Regulatory Coordination Contract Administration Program Funding Assistance Financial Accounting Cost Management Program Scheduling

Page 16: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 16

Integrated Program Management Program Conceptual Development

Technology Selection LTCP

Preliminary Design Final Design Construction Management (not-at-risk) Construction Inspection Post Monitoring & Certifications

Page 17: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 17

Integrated Program Management

BLACK & VEATCH TeamIntegrated Program

Management and Engineering

General & Administrative Services

Engineering Services

BLACK & VEATCH

Program OversightEngineer

Page 18: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 18

Why Integrated Program Management? COT – Strong Mayor Government

TWI is a Long Program…15-20 years Consistent PrM Team through Changes in Administration

COT Contracting Flexibility Contract with ONE Firm But Allow Flexibility to Add / Delete Resource Firms

Single Source Responsibility for Program Performance No Finger Pointing PrM Responsible for Consent Decree Fines

Page 19: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 19

Program Manager Selection Selection by Blue Ribbon Panel

Panel Representation: Local Business Leaders, University of Toledo, Ohio State University and City Administration.

Recommended Black & Veatch

Largest Professional Services Contract in COT History

City Expectations of the PM Firm: National Engineering Expertise and Resources Longstanding Corporate Stability Wastewater and CSO Control Experience Local Participation – 90% Local Minority Business Mentorship Reasonable Price

Page 20: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 20

Success: Public Relations Community Advisory Committee Neighborhood Advisory Committees LTCP Alternative Meetings Public Survey Brochures TWI Website: www.toledowaterwaysinitiative.com

Page 21: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 21

Public Relations – No One Went Unheard

CITIZEN’S ADVISORY COMMITTEE

Page 22: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 22

EXHIBIT A – CONSENT DECREE MILESTONES – OVERALL PROGRAM SCHEDULE

Met consent decree schedule

Eliminated targeted SSOs and reduced backups

Ended bypasses of partially treated sewage at Bay View WWTP

Success: CD Milestones

Page 23: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 23

Success: Program Funding (Thru 2007)PROGRAM SOURCE GRANT LOAN

U.S. Army Corps of Engineers $3,344,000

Ohio Public Works Commission $2,869,400 $1,927,000

Ohio Water Development Authority $100,000

State and Tribal Assistance Grants $7,625,800

Water Pollution Control Loan Fund $224,858,293

TOTALS $13,939,200 $226,785,293

Page 24: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 24

Cary Duchene, P.E.Black & Veatch – TWI Deputy Program Director

Technical and Management Aspects

Page 25: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 25

Technical Program Wastewater Treatment Plant Improvements

Eliminate Bypasses Sanitary Sewer System Improvement

Eliminate Known SSOs Combined Sewer System

Reduce and Control CSOs

Page 26: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 26

Wet-Weather Treatment Facility Eliminate Plant Bypasses Major WWTP Wet-Weather Facility

Grit Removal and Screening - 232 MGDBallasted-Flocculation - 232 MGD

Largest DensaDeg BF Facility in North America

Equalization Basin – 25 MG Chlorine Contact Basin – 205 MGD

Constructed Concurrently in 18 Months

Page 27: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 27

Wet-Weather Treatment Facility

Main WWTPReaeration & Chlorination

Vortex Grit RemovalScreening (1 sewer)

DensaDeg – 6 units/232 mgd

EQ Basin – 25 MG

Page 28: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 28

Wet-Weather Treatment Facility

Architecture Result of Public

Meeting Process

Page 29: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 29

Wet-Weather Treatment Performance

OperatingMode

Influent Concentration

Effluent Concentration

Percent Removal

Pollutant Rangemg/L

Averagemg/L

Rangemg/L

Averagemg/L

Range%

Average%

Primary & Excess Flow

Treatment (Units 2-6)

Ammonia 1.8 – 3.2 2.4 1.8 – 3.1 2.4 <0 – 22 0

TKN 2.9 – 12.9 6.3 2.0 – 7.0 4.5 5 – 64 28

CBOD 20 - 77 42 10 – 27 16 22 – 82 54

Suspended CBOD 10 - 66 31 2 – 21 9 12 – 93 64

TSS 19 - 440 131 9 - 66 18 <0 – 97 74

Total P 0.6 – 2.1 1.1 0.2 – 0.5 0.2 64 – 90 79

Page 30: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 30

SSO EliminationPoint Place and River Road

Areas – Early ActionProjects CompletePump Stations/ConveyanceStorage 3 MG13 Projects: $35M

Page 31: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 31

Long Term Control Plan Development Draft Submitted - December 2005

25 Projects Based on 4 Overflows in Average Year 1-3 Overflows in Average Year Sensitive Areas $256M Total Project Cost (2005 Dollars)

LTCP Approval 2010 3-4 Overflows/AVG Year – Swan Creek 3 Overflows/AVG Year – Maumee River 0 (2 per 5 years) Overflows/AVG Year – Ottawa R. EPA Added 10-year Pathogen Study for BF Time Extension (3 Additional Years) 2 Project Consolidated Cost is up to $317M (2005 Dollars)

Page 32: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 32

Long Term Control Plan Anticipated Results

Overflow Locations from 33 to 23 Overflow Frequency from 30+/year to 0-4/year Overflow volume from 625 MG/year to 144 MG/year Reduces typical pollutant discharge by 86%-89% Reduces bacterial discharge by 90%

Improve Water Quality for Future Generations

Positive Response from Toledo Citizens

Page 33: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 33

Long Term Control Plan23 Projects

3 - SSES/Inflow Reduction3 - SSES/Sewer Separation1 - Sewer Separation (SSES Already

Completed)9 – CSO Storage (Combined Sewage)4 - Optimize Existing Storage Tunnels2 - Regulator Modifications1 - WWTP Headworks Improvement

