MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration -...

27
© think project! thinkproject.com MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO PRODUCTION Sven-Eric Schapke, Director BIM/PLM

Transcript of MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration -...

Page 1: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! thinkproject.com

MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO PRODUCTION

Sven-Eric Schapke, Director BIM/PLM

Page 2: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 2

1

2

3

4

5

think project! Collaboration

Maturity of Collaboration

Document and Drawing Management

Model Managment and Coordination

Quality Management

TOPICS

Page 3: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 3

THINK PROJECT!GROUP

› think project! Group

• Since 2000 in Munich, Berlin

• 300 employees

• Projects from <1 mil. to > 2 bil. Euro

• 10,000 projects, in over 50 countries

• 120,000 users worldwide

• No.1 in Germany and Europe

› Locations

• CEMAR, Gloucester, UK

• EPLASS, Würzburg, Germany

• planConnect, Dresden, Germany

• think project!

Austria / BeNeLux / France /

Germany (Munich, Berlin, Cologne) /

Iberia / Polska CEE / Switzerland (partner)

Page 4: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 4

PORTFOLIOSOFTWARE / SERVICE

STRATEGICCONSULTING

PROJECTCONSULTING

BEST FITSOFTWARESOLUTIONS

PROJECT SERVICES ON DEMAND

TECHNOLOGY & DEVELOPMENT

SERVICE & SUPPORT

Page 5: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5

COMMON DATA ENVIRONMENTSERVICES / MODULES / APPLICATIONS

Open API

AutoCAD

BCF API

MS Desktop

MS Excel

MS Outlook

MS Sharepoint

MS Word

Relatics

SAP

Se

rvic

es

Viewer2D / 3D

BIM Data Management

CrystalReports

SingleSign-On

OCR

Adobe PDF

BCFManagement

Co

re

DrawingManagement

RFI, RFC

PhotoSite Diary

BIMManagement

BIMReview Board

Fotodoku-mentation

…yourModule

DefectManagement

DocumentManagement

Mo

du

les

think project! Photo

think project!

think project! Quality

Ap

pli

ca

tio

ns

Page 6: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 7

BIM-PROJECTSEXCERPT

› Adidas World of Sports, Herzogenaurach

› Albvorlandtunnel, Wendlingen-Ulm

› Alexanderquartier Berlin

› Aquapark Erweiterung, Oberhausen

› Axel Springer Berlin

› Eventcenters, Attendorn

› DB Station&Service AG, various

› Flare of Frankfurt, Frankfurt

› Frankfurter Volksbank, Berger Straße

› Gauchachtalrücke, Döggingen

› Gewerbezentrum, Zug

› Klebl, various

› Marina Gardens, Offenbach

› Neubau Soka, Welfenhof Wiesbaden

› Sanierung & Neubau Klinikum BS

› Siemens Office, Zug

› Springer Quartier, Berlin

› Stuttgarter Tor, Reutlingen

› Viega Eventcenters, Attendorn

› Wüstenroth Campus, Ludwigsburg

Page 7: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 8

BIM LEVELS OF MATURITYUK & SWITZERLAND

Source: UK BIM Task Group 2008, Bauen Digital Schweiz & buildingSMART Schweiz

Status Quo Model-based design

Communicating systems

Model-based design

Document-basedcollaboration

Model-based design

Manual, container-basedcollaboration

Model-based design

Integrated, automated model-based collaboration

Page 8: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 9

POINT OF ADOPTIONBIM FRAMEWORK.INFO

› Level of Data Integration 1

› Level of Business Adoption 2

Quellen: BIM Capability Stages & BIM Maturity Index, cf. Succar, B. and Kassem, M. (2016), Building Information Modelling: Point of Adoption, CIB World Congress, Tampere Finland, 2016 or https://bimexcellence.org

localmodels

sharedmodels

connectedelement

information

integratedelement &

contextinformation

no BIM

Page 9: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 10

ADOPTION IN APPLICATION AREASHAMBURG PORT AUTHORITY

BIM Level 1modelling

design, construction

BIM level 1modelling

as-built

BIM level 2model coordination

and review

BIM level 2-3decision processes

Page 10: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 12

› More participants and organisations

› More applications project phases

› Increase level of automation

• In each application area

• Integrating application areas

MATURITY OF COLLABORATIONON EACH LEVEL

PROZESSE

Linked dataand processes

Integrated systems

Workflow automation

Sharedinformation

Structured communication

Page 11: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 13

Data container

Classification / coding

Versioning / audit trail

Access / rights

Archive

MATURITY OF COLLABORATIONDOCUMENTS / DRAWINGS

PROZESSE PROZESSEPROZESSE

Distribution lists

Tasks / responsibilities

Status / approvals

Rule-based distribution

Schedule controlling

Conditional approvals

Drawing packages

Repro jobs

Review mark-ups and tickets

Follow-up processes (changes, billings, etc.)

