Managing Category I and Managing Category I and II ACM During II ACM During Decontamination and Decontamination and Demolition Demolition Lydia A. Birk ETTP D&D and RA Manager of Projects Robert J. Devol ETTP D&D and RA Industrial Hygienist This document is approved for public release per review by: D.C. Lannom / DC 8/6/2009 BJC ETTP Classification & Date Prepared for the U.S. Department of Energy Office of Environmental Management BECHTEL JACOBS COMPANY LLC Managing the Environmental Management Activities At the East Tennessee Technology Park Y-12 Security Complex Oak Ridge National Laboratory Under contract DE-AC-98OR22700 For the U.S. DEPARTMENT OF ENERGY

description

Managing Category I and II ACM During Decontamination and Demolition. Lydia A. Birk ETTP D&D and RA Manager of Projects Robert J. Devol ETTP D&D and RA Industrial Hygienist. Prepared for the U.S. Department of Energy Office of Environmental Management BECHTEL JACOBS COMPANY LLC - PowerPoint PPT Presentation

Transcript of Managing Category I and II ACM During Decontamination and Demolition

Page 1: Managing Category I and II ACM During Decontamination and Demolition

Managing Category I and II ACM Managing Category I and II ACM During Decontamination and During Decontamination and

DemolitionDemolition

Lydia A. BirkETTP D&D and RA Manager of Projects

Robert J. DevolETTP D&D and RA Industrial Hygienist

This document is approved for public release per review by:

D.C. Lannom / DC 8/6/2009

BJC ETTP Classification & Date

Information Control Office

Prepared for the U.S. Department of EnergyOffice of Environmental ManagementBECHTEL JACOBS COMPANY LLC

Managing the Environmental Management ActivitiesAt the East Tennessee Technology Park

Y-12 Security Complex Oak Ridge National LaboratoryUnder contract DE-AC-98OR22700

For the U.S. DEPARTMENT OF ENERGY

Page 2: Managing Category I and II ACM During Decontamination and Demolition

Lydia Birk– Manager of Projects - ETTP D&D and RA Project– ETTP D&D Remaining Facilities Project Manager since

October 2002

Robert Devol– BJC Industrial Hygienist– BJC Asbestos Technical Expert– Worked in IH at ETTP since 1989– BS Degree in Environmental Science

Page 3: Managing Category I and II ACM During Decontamination and Demolition

IntroductionIntroduction

Page 4: Managing Category I and II ACM During Decontamination and Demolition

ETTP Site MapETTP Site Map

Page 5: Managing Category I and II ACM During Decontamination and Demolition

ETTP Remaining Facilities D&D ProjectETTP Remaining Facilities D&D Project

525 surplus facilities to be D&D at the ETTP.

Challenges presented early in the project with asbestos abatement.

- very costly - very time consuming and labor intensive. - higher injury rates (cuts, strains, heat stress)

Six Sigma Project established to find more efficient D&D method - reduce the amount of asbestos removed from the

buildings - reduces risk due to challenges above.

Page 6: Managing Category I and II ACM During Decontamination and Demolition

K-1320K-1320

Page 7: Managing Category I and II ACM During Decontamination and Demolition

K-1035K-1035

Page 8: Managing Category I and II ACM During Decontamination and Demolition

RegulationsRegulations

OSHA – Worker ProtectionFour Classes of Work

– Class I – TSI and Surfacing– Class II – Other than TSI/Surfacing– Class III – Maintenance– Class IV – Janitorial

OSHA does not mandate removal of ACM prior to building demolition

Page 9: Managing Category I and II ACM During Decontamination and Demolition

EPA Category I and II MaterialsEPA Category I and II Materials

Page 10: Managing Category I and II ACM During Decontamination and Demolition

Practical ApplicationPractical Application

Key Players– Regulators

• EPA (Region 9)

• TDEC

– Landfill• Onsite Landfills (Y-12 Sanitary Landfill/EMWMF)

– Asbestos Inspector

– Asbestos Project Designer

Two Cases at ETTP

Page 11: Managing Category I and II ACM During Decontamination and Demolition

ControlsControls

InspectionsRegulated AreasAir monitoringPersonal Protective Equipment

Page 12: Managing Category I and II ACM During Decontamination and Demolition

ControlsControls

Wet methods– Use of surfactant with misters

Dedicated trucks– Leak tight/dust tight– Supersacks

• Lace closure vs. zipper closure

Page 13: Managing Category I and II ACM During Decontamination and Demolition

Advantages to ApproachAdvantages to Approach

Enhanced safetyShortened schedulesIncreased productivityCost savings