Page 34: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 34

Long Term Control Plan

WWTP

Page 35: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 35

LTCP Implementation – SSES, Sewer Separation, I/I Reduction

Separate Select Combined Sewer Areas

Eliminate Select Regulators and Overflows

Reduce Inflow

Page 36: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 36

LTCP Implementation – CSO Storage 9 Projects - 55 MG

Facility MG

Monroe/Ayres 1.3

Ottawa River South 25.1

Dearborn 1.6

International Park 5.5

Oakdale 8.0

Ash/Columbus 2.1

Downtown Tunnel Extension 6.7

Maumee 2.6

Swan Tunnel Extension 1.6

Page 37: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 37

LTCP Implementation – Enhance Existing Storage 4 Projects Maximize Storage Enhance Capture Improve

Operations

Page 38: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 38

LTCP Implementation – Regulator Modifications 2 Projects – Regulators w/ Infrequent Overflows

Increase In-Line Storage Increased Flow to Interceptor…Offset by

Decreased Flow to Interceptor at Other Locations

All Remaining CSOs: Floatables ControlBaffling and Screening

Page 39: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 39

LTCP Implementation – WWTP Improvement Grit Process is a Bottleneck

Grit Facilities – 168 MGD (total) Primary/Secondary Capacity – 195 MGD (firm)

Equipment and Structures are Deteriorated Same Process…New Facility

195 MGD (Firm) / 240 MGD (Total) Enhance Operational Flexibility Reduce Usage of the Wet Weather Facility

Page 40: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 40

Pathogen Study Compare Physical/Chemical to Biological Process

HRC + Disinfection (Physical/Chemical Activated sludge + disinfection (Biological)

10 Year Study…First of its Kind Integrated Implementation

City of Toledo Black & Veatch Alloway Laboratories Michigan State University

Page 41: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 41

Schedule and Milestones 2009 LTCP Adds 121 NEW

Consent Decree Milestone Dates!!!

The First 11 have been Met Master Schedule To Track It

All

Page 42: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 42

LTCP Implementation ProgressProject Study FSP PD FD60 FD90 FD100 Const

O-2 Lockwood/Devilbiss Sewer Separation Done Done Done Done Done Done Ongoing

W-1 Ash/Columbus Storage Pipeline Done Done Done Done Done Done Ongoing

E-6 Wheeling SSES and Sewer Separation Done Done Done Done Done Ongoing  

S-3 Highland SSES and Sewer Separation Done Done Done Done Done Ongoing  

S-4 Woodsdale SSES & Inflow Reduction Done Done Done Done Done Ongoing  

W-2 Ash Street SSES Sewer Separation Done Done Done Done Done Ongoing  

W-5 Knapp/Williams SSES & Inflow Reduction Done Done Done Done Done Ongoing  

W-7 New York SSES & Inflow Reduction Done Done Done Done Done Ongoing  

W-6 Maumee Avenue Storage Basin Done Done Done Ongoing      

E-7 Bay View Grit Facility Done Done Ongoing        

O-3 Ayres/Monroe Storage/Conveyance Pipeline Done Done Done Done Ongoing    

E-5 Oakdale Storage Basin Done Ongoing          

S-1A Swan Creek North Tunnel Optimization Done Starts 9/2010

S-2A Swan Creek South Tunnel Optimization Done Starts 9/2010

W-4A Downtown Tunnel Optimization Done Starts 9/2010

O-4A Ottawa River South Conveyance Done Starts 2012

O-4B Ottawa River South Storage Basin Done Starts 2012

E-2 Dearborn Storage Basin Done Starts 2012

E-3 International Park Storage Pipeline Done Starts 2014

S-1B Swan Creek North Storage Tunnel Extension Done Starts 2014

W-4C Downtown Tunnel System Storage Basin Done Starts 2015

S-2B Swan Creek South Tunnel In-System Storage Done Starts 2015

E-1 Paine Regulator Modifications Done Starts 2016

E-4 Fassett Regulator Modifications Done Starts 2016

Page 43: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 43

Success – WWTP Performance

Page 44: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 44

Success: Cost Control (Thru 2007)

TWI Phase I Projects

$0

$10

$20

$30

$40

$50

$60

$70

$80

$90

$100

Program Management Bay View WWTP WetWeather Facilities

Point Place Projects

$ M

illio

n

Bid or Fee Final Construction Cost or Fee

Toledo Waterways Initiative — Big Projects, Big Savings….$20-60 M!

• $2 M under on PrM fees• $18 M savings Wet Weather Facility Siting• $40 M savings on FC 13 & EQ Basin

Page 45: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 45

Questions?

Contact InformationGeorge Robinson

[email protected]

(419) 936-2338

Cary [email protected]

(419) 720-0900

Bob [email protected]

(419) 720-0900

Larry [email protected]

(301) 921-8247

Page 46: Managing for Success in Toledo's $500 million Toledo Waterways Initiative

CMAA 2010 Water Summit | Kansas City, MO July 18-20

B&V - 46

Unique Challenges1. Aggressive Schedule – An 18 month construction schedule

for $60M in wet weather facilities per consent decree. Multiple projects…Same site.

2. 2-year Ballasted Flocculation Performance…24/7 for 2 Years – Conducting the study while waiting for and being able to respond to storm event at all hours of the day or night, including holidays.

3. Economic Recession and Furloughed City Staff – Maintaining a positive working relationship with an embattled client staff where many lost pay and benefits during a severe economic recession.

4. 90% Local – Putting a solid, capable and local team together with the right skill set to meet a 90% local hours contract requirement.

5. Water Quality…Not Flood Relief – Careful maneuvering of TWI, a program to improve receiving water quality, through several local flooding and basement backup events that have occurred.