Dashboard / Reports

Metadata / QR printing

Mobile Version Check

2D Viewing

Sharedinformation

Linked dataand processes

Structured communication

Integrated systems

Workflow automation

Page 12: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 14

Coded drawings

DOCUMENT / DRAWING MANAGEMENT DB STATION&SERVICE

Classified documents

Page 13: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 15

DRAWING / DESIGN MANAGEMENT SAAONE

Planning and Controlling

Primavera P6

Relatics via think project! connector

Design progress monitoring

Review and Approval

Synchronised models with mark-ups

Digital signature printing

QR Codes and Mobile Version Check

Workflows

Drawing approval workflow

with 5 level and up to 26 reviewers

Page 14: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 16

Workflow automation

Data container

Classification / coding

Versioning / audit trail

Access / rights

Archive

MATURITY OF COLLABORATIONMODEL MANAGEMENT / COORDINATION

PROZESSE PROZESSEPROZESSE

Distribution lists

Tasks / responsibilities

Status / approvals

Rule-based distribution

Schedule controlling

Conditional approvals

Coordination models

Review mark-ups and tickets

Linked drawings / documents

3D Viewing

Model checking

BCF integration

BCF reports

Sharedinformation

Linked dataand processes

Structured communication

Integrated systems

Page 15: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 17

BIM INFORMATIONBIM LEVEL 2 COLLABORATION

Source: based on VDI 2552 Part 5

RFI

Page 16: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 18

BIM COORDINATION AND REVIEWIN COORDINATION MODELS

Revision +1

Revision +1

Revision +1

Revision +1

Revision +1

Page 17: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 19

BIM COORDINATION AND REVIEWLINKED MODELS AND 3D MARKER

Modelldaten IB&T

Page 18: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 20

BIM COORDINATION AND REVIEWLINKED MODELS AND 3D MARKER

Modelldaten IB&T

Page 19: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 22

BIM COORDINATION AND REVIEWREVIEWS / TASKS

Modelldaten IB&T

Page 20: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 23

MODEL COORDINATION AND APPROVAL PROCESSHAMBURG PORT AUTHORITY

Source: Design for model coordination and approcal process at Hamburg Port Authority

design and revise

De

sig

n A

design and revise

De

sig

n B

request, coordinate, approve

Co

ord

ina

tio

n

shared informationcommunication

thin

k p

roje

ct!

Page 21: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 24

MODEL COORDINATION AND APPROVAL PROCESSHAMBURG PORT AUTHORITY

Source: Design for model coordination and approcal process at Hamburg Port Authority

Re

qu

ire

me

nts

Ap

pro

va

l

Model check w/o BCF Model coordination w/o BCF

Page 22: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 25

Versioning / audit trail

Access / rights

Archive

MATURITY OF COLLABORATIONQUALITY MANAGEMENT

PROZESSE PROZESSEPROZESSE

Conformant issue forms

Access / editing rights

Responsibilities / deadlines

Status / comments / approvals

Rule-based assignment

Conditional approvals

Issue monitoring

Paper forms

Referenced 3D marker

Referenced design documentation(drawing, contract, model)

Mobile Photo app

Mobile Quality app

QR code print/scan

Sharedinformation

Linked dataand processes

Structured communication

Integrated systems

Workflow automation

Page 23: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 26

DEFECT AND WARRANTY MANAGEMENT SIEDLUNGSWERK

Project manager

Reporting, controlling

Construction manager

Coordination

Contractor

Resolution, reporting

Max MustermannBeispielweg 100

12345 Musterstadt

20082 – PROJEKTNAME

Bob der Baumeister089 / 12 34 56 089 / 87 65 43 [email protected]

01.01.215

Page 24: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 27

QUALITY MANAGEMENTMARKGRAF

Wohngebäude Haydnstraße, München Bürogebäude Imtech-Haus, Planegg

Forms / Workflows

› Request for information

› Request for change

› Constructability concerns

› Hold-up notifications

› Progress reporting

› Photo documentation

› Conformity Management

› Rebar inspection

› Fire protection records

› Defect management

› Warranty Management

› … many more

Page 25: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! think project! // cross-enterprise collaboration Page 28

QUALITY MANAGEMENTMARKGRAF

Forms / Workflows

› Request for information

› Request for change

› Constructability concerns

› Hold-up notifications

› Progress reporting

› Photo documentation

› Conformity Management

› Rebar inspection

› Fire protection records

› Defect management

› Warranty Management

› … many more

Page 26: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 29

› Build up collaboration expertise

• Document and drawing management

• Model management and coordination

• Quality managment

› Approach BIM Level 3

• Model information

• querying and extraction

• Element linking

• drawing, reports,

• specifications,

• photos, processses

MATURITY OF COLLABORATIONNEXT LEVEL

Page 27: MANAGING DIGITAL TRANSFORMATION - BIM FROM PILOT TO … · VDI Seminar “BIM: Kollaboration - Prozesse – Software” Page 5 COMMON DATA ENVIRONMENT SERVICES / MODULES / APPLICATIONS

© think project! thinkproject.com