Agenda• Projects Overview
Fuel Stock & Thermal Performance Manual & LP Development
Station Efficiency Losses Oil Optimisation Air Heaters Performance Analysis Works Power Analysis HP Heater Replacement Validity Biomass Throughput Tracking Additional Tasks
• Personal Development At Aberthaw• Further Questions
Fuel Stock & Thermal Performance Accounting
• Response to failing to close off monthly heat account
• Heat account run by one source• No procedure for heat accounting• Trailed and tested• EUETS support• Deliverables;
Document of manualsLocal procedure
Fuel Stock & Thermal Performance Accounting
Station Efficiency Analysis• Already evaluating of CPI losses and TEMP raw data
• Administrating heat account• Quantify losses• Required;
TEMP losses reportAnalysis tool
Unb
urnt
Car
bon
Leak
age
Con
dens
er V
acuu
m D
evia
tion
Fina
l Fee
d W
ater
Tem
p. D
evia
-tio
n
Unb
urnt
Gas
Los
s
Ste
am T
empe
ratu
re D
evia
tion
Reh
eat S
team
Tem
p. D
evia
tion
Exc
ess
Air
Gas
Tem
p R
ise
0100000200000300000400000500000
Station
Station
GJ
Station Efficiency Analysis
M01W01
M01W04
M02W03
M03W02
M04W01
M04W04
M05W03
M06W
02
M07W01
M07W04
M08W03
M09W02
M10W01
M10W04
M11W03
M12W02
0
1000
2000
3000
4000
5000
6000
7000
8000
Unit Leakage
Unit 7Unit 8Unit 9
GJ
2015
M08W1
2015
M08W4
2015
M09W3
2015
M10W2
2015
M11W1
2015
M11W4
2015
M12W3
2016
M01W2
2016
M02W1
2016
M02W4
2016
M03W3
2016
M04W2
2016
M05W1
2016
M05W4
2016
M06W3
2016
M07W2
0
1000
2000
3000
4000
5000
6000
7000
8000
Unit Leakage
Unit 7Unit 8Unit 9
GJ
• Improvement demonstration.
• Actions from losses• Surveys (on/off load)• Reduction in water
leakage as an example.
Oil Optimisation• Over usage on starts identified• On-load usage analysed to asses opportunity for tech
data changes• Target areas for further reductions
• U7 & 9 ashing• U8 PF temps• Established tech data
change
2016
M01
2016
M02
2016
M03
2016
M04
2016
M05
2016
M06
2016
M070.00%0.20%0.40%0.60%0.80%1.00%1.20%1.40%1.60%1.80%
Station Oil Usage
Station Oil UseTarget Onload Usage
Fire Change
Furnace Stability
Low Mill Temps
Ashing Load Support
Other0.0%5.0%
10.0%15.0%20.0%25.0%30.0%35.0%40.0%45.0%50.0%
Percentage Of Total Oil Burn
Unit 7Unit 8Unit 9
Oil Optimisation• Temperature difference analysis carried out on unit 9• No real value in pursuing• Identification of further work• Revisit post Hi-Vol
Average Temp. Diff.
CA Mill 2B Mill 2C Mill 3D Mill 3E Mill 5F Mill 5
Overall Average 3
Energy World Air Heater Performance
• Instrumentation route not viable• Testing strategy was reactive not
proactive• Requiring pre planned programme
10/25
/2002
10/25
/2003
10/25
/2004
10/25
/2005
10/25
/2006
10/25
/2007
10/25
/2008
10/25
/2009
10/25
/2010
10/25
/2011
10/25
/2012
10/25
/2013
10/25
/2014
10/25
/2015
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
120.0%
140.0%
Mill A/H A LeakageMill A/H B LeakageMain A/H A LeakageMain A/H B LeakageNormal MainNormal MillRepair MainRepair Mill
Lea
kage
(% O
2)
Energy World Air Heater Performance
• Weekly monitoring; o Cold side efficiencyo Hot air to mills o Main air heater outlet temperatureo Mill and main air heater diff. pressureso FD, ID & PA fan amps
Air Heater Ingress Assessment
Boiler Air Ingress
Assessment
Air Heater Leakage
Assessment
Imported Works Power• Assessment of station usage against business
plan
• 2016 consumption 11.7 MW
• FGD matrix control to be assessed
• 0.5 MW worth ~£600k[1] [2]
[1] Based on current works power prices of £35/MWh[2] Using 2017 – 2023 business plan running
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 280.0
5.0
10.0
15.0
20.0
25.0 Adjusted Works Power Usage 2016
Adjusted Total Works Power (MW) Adjusted TX 3 & 4 Usage (MW)FGD Usage (MW) Target (MW)
TEMP Week
MW
HP Heater Replacement Validity• Stations most common reliability issue• 2016 losses estimated at £300k• Approx. £800k losses from 2017 to 2023• Approx. £3.6 million for units heater replacement
2017 2018 2019 2020 2021 2022 2023
Efficiency (£)Unit 7 £34,000 £38,000 £42,000 £7,000 £7,000 £7,000 £8,000Unit 8 £32,000 £32,000 £35,000 £6,000 £6,000 £6,000 £7,000Unit 9 £32,000 £36,000 £39,000 £6,000 £6,000 £7,000 £7,000
Reliability Cost (£)
Unit 7 £36,000 £40,000 £45,000 £7,000 £8,000 £8,000 £8,000Unit 8 £30,000 £23,000 £37,000 £6,000 £6,000 £6,000 £7,000Unit 9 £33,000 £28,000 £41,000 £6,000 £7,000 £7,000 £8,000
Total Annual Cost Station £197,000 £197,000 £239,000 £38,000 £40,000 £41,000 £45,000
Biomass Throughput Tracking
Janu
ary
Februa
ryMarc
hApri
lMay
June Ju
ly
Augus
t
Septem
ber
Octobe
r
Novem
ber
Decem
ber
0
1000
2000
3000
4000
5000
6000
0.0%10.0%20.0%30.0%40.0%50.0%60.0%70.0%80.0%90.0%100.0%
Actual Burn Target Burn % Of Target Burn
Tonn
es
% O
f Tar
get B
urnt
Janu
ary
Februa
ryMarc
hApri
lMay
June Ju
ly
Augus
t
Septem
ber
Octobe
r
Novem
ber
Decem
ber
0100020003000400050006000700080009000
0.0%10.0%20.0%30.0%40.0%50.0%60.0%70.0%80.0%90.0%100.0%
Actual Burn Target Burn % Of Target Burn
Tonn
es
% O
f Tar
get B
urn
• Budget constraints overtaken progression• Fuel availability issues going forward
Phase 1
Phase 2
Additional Tasks• TEMP data QA tool• Quarterly & annual weighbridge report.• Taking meeting minutes (Combustion CIG,
P&C Bi Weekly)• Damper checks (BSOD’s, SAD’s, TAD’s etc.)• Air heater cross leakage• Unit water leakage• Flowrate’s (CW to quick starts)• Unit 9 low NOx commissioning• 1 month secondment to operations• 2 weeks at Pembroke
My Personal Development At Aberthaw• Confidence & character building• Development of safety awareness• Improvement in presentation skills• Enhancement in computational skills• Exposure to commercial operations • Integration into problem solving
tasks• Handover process